Oleksandr Makhynia
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Oleksandr Makhynia has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Yevhenii Halenko
Київський національний університет будівництва і архітектури
3 shared publications - Nazar Yaremko2 shared publications
- Hennadii Tonkacheiev
Kyiv National University of Construction and Architecture
1 shared publication - Iryna Dubovyk
Kyiv National University of Construction and Architecture
1 shared publication - Iryna Hlushchenko1 shared publication
- Vladimir Basarab
Київський національний університет будівництва і архітектури, м. Київ
1 shared publication
Latest Publications
- Open Access
- 30 May 2026
- Published by Kyiv National University of Construction and Architecture in Bases and Foundations
- No. 52
Investigation of the Ultimate Excavation Depth for Pits Supported by a “Diaphragm Wall”
A diaphragm wall is one of the most widely used types of retaining structures for vertical excavation support in dense urban environments, where deformation control and the stability of the soil mass are of critical importance. Despite the extensive application of diaphragm wall technology, the problem of selecting an optimal wall thickness—considering excavation depth, temporary support configuration during construction, and site-specific geotechnical conditions—remains highly relevant for both designers and researchers. The aim of this study is to determine the relationship between diaphragm wall thickness and the maximum achievable excavation depth, as well as to assess the influence of different support schemes (cantilever and temporarily braced) on the stress–strain behavior of the structure. The investigation considers wall thicknesses ranging from 300 mm to 1000 mm, which correspond to typical parameters for medium- and large‑depth urban excavations. Numerical modeling was performed using the finite element method, accounting for nonlinear soil behavior, staged construction, and soil–structure interaction. The analysis shows that increasing the diaphragm wall thickness has a limited effect on reducing bending moments, particularly in the cantilever configuration. In contrast, the use of a temporary strut significantly alters the deformation pattern and enables an increase in excavation depth at each construction stage. For the examined range of wall thicknesses, the maximum depth of a single excavation stage is approximately 1.0 m for the cantilever scheme, whereas the introduction of a temporary strut allows this value to increase to as much as 2.4 m, depending on wall thickness and the stiffness of the bracing element. Thus, the key factor governing the achievable excavation depth is not the wall thickness itself, but rather the structural support scheme employed during construction.The obtained results have practical significance for optimizing excavation technologies in complex urban environments. Increasing the excavation depth at a single stage reduces the number of construction cycles, shortens the overall construction duration, and lowers the risks associated with deformations of retaining structures and adjacent buildings. The findings demonstrate that a rational combination of diaphragm wall thickness and temporary bracing elements can enhance the efficiency and safety of the construction process without substantially increasing the material consumption of the retaining structure.
- 30 May 2026
- Published by Kyiv National University of Construction and Architecture in Bases and Foundations
- No. 52
Open AccessInvestigation of the Ultimate Excavation Depth for Pits Supported by a “Diaphragm Wall”
A diaphragm wall is one of the most widely used types of retaining structures for vertical excavation support in dense urban environments, where deformation control and the stability of the soil mass are of critical importance. Despite the extensive application of diaphragm wall technology, the problem of selecting an optimal wall thickness—considering excavation depth, temporary support configuration during construction, and site-specific geotechnical conditions—remains highly relevant for both designers and researchers. The aim of this study is to determine the relationship between diaphragm wall thickness and the maximum achievable excavation depth, as well as to assess the influence of different support schemes (cantilever and temporarily braced) on the stress–strain behavior of the structure. The investigation considers wall thicknesses ranging from 300 mm to 1000 mm, which correspond to typical parameters for medium- and large‑depth urban excavations. Numerical modeling was performed using the finite element method, accounting for nonlinear soil behavior, staged construction, and soil–structure interaction. The analysis shows that increasing the diaphragm wall thickness has a limited effect on reducing bending moments, particularly in the cantilever configuration. In contrast, the use of a temporary strut significantly alters the deformation pattern and enables an increase in excavation depth at each construction stage. For the examined range of wall thicknesses, the maximum depth of a single excavation stage is approximately 1.0 m for the cantilever scheme, whereas the introduction of a temporary strut allows this value to increase to as much as 2.4 m, depending on wall thickness and the stiffness of the bracing element. Thus, the key factor governing the achievable excavation depth is not the wall thickness itself, but rather the structural support scheme employed during construction.The obtained results have practical significance for optimizing excavation technologies in complex urban environments. Increasing the excavation depth at a single stage reduces the number of construction cycles, shortens the overall construction duration, and lowers the risks associated with deformations of retaining structures and adjacent buildings. The findings demonstrate that a rational combination of diaphragm wall thickness and temporary bracing elements can enhance the efficiency and safety of the construction process without substantially increasing the material consumption of the retaining structure.
