ASArif Budi Sulistyo

Arif Budi Sulistyo

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Arif Budi Sulistyo has a total of 35 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Analisa Pengaruh Kualitas Batubara Terhadap Efisiensi Boiler Menggunakan Metode Statistical Process Control di Pembangkit Listrik Tenaga Uap

    by Arif Budi Sulistyo, Nuraisah Nuraisah

    Penelitian ini bertujuan untuk menganalisis pengaruh kualitas batubara terhadap efisiensi pembakaran pada Boiler Unit 4 Pembangkit Listrik Tenaga Uap serta mengevaluasi strategi pencampuran batubara dari berbagai pemasok. Parameter kualitas yang diamati meliputi kadar air total, kadar air inherent, kadar abu, zat terbang, karbon tetap, total sulfur, dan nilai kalor. Variasi kualitas batubara diidentifikasi menggunakan metode Statistical Process Control untuk mengetahui keterkaitannya dengan kinerja boiler. Hasil penelitian menunjukkan bahwa kadar air total, total sulfur, dan nilai kalor merupakan faktor yang paling memengaruhi efisiensi, dengan rata-rata efisiensi aktual hanya 83,96%. Simulasi pencampuran batubara dengan proporsi pemasok tertentu dapat meningkatkan efisiensi hingga 88,00% dengan tetap memenuhi spesifikasi kualitas. Analisis lebih lanjut menggunakan pendekatan 5W+1H mengungkap faktor penyebab lain yang berasal dari aspek manusia, mesin, material, metode, dan lingkungan. Penelitian ini menyimpulkan bahwa pencampuran batubara efektif untuk meningkatkan efisiensi, yaitu dari 3 supplier dengan proporsi masing-masing 30%, 40%, dan 30% namun perlu didukung pemilihan pemasok dengan kualitas lebih baik dan pengendalian mutu yang ketat. Usulan perbaikan yang diberikan adalah pembuatan standar operasional mengenai strategi blending, mengembangkan progam pelatihan bagi operator dalam menghadapi variasi kualitas batu bara, dan investasi infrastruktur penyimpanan tertutup batu bara agar kualitasnya lebih terjaga.

  • Optimasi Pemakaian Steam pada Proses Refinery CPO dengan Pendekatan TPM Focus Improvement

    by Arif Budi Sulistyo, Hartadi Wijaya, Nur Hidayanti, Fikri Fadhilah

    PT. MNA is a partner in the palm oil processing industry and its derivatives, primarily aimed at producing cooking oil. The refinery process of Crude Palm Oil (CPO) is one of the production stages that requires high energy consumption, particularly in the form of steam. This study aims to identify the level of steam usage in the refinery process and to explore opportunities for optimization and energy savings. The methods used include the Kaizen approach and Total Productive Maintenance (TPM). Initial analysis showed that steam consumption at PT. MNA reached 204,000 kg per month, with the highest usage occurring in the steam drying SBE process (82.97%), followed by steam heating PHE (10.82%), and steam heating hot water (6.21%). Based on a Pareto analysis, the improvement focus was placed on the steam drying SBE process. The implementation of improvements through reducing process time from 850 seconds to 700 seconds proved effective without disrupting other processes. As a result, steam consumption was successfully reduced to 168,000 kg per month, while the oil content in SBE remained within the company’s target of 20–22%. Therefore, the TPM Focus Improvement and Kaizen approaches have been proven effective in optimizing steam usage in the CPO refinery process. PT. MNA sebagai mitra bidang pengolahan minyak kelapa sawit dan turunannya untuk menghasilkan minyak goreng. Proses refinery Crude Palm Oil (CPO) merupakan salah satu tahapan produksi yang memerlukan konsumsi energi dalam jumlah besar, terutama dalam bentuk steam. Penelitian ini bertujuan untuk mengetahui tingkat penggunaan steam pada proses refinery serta mengidentifikasi peluang optimasi dan penghematan energi. Metode yang digunakan meliputi pendekatan Kaizen dan TPM (Total Productive Maintenance). Hasil analisis awal menunjukkan bahwa konsumsi steam di PT. MNA mencapai 204.000 kg per bulan, dengan penggunaan terbesar terdapat pada proses steam drying SBE sebesar 82,97%, disusul steam heating PHE sebesar 10,82% dan steam heating hotwater sebesar 6,21%. Berdasarkan analisis Pareto, fokus perbaikan difokuskan pada proses steam drying SBE. Implementasi perbaikan dengan pengurangan waktu proses dari 850 detik menjadi 700 detik terbukti efektif tanpa mengganggu proses lainnya. Hasilnya, konsumsi steam berhasil dikurangi menjadi 168.000 kg per bulan, serta kadar oil content pada SBE tetap berada dalam target perusahaan yaitu 20–22%. Dengan demikian, pendekatan TPM Focus Improvement dan Kaizen terbukti efektif dalam mengoptimalkan pemakaian steam pada proses refinery CPO.

