Xingkai Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Xingkai Zhang has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Baozhen Zhang
School of Emergency Management and Safety Engineering, China University of Mining and Technology-Beijing, Beijing 100083, China
1 shared publication - Hongqing Zhu
China University of Mining and Technology-Beijing
1 shared publication - Qi Yuan
School of Emergency Management and Safety Engineering, China University of Mining and Technology-Beijing, D11 Xueyuan Road, Haidian District, Beijing 100083, China
1 shared publication - Xiaolei Zhang
China Academy of Safety Science and Technology, Beijing 100012, China
1 shared publication
Latest Publications
- Open Access
- 16 December 2022
- Published by MDPI AG in International Journal of Environmental Research and Public Health
- Vol. 19 (24) , 16934
An Integrated Quantitative Risk Assessment Method for Underground Engineering Fires
Fires are one of the main disasters in underground engineering. In order to comprehensively describe and evaluate the risk of underground engineering fires, this study proposes a UEF risk assessment method based on EPB-FBN. Firstly, based on the EPB model, the static and dynamic information of the fire, such as the cause, occurrence, hazard, product, consequence, and emergency rescue, was analyzed. An EPB model of underground engineering fires was established, and the EPB model was transformed into a BN structure through the conversion rules. Secondly, a fuzzy number was used to describe the state of UEF variable nodes, and a fuzzy conditional probability table was established to describe the uncertain logical relationship between UEF nodes. In order to make full use of the expert knowledge and empirical data, the probability was divided into intervals, and a triangulated fuzzy number was used to represent the linguistic variables judged by experts. The α-weighted valuation method was used for de-fuzzification, and the exact conditional probability table parameters were obtained. Through fuzzy Bayesian inference, the key risk factors can be identified, the sensitivity value of key factors can be calculated, and the maximum risk chain can be found in the case of known evidence. Finally, the method was applied to the deductive analysis of three scenarios. The results show that the model can provide realistic analysis ideas for fire safety evaluation and emergency management of underground engineering. The proposed EPB risk assessment model provides a new perspective for the analysis of UEF accidents and contributes to the ongoing development of UEF research.
- 16 December 2022
- Published by MDPI AG in International Journal of Environmental Research and Public Health
- Vol. 19 (24) , 16934
Open AccessAn Integrated Quantitative Risk Assessment Method for Underground Engineering Fires
Fires are one of the main disasters in underground engineering. In order to comprehensively describe and evaluate the risk of underground engineering fires, this study proposes a UEF risk assessment method based on EPB-FBN. Firstly, based on the EPB model, the static and dynamic information of the fire, such as the cause, occurrence, hazard, product, consequence, and emergency rescue, was analyzed. An EPB model of underground engineering fires was established, and the EPB model was transformed into a BN structure through the conversion rules. Secondly, a fuzzy number was used to describe the state of UEF variable nodes, and a fuzzy conditional probability table was established to describe the uncertain logical relationship between UEF nodes. In order to make full use of the expert knowledge and empirical data, the probability was divided into intervals, and a triangulated fuzzy number was used to represent the linguistic variables judged by experts. The α-weighted valuation method was used for de-fuzzification, and the exact conditional probability table parameters were obtained. Through fuzzy Bayesian inference, the key risk factors can be identified, the sensitivity value of key factors can be calculated, and the maximum risk chain can be found in the case of known evidence. Finally, the method was applied to the deductive analysis of three scenarios. The results show that the model can provide realistic analysis ideas for fire safety evaluation and emergency management of underground engineering. The proposed EPB risk assessment model provides a new perspective for the analysis of UEF accidents and contributes to the ongoing development of UEF research.