- Open Access
- 25 November 2025
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 1 (56)
Optimization of the technology for forming monolithic vertical elements using moving belt formwork systems
This article develops a comprehensive methodological framework for the structural and operational optimization of technologies used to form monolithic vertical building elements through the application of vertically movable belt-type formwork systems. The proposed approach is based on a detailed decomposition of the construction process into nine standardized microelement matrices that represent the full operational cycle: installation of guide frames, placement of reinforcement, suspension of modular units, multilayer concrete placing, regulated curing, vertical lifting of modules, adjustment operations, and subsequent dismantling procedures. Such decomposition makes it possible to quantify labor intensity, assess the technological sequence, and determine the dominant factors influencing productivity. A key feature of the investigated system is the flexible forming strip, tensioned on drive and bypass rollers, which ensures tangential detachment from the concrete surface during lifting. This mechanism substantially decreases adhesion forces, reduces mechanical resistance, and minimizes risk to the integrity of the freshly formed concrete layer. Compared with conventional panel formwork, belt-type systems demonstrate significantly lower energy demands, reduced labor consumption, and improved turnover rates. The study presents analytical dependencies for evaluating cycle duration, conformity coefficients, turnover ratios, and required operational resources. The research substantiates the advantages of using mechanized group configurations of belt modules, which enable synchronized lifting, stable geometric accuracy, and continuity of concreting cycles within accelerated construction schedules. Moreover, the methodological framework provides a foundation for digital integration, supporting the application of BIM-based planning tools, SCADA monitoring solutions, and predictive analytics for process optimization. The results confirm that vertically movable belt formwork systems represent a technologically and economically efficient alternative to traditional formwork approaches. Their implementation leads to measurable improvements in labor productivity, material utilization, cycle stability, and the quality of concrete surfaces. The proposed methodology also creates opportunities for future development of digital twins, automated control algorithms, and advanced rationalization models for modern monolithic construction..
- 25 November 2025
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 1 (56)
Open AccessOptimization of the technology for forming monolithic vertical elements using moving belt formwork systems
This article develops a comprehensive methodological framework for the structural and operational optimization of technologies used to form monolithic vertical building elements through the application of vertically movable belt-type formwork systems. The proposed approach is based on a detailed decomposition of the construction process into nine standardized microelement matrices that represent the full operational cycle: installation of guide frames, placement of reinforcement, suspension of modular units, multilayer concrete placing, regulated curing, vertical lifting of modules, adjustment operations, and subsequent dismantling procedures. Such decomposition makes it possible to quantify labor intensity, assess the technological sequence, and determine the dominant factors influencing productivity. A key feature of the investigated system is the flexible forming strip, tensioned on drive and bypass rollers, which ensures tangential detachment from the concrete surface during lifting. This mechanism substantially decreases adhesion forces, reduces mechanical resistance, and minimizes risk to the integrity of the freshly formed concrete layer. Compared with conventional panel formwork, belt-type systems demonstrate significantly lower energy demands, reduced labor consumption, and improved turnover rates. The study presents analytical dependencies for evaluating cycle duration, conformity coefficients, turnover ratios, and required operational resources. The research substantiates the advantages of using mechanized group configurations of belt modules, which enable synchronized lifting, stable geometric accuracy, and continuity of concreting cycles within accelerated construction schedules. Moreover, the methodological framework provides a foundation for digital integration, supporting the application of BIM-based planning tools, SCADA monitoring solutions, and predictive analytics for process optimization. The results confirm that vertically movable belt formwork systems represent a technologically and economically efficient alternative to traditional formwork approaches. Their implementation leads to measurable improvements in labor productivity, material utilization, cycle stability, and the quality of concrete surfaces. The proposed methodology also creates opportunities for future development of digital twins, automated control algorithms, and advanced rationalization models for modern monolithic construction..
