OAOleh Anisimov

Oleh Anisimov

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Oleh Anisimov has a total of 13 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Ongoing Grade Control in Open Pits Using Advanced Digital Technologies

    by Oleh Anisimov, Nataliia Bariatska, Nina Safronova, Oleksii Cherniaiev

    In the context of varying ore quality indicators at mining open-pit mines, ongoing grade control is very important and affects the economic performance of the mining enterprise. The article analyses modern methods and ways of current grade control. A method for qualitative indicators assessment in an open pit mine and data processing using modern software is presented. An algorithm for grade control in the process of drilling and mining is analysed and presented. The main data is the geological database, which is updated during operational exploration and planning. Updates are carried out during the blast hole sampling and preparation of the massif for blasting. The dense network of blast holes allows to clarify the contours of high-grade and low-grade ores, which allows to control the order of ore material mining and form cargo flows in the open pit. As shown by the comparison of the parameters of waste rock, high-grade and low-grade ores in the mining block using the resource and operating models, the tonnage and quality of materials can be increased or decreased due to clarification. The article presents the grade control workflow in open pit mining as a generalised algorithm using advanced Micromine software.

  • IMPROVEMENT OF TECHNOLOGICAL SCHEMES FOR THE SHIPMENT OF MINERAL RAW MATERIALS AT CRUSHED STONE QUARRIES

    by Oleh Anisimov, Oleksii Cherniaiev, Pavlo Saik, Vasyl Lozynskyi

    Purpose. To substantiate and improve the technological schemes for the shipment of non-metallic mineral raw materials from processing complexes, take the example of the Odarivske granite deposit development. To determine the optimal location of the conveyor transport complex, the minimum transportation of finished products by a front loader must be considered. Methods. The study analyzed existing technological schemes for developing non-metallic deposits and the shipment of finished products. To assess the optimal placement of a mobile conveyor reloader, a graph-analytical method was used, which allowed us to determine the average productivity of a front loader. Research results. An improved technological scheme for the shipment of finished products from warehouses in the manufacture of non-metallic mineral raw materials has been proposed. The optimal parameters of operations for the shipment of crushed stone of various fractions using a front loader-mobile reloading device complex were determined. Scientific novelty. The formed technological complex and the placement of the mobile reloading device made it possible to establish the formula for the optimal distance of transportation of finished products, taking into account the rotation of the reloading mobile device, which directly affects the performance of the front loader when loading finished products at a crushed stone quarry. Practical significance. The existing technological schemes for the shipment of finished products are described, and the technological scheme for the shipment of non-metallic mineral raw materials in the conditions of development of the Odarivske granite deposit is improved, which made it possible to establish the production indicators of the front loader and the distance of transportation of finished products from the warehouse to the mobile reloading complex. Key words: non-metallic mineral raw materials, crushed stone, finished product shipment schemes, front-end loader, mobile reloading device

  • Open Access

    Substantiation of the Direction for Mining Operations That Develop under Conditions of Shear Processes Caused by Hydrostatic Pressure

    by Pavlo Saik, Oleksii Cherniaiev, Oleh Anisimov, Kanay Rysbekov

    This research is aimed to substantiate the optimally safe direction for mining operations developing in the conditions of shear processes under hydrostatic pressure influence when mining the Zavalivskyi Graphite Deposit. Using a graphical–analytical method, the slope stability index of the Pivdenno–Skhidnyi open-pit walls in the Zavalivskyi deposit and the safe distance for placing mining equipment have been determined. This method involves constructing a calculation scheme for each studied open-pit wall area based on the determined parameters by algebraically adding forces along a curvilinear shear surface, taking into account hydrostatic pressure within a possible collapse prism. During the research, factors have been identified that influence the optimal direction for stripping and mining operations developing under conditions of shear processes caused by flooding of lower horizons at the Zavalivskyi Graphite Plant. It has been revealed that the determining factor when choosing the direction for the development of mining operations is the safety factor of the open-pit working wall, ranging from 0.9 to 2.71 in the studied areas. Moreover, according to current normative documents, this indicator should not be less than 1.3. It has been determined that a promising direction for the development of mining operations in the Pivdenno–Skhidnyi open-pit mine is its south-western, western, and north-eastern areas, with a length of 556 m and a safe size for placing mining equipment of 27.12–32.54 m. Recommendations and measures for conducting mining operations have been developed to ensure the stable condition of the open-pit walls.