  • Open Access

    Maintenance Analysis of Multi Mover M600U by Using Reliability Centred Maintenance Method

    by Arif Budi Sulistyo, Aji Eka Saputra

    PT XYZ is a manufacturing company that provides hot metal transportation handling services and supports Blast Furnace (BF) operations at the Krakatau Posco Plant using heavy equipment, namely Multi Mover M600U. To ensure smooth production processes, effective and efficient maintenance management of the heavy equipment are essential to enhance reliability. This study evaluates potential failure modes, their impacts and appropriate handling measures for the Multi Mover M600U using the Failure Mode and Effect Analysis (FMEA) method. The result of the study shows the highest Risk Priority Number (RPN) value of 350 in the Electrical PLC component, with a total RPN of 777 for the Electrical and Brake systems. These findings indicate that the Electrical and Brake systems have the highest failure rates due to downtime compared to other systems. Through the Reliability Centred Maintenance (RCM) approach, this study proposes a maintenance scheduling plan to minimize the risk of sudden downtimes, and their impacts on time and maintenance costs.Keywords - Downtime, Failure Mode and Effect Analysis, Heavy Equipment Maintenance, Reliability Centred Maintenance, Risk Priority Number.

  • Open Access

    Analisa Beban Kerja Fisik dan Mental Dengan Metode CVL dan NASA TLX pada Departemen Maintenance di Perusahaan Otomotif

    by Arif Budi Sulistyo, Islahudin Islahudin

    Penelitian ini bertujuan untuk mengevaluasi beban kerja fisik dan mental mekanik di departemen maintenance perusahaan otomotif yang menangani hingga 3.000 unit motor per bulan dengan 13 orang tenaga kerja. Beberapa mekanik mengalami ketidaknyamanan fisik, seperti nyeri punggung, sehingga diperlukan analisis tingkat beban kerja. Pengukuran beban kerja fisik dilakukan dengan metode Cardiovascular Load (CVL), sedangkan beban kerja mental dinilai menggunakan metode NASA-TLX yang berbasis persepsi subjektif pekerja. Hasil menunjukkan bahwa 7 dari 13 mekanik tergolong dalam kategori “diperlukan istirahat” menurut klasifikasi CVL, sementara 6 lainnya tidak menunjukkan tanda kelelahan fisik signifikan. Dari sisi mental, 8 mekanik berada pada kategori beban sedang dan 5 mekanik pada kategori rendah, dengan rata-rata skor di bawah 80%, menunjukkan bahwa beban mental tidak menjadi masalah utama. Disarankan adanya edukasi mengenai gaya hidup sehat, istirahat yang cukup, serta penyediaan fasilitas penunjang seperti program kebugaran di tempat kerja. Upaya ini bertujuan untuk mengurangi kelelahan fisik dan meningkatkan produktivitas kerja.

  • Open Access

    Developing an Industry-Specific Lean 4.0 Readiness Assessment Tool: A Case for the Chemical Sector

    by Arif Budi Sulistyo, Putu Dana Karningsih, Samira Alvandi

    In an era where digital transformation is increasingly imperative, many industries struggle to navigate the complexities of technological adoption and operational efficiency. Lean principles, which emphasize waste reduction and process optimization, provide a robust foundation for digital transformation, particularly in the chemical industry, where unique operational challenges exist. This research aims to develop an integrated Lean 4.0 readiness assessment tool to bridge the gap between leanness and Industry 4.0 readiness. The study begins with a literature review on existing lean and Industry 4.0 readiness measurement tools and integrates them to create a new framework, using the Indonesia Industry 4.0 Readiness Index (INDI 4.0) as a reference, tailored specifically to the chemical industry. Expert interviews are conducted to refine the assessment tool, ensuring alignment with real-world industry conditions and practical insights. A Delphi-based expert consensus method combined with a fuzzy approach for handling imprecision in indicator ratings is employed to validate the framework, resulting in five key dimensions and 86 indicators. By gathering expert input, the tool addresses the chemical industry’s specific challenges and simplifies readiness evaluation, helping companies assess their preparedness for digital transformation and identify areas for improvement. The resulting framework enables chemical companies to bridge readiness gaps and prioritize targeted enhancements. Furthermore, this tool has the potential to serve as a scalable model for other industries, fostering more efficient and strategic digital transformation aligned with Industry 4.0 objectives globally.


