ANAlexandros N. Nordas

Alexandros N. Nordas

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Alexandros N. Nordas has a total of 10 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Full shell surface coupling along a line with non-conforming meshes

    by Alexandros N. Nordas, Bassam A. Izzuddin, Muzi Li

    In intricate, large-scale metal structures, the modelling efficiency and flexibility are substantially limited by the requirements of finite element size, shape, edge orientation compliance and nodal alignment throughout the domain. Such limitations often necessitate the use of complex transitional meshes in intersection regions of plated components, thereby resulting in complex global mesh configurations and significantly increased computational demands. Within this backdrop, this paper presents an original and systematic methodology for translational and rotational coupling of thin plate and shell surfaces along an arbitrary 1D interface, which provides a systematic framework for: (i) geometric modelling of weld lines; (ii) coupling of regions with different mesh densities or element types within a system; and (iii) domain partitioning problems with computationally heterogeneous partitions. The methodology is based upon novel coupling element formulations, which employ principles of the mortar method for interface discretisation and an augmented Lagrangian Multiplier approach for constraint enforcement, and have been implemented for application with co-rotational Reissner–Mindlin shell elements. A series of numerical examples demonstrates the accuracy, versatility, and substantial computational and practical benefits of the developed framework for surface coupling along a line in large-scale metal structures.


  • Open Access

    Effect of squeezing on construction and structural safety of the Swiss high-level radioactive waste repository drifts

    by Alexandros N. Nordas, Matteo Natale, Linard Cantieni, Georgios Anagnostou, Kovári K.


  • Open Access

    Creep Versus Consolidation in Tunnelling through Squeezing Ground—Part B: Transferability of Experience

    by Alexandros N. Nordas, Thomas Leone, Georgios Anagnostou

    This paper investigates potential differences between creep and consolidation in mechanised tunnelling through squeezing ground, placing focus on the practical question of using experiences gained from existing tunnels about the required thrust force as a reference for tunnels of different diameter or adjacent tunnels. The investigations focus on two aspects. First, the effect of the tunnel diameter on the risk of shield jamming is examined. The paper demonstrates that larger-diameter tunnels are more favourable in poor-quality ground, while the opposite holds in better-quality ground, as well as in the case of pronouncedly time-dependent ground behaviour due to consolidation or creep. Second, the effect of a tunnel on the required thrust force in a neighbouring tunnel built later is examined. The paper shows that this interaction effect is particularly important in water-bearing ground of low permeability, where the drainage action of the first tunnel induces pore pressure relief and ground consolidation in an extensive area, leading to a remarkable reduction of the thrust force in the second tunnel. Conversely, in the case of creep the interaction is negligible even under extremely squeezing conditions, due to the fundamentally different nature of the purely mechanical rheological processes from coupled hydromechanical processes. The presented investigations into the transferability of experiences are valuable for tunnelling practice, in cases of twin tunnels as well as in situations where a smaller-diameter tunnel is constructed prior to the main tunnel (e.g. a pilot tunnel for exploration, advance drainage or ground improvement), or also the opposite (e.g. upgrade of a road tunnel by later construction of a safety tunnel with a smaller diameter).


  • Open Access

    Creep Versus Consolidation in Tunnelling Through Squeezing Ground—Part A: Basic Time Effects

    by Thomas Leone, Alexandros N. Nordas, Georgios Anagnostou

    Although squeezing ground may undergo rapid convergences following tunnel excavation, its behaviour is often markedly time dependent due to creep or consolidation. The effects of creep and consolidation on shield tunnelling are comparatively evaluated in two companion papers, with the aim of demonstrating their qualitative similarities and distinctive features. The present, first paper investigates the basic time effects, placing focus on the time development of ground deformations and the complex interaction between ground, tunnel boring machine (TBM) and tunnel support during excavation and during construction standstills. The presented numerical simulations indicate several qualitative similarities between the two mechanisms of time dependency, in respect of the time development of ground deformations, the counter-intuitive behaviour of increasing shield loading with increasing rate of advance under certain conditions, as well as the thoroughly adverse effect of the additional time-dependent deformations taking place during construction standstills on the shield loading. However, they also underscore two prominent differences resulting from the fundamentally different nature of creep (a purely mechanical rheological process) and consolidation (a coupled hydromechanical process): first, the consistently more extensive plastic yielding in consolidating ground, which is partially associated with the seepage forces exerted by the pore water on the solid rock constituents. Second, the role of seepage forces as a potential destabilising agent, particularly for the tunnel face, which does not happen in the case of creep and may be critical for shield and cutterhead jamming. Building upon these investigations, the companion paper compares creep and consolidation with respect to the transferability of experiences about the required thrust force to tunnels of different diameter or to adjacent tunnels.


  • Open Access

    Effects of Creep on Shield Tunnelling Through Squeezing Ground

    by Thomas Leone, Alexandros N. Nordas, Georgios Anagnostou

    The present work aims to improve the reliability of shield jamming and lining damage risk assessment in squeezing ground by analysing the effects of creep on the evolution of rock pressure over time. The study is based on numerical simulations of typical mechanised tunnelling processes, generally consisting of shield advance phases alternating with shorter or longer standstills for lining installation, maintenance, etc. A linear elastic—viscous plastic constitutive model based upon Perzyna’s overstress theory is employed, which considers the time-dependency of plastic deformations via a single viscosity parameter. The investigations demonstrate the following: (i) shield loading during advance increases with increasing viscosity under certain conditions, which contradicts the common perception in many existing works that creep is thoroughly favourable for shield jamming; (ii) creep is thoroughly unfavourable for shield loading during long standstills and long-term lining loading, due to the additional viscoplastic ground deformations manifested over time; (iii) the commonly adopted simplifying assumption of continuous excavation with the gross advance rate is adequate only where standstills are very short (e.g., for lining erection during the stop-and-go shield tunnelling process), but otherwise underestimates the shield loading, even in cases of regular inspection and maintenance standstills lasting only a few hours. Two application examples, the Fréjus safety gallery and the Gotthard Base tunnel, demonstrate the need to consider creep and the accuracy of modelling tunnel construction by a semi-discrete approach, where only the very short standstills for lining erection are considered via an average advance rate, but longer standstills are explicitly simulated.


  • Open Access

    An estimation equation for the TBM thrust force in creeping rock

    by Thomas Leone, Alexandros N. Nordas, Georgios Anagnostou


  • Open Access

    Large strain correction for tunnel analyses considering hydromechanical coupling and ground anisotropy

    by Matteo Natale, Alexandros N. Nordas, Seraina Kopp, Georgios Anagnostou

    The deformations resulting from tunnel analyses for heavily squeezing ground may be very large, necessitating numerical formulations that consider geometric nonlinearity. Alternatively, for a certain class of problems, routine small strain analyses can be performed, and their results can be corrected to account for large strains by means of a simple hyperbolic expression proposed a few years ago. The present paper shows that this correction equation is sufficiently accurate for practical purposes even in the case of anisotropic material behaviour and for hydromechanically coupled, steady state or transient analyses of tunnels. The accuracy of the equation prediction varies amongst these cases but is satisfactory overall for the purpose of preliminary calculations, thus broadening its value and usefulness as a preliminary design tool.