- Open Access
- 27 June 2025
- Published by Kyiv National University of Construction and Architecture in Current problems of architecture and urban planning
- No. 73,p. 507-519
Modeling of the process of manufacturing underground wall structures by the gravity extrusion method
The article highlights the results of modeling the technological process of constructing underground wall structures using the gravity extrusion method. The gravity extrusion technology involves the construction of underground reinforced concrete wall structures in a pre-excavated trench. The wall structure itself is constructed in a formwork module at ground level. During the construction process, under the pressure of the layers of concrete mix laid during continuous concreting, the wall structure is gradually extruded from the module mold into a pre-dug trench filled with clay mortar, while its lowering is controlled by lowering mechanisms. After reaching the design elevation, the wall structure is fixed in the design position. During the research, a model of the wall structure construction process using the gravity extrusion method was developed, covering the technological process from the beginning of the installation of the formwork module over the pre-dug trench to the dismantling of the module after the erection of the wall structure. Analytical modeling of the duration of the construction cycle of a separate section of the wall structure, the duration of continuous concreting of the monolithic part of the structure, determination of the required concreting intensity, and consideration of the necessary restrictions during the execution of works were also performed. The results of the analytical study make it possible to investigate the area of rational application, design and technological parameters of the construction of wall structures using the gravity extrusion method. The results obtained can also be used in the design of structures, technological solutions, and equipment for the gravity extrusion technology of reinforced concrete structures of underground structures.
- 27 June 2025
- Published by Kyiv National University of Construction and Architecture in Current problems of architecture and urban planning
- No. 73,p. 507-519
Open AccessModeling of the process of manufacturing underground wall structures by the gravity extrusion method
The article highlights the results of modeling the technological process of constructing underground wall structures using the gravity extrusion method. The gravity extrusion technology involves the construction of underground reinforced concrete wall structures in a pre-excavated trench. The wall structure itself is constructed in a formwork module at ground level. During the construction process, under the pressure of the layers of concrete mix laid during continuous concreting, the wall structure is gradually extruded from the module mold into a pre-dug trench filled with clay mortar, while its lowering is controlled by lowering mechanisms. After reaching the design elevation, the wall structure is fixed in the design position. During the research, a model of the wall structure construction process using the gravity extrusion method was developed, covering the technological process from the beginning of the installation of the formwork module over the pre-dug trench to the dismantling of the module after the erection of the wall structure. Analytical modeling of the duration of the construction cycle of a separate section of the wall structure, the duration of continuous concreting of the monolithic part of the structure, determination of the required concreting intensity, and consideration of the necessary restrictions during the execution of works were also performed. The results of the analytical study make it possible to investigate the area of rational application, design and technological parameters of the construction of wall structures using the gravity extrusion method. The results obtained can also be used in the design of structures, technological solutions, and equipment for the gravity extrusion technology of reinforced concrete structures of underground structures.