  • Open Access

    Analisis Penerapan Total Productive Maintenance (TPM) dengan Perhitungan Overall Equipment Effectiveness (OEE) pada Mesin Sewing di PT Parkland World Indonesia

    by Arif Budi Sulistyo, Nurmaulana, Sri Mukti Wirawati

    Meningkatkan produktivitas dan menjaga kualitas adalah prioritas PT Parkland World Indonesia dengan menerapkan Total Productive Maintenance untuk mempertahankan dan meningkatkan kinerja mesin menjadi lebih efisien dan efektif. Penelitian dilakukan pada Building 1 Line 4 yang terdiri dari proses cutting, stitching dan assembly hingga menghasilkan produksi sepatu, bertujuan untuk mengetahui bagaimana kondisi perawatan dan tingkat efisiensi lini 4 serta memberikan saran yang tepat untuk meningkatkan efisiensi mesin sewing pada line 4. Setelah dilakukan penelitian, diperoleh nilai Overall Equipment Effectiveness yang tertinggi dengan presentasi sebesar 89%, sedangkan nilai terendah dengan presentasi sebesar 73%. Faktor Six Big Losses yang paling mempengaruhi terhadap rendahnya efektivitas mesin sewing yaitu Idling Minor Stoppage dengan total time losses sebesar 16.298 menit. Untuk meningkatkan efektifitas mesin sewing, perusahaan harus mengikuti jadwal perawatan secara ketat, kerjasama yang baik antar divisi dan peningkatan motivasi karyawan berupa seminar dengan harapan losses akan berkurang dan performa produksi meningkat.


  • Open Access

    ANALISIS PERSEDIAAN KEMASAN DRUM STEEL MENGGUNAKAN METODE JUST IN TIME DI PT. TUNAS SUMBER IDEA KREASI KIMIA

    by Maftuhi, Arif Budi Sulistyo

    PT Tunas Sumber Idea Kreasi Kimia is a company engaged in chemical production, such as alkyd resin, amino resin, acrylic resin and latex emulsion. The purpose of this study is to overcome the excess inventory of steel drum type packaging which causes losses because there are inventory costs consisting of purchase costs, ordering costs and storage costs. The method used in this research is the Just in Time (JIT) method. The results showed that the Just in Time (JIT) method obtained an inventory cost of Rp. 5,244,056,000 which is 10% more efficient than the calculation results according to company policy which obtained an inventory cost of Rp. 5,816,152,000 or a savings of Rp. 572,096,000. So that the Just in Time method can be applied at PT Tunas Sumber Idea Kreasi Kimia to save on inventory costs and improve the company's operational efficiency.