  • Open Access

    Determining the Safe Distance for Mining Equipment Operation When Forming an Internal Dump in a Deep Open Pit

    by Oleg Bazaluk, Oleh Anisimov, Pavlo Saik, Vasyl Lozynskyi, Oleksandr Akimov, Leonid Hrytsenko

    In the surface mining of mineral deposits, land resources suitable for agricultural purposes are inappropriately spent in large volumes. When mining deep open pits, overburden rocks are mainly transported to the surface. The optimal solution for reducing the area of disturbed lands is the placement of overburden rocks in internal dumps in the open pit. This is especially suitable when mining a mineral deposit with several open pits where at least one of them is depleted. Therefore, it is important to assess the feasibility of building an internal dump, based on the stability parameters of its slopes and the safe distance for placing mining equipment within its boundaries, which was the focus of this research. Numerical modeling with Slide 5.0 software was used to determine the stability of the dump slope inside the open pit and the safe distance from the upper slope edge for placing mining equipment. This reflected the geomechanical situation occurring within the boundaries of the dump formed in the open-pit field with a high degree of reliability. It was determined that the maximum standard safety factor values of the open-pit slopes are within the limits when the overburden rocks border on the hard bedrock (Ks.s.f ≥ 1.2). Under the condition where the dump slope bordered on sedimentations represented by clays, loams, and sands with a strength of 2–3 on the Mohs scale, the safety factor decreased by 22%. It was determined that the minimum safe distance from the outer contour of the dragline base to the upper edge of a single-tier dump was 15.5 m with a safety factor of 1.21. The maximum safe distance values in the range of 73.5–93 m were concentrated within the boundaries of sections 5–9, with a safety factor from 1.18 to 1.28. When the dragline was located within the boundaries of section 7, the dump construction works should be conducted only if the dump exist for up to 3 years. Based on the identified parameters, on the example of using the ESH-11/70 walking dragline, a technological scheme of its operation was developed with the allocation of safe boundaries for its placement when forming an internal dump. The results obtained are useful for the development of projects for the reclamation of depleted open pits.


  • COMPARISON OF DRILLING AND CHARGING SCHEMES FOR BLAST HOLES USING THE MODERN MICROMINE SOFTWARE PRODUCT

    by Dnipro University of Technology, Oleh Anisimov, Oleksii Cherniaiev, Ivan Hurov

    Purpose. The effective schemes of rock preparation using drilling and blasting operations in the conditions of Ingulets GOK with help of the Micromine software package were substantiated. The indicators of lineal drilling and charging volumes when using different schemes of placement of holes on the block were obtained. Methods. During the research, a digital model of the Ingulets open pit was created, and a site for research on the creation of holes was selected. A method of analyzing statistical data after calculating the volume of drilling and charging holes with explosives was used. Research results. Using of the Micromine software product allows to take into account the unevenness of the surface on the horizon and the formation of a flat horizon of the next bench through the use of a digital surface of the open pit. With the help of the software package, the optimal parameters of drilling and blasting operations and statistical data on the block of hole charges determined for the study were obtained. Scientific novelty. The use of the Micromine software package and the obtained indicators enabled to establishment of statistical data on the placement of holes in a staggered and rectangular drilling scheme. It allows to determine the most appropriate scheme, taking into account the drilling meterage and explosive volumes when preparing the block for extraction. Practical significance. The established technological schemes for the placement of drill holes on a drilling and blasting block in the conditions of Ingulets GOK allow for reduced drilling costs and planning drilling and blasting operations. It is proposed to set the amount of explosives taking into account the drilling schemes at the relevant horizons using the Micromine software product, which allows to set of average indicators and calculations in a modern geoinformation software product.

  • DEVELOPMENT OF UPPER OVERBURDEN BENCHES OF THE PIT USING LOADERS AND EXCAVATORS

    by Oleh Anisimov, Dnipro University of Technology, Oleksii Cherniaiev, Leonid Hrytsenko

    Purpose. Investigate and compare technological schemes with the use of extraction and loading equipment and the organization of work during the development of the front of mining operations. Consider the parameters of benches when extracting soft overburdened rocks. Obtain indicators of time to accelerate the working out of rocks in the upper overburden horizons. Methods. Analytical and grapho-analytical methods were used to determine the time for carrying out operations during extraction and loading operations. When determining the expediency of using the extraction and loading equipment, the analysis method was applied, and the results were compared. Research results. It was established that the use of a loader in the face compared to excavators has its advantages related to maneuverability, absence of dependence on power grids, and execution of auxiliary operations without the involvement of additional mining machines. Technological schemes for the use of loaders and excavators during loading into railway transport were considered. Calculations were made, and the deadlines for loading overburden at the extraction site were graphically displayed. Scientific novelty. The obtained indicators make it possible to determine the terms at which effective execution of work will be achieved in a short time for loaders and excavators with a mechanical shovel. It will make it possible to significantly improve the current planning of mining operations when working out the upper horizons of deep pits. Practical significance. In pits of many countries engaged in the extraction of minerals when extracting rock and soft rocks, in addition to excavators, front loaders with different bucket capacities are increasingly used. The article proves that in the upper horizons of many deep pits, the loading of soft rocks can be carried out more efficiently when loaders are used as the main production unit. Key words: pit, loader, excavator, soft rocks, duration of mining operations, railway transport.