- Open Access
- 27 March 2025
- Published by Publishing House Helvetica (Publications) in Таврійський науковий вісник. Серія: Технічні науки
- No. 1,p. 540-550
ДОСЛІДЖЕННЯ ФАКТОРІВ ВПЛИВУ НА ТЕХНОЛОГІЮ ЗВЕДЕННЯ ПІДЗЕМНИХ КОНСТРУКЦІЙ МЕТОДОМ ГРАВІТАЦІЙНОГО ВИДАВЛЮВАННЯ
У статті презентовано результати дослідження технології гравітаційного видавлювання армобетонних конструкцій, орієнтованої на зведення підземних залізобетонних конструкцій у складних гідрогеологічних умовах. Запропонована технологія синтезує переваги методів «стіна в ґрунті» та «ковзної опалубки», що дозволить покращити якість монолітних конструкцій у порівнянні із методом «стіна в ґрунті» та підвищити їхні гідроізоляційні властивості. Це вказує на широкі перспективи застосування даної технології для зведення шлюзів, насосних станцій, берегозахисних стін і фундаментів у зонах ризику підтоплення.В процесі дослідження були проаналізовані групи факторів, що впливають на технологію гравітаційного видавлювання армобетонних конструкцій, а саме: фактори конструктивних рішень конструкцій, фактори зовнішнього середовища, фактори конструктивних рішень опалубної системи, фактори фізико-механічних властивостей бетонної суміші, технологічні, організаційні, економічні й організаційні фактори та фактори аварійних ситуацій. Була виконана попередня оцінка 54 факторів впливу методом ранжування. Ранжування факторів було здійснено по десятковим безрозмірним шкалам «Важливість» і «Бажаність». При цьому шкала «Важливість» передбачала оцінку фактору за ступенем його критичності, тобто, наскільки його значення впливає на можливість функціонування технології зведення конструкцій методом гравітаційного видавлювання.Шкала «Бажаність» передбачала оцінку фактору за ступенем його необхідності, тобто, наскільки його значення впливає на ефективність і доцільність технології зведення конструкцій методом гравітаційного видавлювання. Було виявлено 16 основних факторів, що впливають на технологію зведення підземних армобетонних конструкцій методом гравітаційного видавлювання. В подальшому на основі аналізу науково-технічних джерел щодо досвіду застосування методу «стіна в ґрунті» та методу зведення конструкцій у ковзній опалубці були виявлені інтервали змін 16 основних факторів впливу на технологію гравітаційного видавлювання. Отримані результати можуть бути використані при подальшому досліджені і удосконалені технології виготовлення підземних армобетонних конструкцій методом гравітаційного видавлювання.
- 27 March 2025
- Published by Publishing House Helvetica (Publications) in Таврійський науковий вісник. Серія: Технічні науки
- No. 1,p. 540-550
Open AccessДОСЛІДЖЕННЯ ФАКТОРІВ ВПЛИВУ НА ТЕХНОЛОГІЮ ЗВЕДЕННЯ ПІДЗЕМНИХ КОНСТРУКЦІЙ МЕТОДОМ ГРАВІТАЦІЙНОГО ВИДАВЛЮВАННЯ
У статті презентовано результати дослідження технології гравітаційного видавлювання армобетонних конструкцій, орієнтованої на зведення підземних залізобетонних конструкцій у складних гідрогеологічних умовах. Запропонована технологія синтезує переваги методів «стіна в ґрунті» та «ковзної опалубки», що дозволить покращити якість монолітних конструкцій у порівнянні із методом «стіна в ґрунті» та підвищити їхні гідроізоляційні властивості. Це вказує на широкі перспективи застосування даної технології для зведення шлюзів, насосних станцій, берегозахисних стін і фундаментів у зонах ризику підтоплення.В процесі дослідження були проаналізовані групи факторів, що впливають на технологію гравітаційного видавлювання армобетонних конструкцій, а саме: фактори конструктивних рішень конструкцій, фактори зовнішнього середовища, фактори конструктивних рішень опалубної системи, фактори фізико-механічних властивостей бетонної суміші, технологічні, організаційні, економічні й організаційні фактори та фактори аварійних ситуацій. Була виконана попередня оцінка 54 факторів впливу методом ранжування. Ранжування факторів було здійснено по десятковим безрозмірним шкалам «Важливість» і «Бажаність». При цьому шкала «Важливість» передбачала оцінку фактору за ступенем його критичності, тобто, наскільки його значення впливає на можливість функціонування технології зведення конструкцій методом гравітаційного видавлювання.Шкала «Бажаність» передбачала оцінку фактору за ступенем його необхідності, тобто, наскільки його значення впливає на ефективність і доцільність технології зведення конструкцій методом гравітаційного видавлювання. Було виявлено 16 основних факторів, що впливають на технологію зведення підземних армобетонних конструкцій методом гравітаційного видавлювання. В подальшому на основі аналізу науково-технічних джерел щодо досвіду застосування методу «стіна в ґрунті» та методу зведення конструкцій у ковзній опалубці були виявлені інтервали змін 16 основних факторів впливу на технологію гравітаційного видавлювання. Отримані результати можуть бути використані при подальшому досліджені і удосконалені технології виготовлення підземних армобетонних конструкцій методом гравітаційного видавлювання.