  • Open Access

    Analytical Hierarchy Process pada Pemilihan Pemasok Mata Gerinda Flap Disk 100

    by Arif Budi Sulistyo, Anita Dyah Juniarti, Imron Rosyadi

    PT Teknik Manunggal Perkasa is a company operating in the fields of general contractor and supplier (welding equipment, safety equipment, pipe fitting, and flange). The company need sustainable or permanent suppliers to guarantee availability of goods, on-time delivery, appropriate quality, and price certainty. Recently, the company does not have a permanent supplier for spare parts of 100-flap disc grinding wheel. The aim of this research is determining order of factors to consider supplier selection and choose the best supplier for the grinding wheel. This research uses the Analytical Hierarchy Process (AHP) method. The data collection technique is using questionnaire about criteria, sub-criteria, and alternative suppliers from various divisions that are directly related to purchasing process. The results of research shows that the most influential criteria in selecting a grinding wheel supplier are quality criteria with weighting 0,376; followed by the price criterion with weighting 0,355; quantity accuracy with weighting 0,113; delivery with a weighting 0,097; and finally service criteria with weighting of 0,059. Meanwhile, the best supplier is PT ST, shows highest weighting 0,419; following by PT JM with weighting 0,215; PT SM with weighting 0,202; and the last rank is PT CJ with weighting 0,164.AbstrakPT Teknik Manunggal Perkasa adalah perusahaan yang bergerak di bidang general contractor dan supplier (welding equipment, safety equipment, pipe fitting and flange). Perusahaan sangat memerlukan pemasok barang yang continue atau tetap untuk menjamin ketersediaan barang, ketepatan waktu pengiriman, kualitas yang sesuai dan kepastian harga. Saat ini perusahaan belum memiliki pemasok tetap untuk spare part mata gerinda flap disk 100. Penelitian ini bertujuanh untuk menentukan urutan faktor yang mempengaruhi pemilihan pemasok dan memilih pemasok terbaik untuk mata gerinda tersebut dengan menggunakan metode Analytical Hierarchy Process (AHP). Teknik pengumpulan data menggunakan kuesioner mengenai kriteria, sub kriteria dan alternatif pemasok dari berbagai divisi yang berhubungan langsung pada proses pembelian. Hasil dari penelitian ini menunjukkan bahwa kriteria yang paling berpengaruh dalam pemilihan pemasok mata gerinda adalah kriteria kualitas dengan bobot 0,376; kemudian diikuti oleh kriteria harga dengan bobot 0,355; ketepatan jumlah dengan bobot 0,113; pengiriman dengan bobot 0,097 dan terakhir adalah kriteria pelayanan dengan bobot 0,059. Sedangkan pemasok terbaik adalah PT ST dengan bobot paling tinggi yaitu 0,419; selanjutnya. PT JM dengan bobot 0,215; PT SM dengan bobot 0,202 dan peringkat terakhir adalah PT CJ dengan bobot 0,164.

  • Open Access

    Analisis Kerusakan Motor Listrik di Unit Pemurnian Brine PT. XYZ dengan Metode FMEA

    by Pugy Gautama, Riki Ardiansya, Arif Budi Sulistyo

    Kebutuhan dan penggunaan motor listrik untuk berbagai keperluan industri semakin meningkat. Di dunia industri, banyak sekali dijumpai berbagai macam jenis motor listrik sebagai alat penggerak untuk menggerakan berbagai macam mesin dan peralatan yang dibutuhkan di industri. Di PT XYZ khususnya di Plant Chlor Alkali unit pemurnian larutan brine ada beberapa motor listrik yang sering mengalami masalah pada komponenya dalam setiap tahunnya. Dampak dan kerugian yang terjadi apabila mengalami kerusakan pada mesin atau motor dapat mempengaruhi kualitas produk dan unit pemurnian brine tidak bisa beroperasi (shutdown). Penelitian ini menggunakan metode FMEA. Hasil penelitian adalah terdapat 2 jenis kerusakan pada motor listrik yaitu bearing noise dan coil short. Nilai RPN pada jenis kerusakan bearing noise sebesar 93,75 dan coil short sebesar 76. Usulan perbaikan yang dapat dilakukan untuk mengurangi kerusakan motor listrik yaitu dengan perawatan dan pencegahan kerusakan motor listrik di PT XYZ dilakukan dengan cara visual, pemeriksaan dan penggantian komponen motor listrik dengan mengikuti jadwal perawatan yang dibuat mingguan, bulanan dan tahunan

  • Open Access

    Improving implementation of occupational health and safety of construction company by Job Safety Analysis (JSA) method (study case at PT Arto Moro Sentosa)

    by Arif Budi Sulistyo, Nugroho Pratama Putra, Hartadi Wijaya, Nur Hidayanti

    The construction sector is a sector that employs many people who have high risk of work accidents, because a lot of work in this sector is possibility carried out by unsafe actions or unsafe conditions. PT. Arto Moro Sentosa is company which operates in general trading, general construction, suppliers, outsourcing, etc., is aware that the business has a high risk of work accidents. The lack of employee awareness will have an impact on the magnitude of the risks that must be borne by the worker and the company. The purpose of this research is determining work accident records for the Occupational Health and Safety (OHS) system, employee risks, and existing improvements at company. By knowing the classification of hazards based on the type of accident, this research uses the Job Safety Analysis (JSA) method, histograms, Pareto diagrams, and cause-and-effect (fish bone) diagrams. Based on the author's observations, company data related to OHS (Occupational Health and Safety) and interviews with the directors, could be obtained a history of work accidents based on the type of accident. Here are ergonomic work accidents (57.89%), physical factor accidents ( 31.58%), chemical factor accidents (5.26%), biological factor accidents (5.26%), and psychological factor accidents (0%). Several recommendation is performed to avoid repeated accident by providing training programs on OHS to workers, paying more attention to OHS supervision, giving sanctions to workers who violate OHS.