- Open Access
- 29 November 2024
- Published by Kyiv National University of Construction and Architecture in Bases and Foundations
- No. 49,p. 77-85
Theoretical studies of the installation weight of reinforced concrete structures
Summary. The article is devoted to the study of changes in the installation weight of reinforced concrete extrusion structure depending on structural, technological and other factors. The technology of reinforced concrete extrusion structures is an innovative and important step in increasing the efficiency and speed of construction of underground structures. The essence of the technology is that a monolithic structure is made on the ground surface in a modular form, and then, under its own weight, it is lowered into the excavated trench to the design depth, where it is fixed for further work. Therefore, one of the key parameters that determines the safety and reliability of the process is the installation weight of the structure. The article describes in detail the components that form the installation weight of a structure and analyzes the influence of design, technical and other factors on its value. The paper theoretically investigates the permissible maximum and minimum variants of the assembly weight with changes in geometric parameters: length (from 6 to 18 m), width (from 0.4 to 0.8 m) and height (from 10 to 50 m). The results show that changing these parameters significantly affects the weight of the structure both in general and during installation. The effect of the density of the clay slurry used to stabilize the trench walls and prevent their collapse was also investigated. It was found that increasing the density of the suspension reduces the installation weight due to the buoyancy effect. For example, at a density of 1.5 t/m³, the installation weight is reduced by up to 37%, and at a minimum density of 1.03 t/m³ - by up to 25%. The obtained results open up prospects for further research aimed at optimizing design solutions and improving the technology of reinforced concrete structures. In particular, it is important to develop methods to reduce the installation weight by using lighter materials and optimized structural shapes without losing the required strength.
- 29 November 2024
- Published by Kyiv National University of Construction and Architecture in Bases and Foundations
- No. 49,p. 77-85
Open AccessTheoretical studies of the installation weight of reinforced concrete structures
Summary. The article is devoted to the study of changes in the installation weight of reinforced concrete extrusion structure depending on structural, technological and other factors. The technology of reinforced concrete extrusion structures is an innovative and important step in increasing the efficiency and speed of construction of underground structures. The essence of the technology is that a monolithic structure is made on the ground surface in a modular form, and then, under its own weight, it is lowered into the excavated trench to the design depth, where it is fixed for further work. Therefore, one of the key parameters that determines the safety and reliability of the process is the installation weight of the structure. The article describes in detail the components that form the installation weight of a structure and analyzes the influence of design, technical and other factors on its value. The paper theoretically investigates the permissible maximum and minimum variants of the assembly weight with changes in geometric parameters: length (from 6 to 18 m), width (from 0.4 to 0.8 m) and height (from 10 to 50 m). The results show that changing these parameters significantly affects the weight of the structure both in general and during installation. The effect of the density of the clay slurry used to stabilize the trench walls and prevent their collapse was also investigated. It was found that increasing the density of the suspension reduces the installation weight due to the buoyancy effect. For example, at a density of 1.5 t/m³, the installation weight is reduced by up to 37%, and at a minimum density of 1.03 t/m³ - by up to 25%. The obtained results open up prospects for further research aimed at optimizing design solutions and improving the technology of reinforced concrete structures. In particular, it is important to develop methods to reduce the installation weight by using lighter materials and optimized structural shapes without losing the required strength.
- Open Access
- 24 November 2023
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 1 (52) , 157-170
Classification of sliding formwork systems
The article discusses modern sliding formwork systems, which are different from other types of formworks in that they can be moved during the construction of structures without the need for intermediate stages of formwork installation and removal. This, and the possibility of using a high level of process automation, allows to increase the rate of monolithic construction and significantly reduce the number of working seams, which in turn increases the structural reliability and reduces the complexity of formwork operations. The development of constructive solutions for sliding formwork systems has created a significant range of varieties of these systems, which allows expanding the range of applications for sliding formwork. Based on the analysis of existing sliding formwork systems, their classification is proposed according to the factors that influence the constructive solutions, namely: constructive solutions of forming elements, constructive solutions of the supporting part of the formwork system and the mechanism of movement of the formwork system in the process of constructing a monolithic structure. It is proposed to classify sliding formwork systems according to the following features of the structural solutions of the forming elements, namely: the size of the formwork panels; the shape of the surface of the forming elements; the location of the forming elements in relation to the structure being constructed; the geometry of the forming elements; the method of fixing the forming elements in relation to the surface of the structure being constructed; the material of the surface of the forming elements in contact with the freshly placed concrete mixture. According to the constructive solutions of the supporting part of the formwork system, it is proposed to consider the following features: the method of supporting the formwork part; the construction of jacking frames; the location of jacking rods. According to the mechanism of movement of the supporting part of the formwork system, it is proposed to distinguish the following features: elements that move in the process of raising a monolithic structure; direction of movement of the sliding formwork system; types of jacks used to move the formwork system; control system for moving the sliding formwork system. The presented classification takes into account technical parameters and functional properties, which contributes to a better understanding of the choice of the best type of formwork for specific construction tasks. The results of the study may be useful for engineers, architects and other construction industry professionals interested in improving the efficiency and quality of construction projects.
- 24 November 2023
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 1 (52) , 157-170
Open AccessClassification of sliding formwork systems
The article discusses modern sliding formwork systems, which are different from other types of formworks in that they can be moved during the construction of structures without the need for intermediate stages of formwork installation and removal. This, and the possibility of using a high level of process automation, allows to increase the rate of monolithic construction and significantly reduce the number of working seams, which in turn increases the structural reliability and reduces the complexity of formwork operations. The development of constructive solutions for sliding formwork systems has created a significant range of varieties of these systems, which allows expanding the range of applications for sliding formwork. Based on the analysis of existing sliding formwork systems, their classification is proposed according to the factors that influence the constructive solutions, namely: constructive solutions of forming elements, constructive solutions of the supporting part of the formwork system and the mechanism of movement of the formwork system in the process of constructing a monolithic structure. It is proposed to classify sliding formwork systems according to the following features of the structural solutions of the forming elements, namely: the size of the formwork panels; the shape of the surface of the forming elements; the location of the forming elements in relation to the structure being constructed; the geometry of the forming elements; the method of fixing the forming elements in relation to the surface of the structure being constructed; the material of the surface of the forming elements in contact with the freshly placed concrete mixture. According to the constructive solutions of the supporting part of the formwork system, it is proposed to consider the following features: the method of supporting the formwork part; the construction of jacking frames; the location of jacking rods. According to the mechanism of movement of the supporting part of the formwork system, it is proposed to distinguish the following features: elements that move in the process of raising a monolithic structure; direction of movement of the sliding formwork system; types of jacks used to move the formwork system; control system for moving the sliding formwork system. The presented classification takes into account technical parameters and functional properties, which contributes to a better understanding of the choice of the best type of formwork for specific construction tasks. The results of the study may be useful for engineers, architects and other construction industry professionals interested in improving the efficiency and quality of construction projects.
- Open Access
- 2 June 2023
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 1 (51) , 259-270
The use of pile columns during the building construction by the top-down method
The article examines the analysis of publications regarding the use of various types of piles-columns during top-down construction. Today, the following types of piles can be used during construction using the "up-down" technology: bored piles, bored piles with a barrel extension (bell pile), barrettes (barrette), combined piles with a steel core (king post). The article analyzes the buildings that were built by the "up-down" method, as well as the structural characteristics of the piles-columns that were used during their construction. It was established that pile-columns are expected to absorb loads in a wide range from 1.5 to 44.5 MN, on average the calculated load is from 10 to 14 MN. The length of the piles varies from 16 to 67 m, on average - 30...35 m, and they were placed with steps from 1.8 to 4.3 m, on average - 3 m. A growing trend of using combined piles with a metal core (king post) was revealed. Their main advantage is the ability to immediately perceive significant loads from the above-ground part of the building during the simultaneous construction of its underground part and guaranteed indicators of strength and stability of the column. Installation of combined piles with a metal core (king post) involves two stages. At the first stage, a pit is arranged and a reinforcing frame is installed to it, then a concrete mixture is laid to the lower monolithic part of the pile, into which the steel core of the upper part is mounted and it is covered with gravel in the pit. At the second stage, during the construction of the underground floors, the metal core is concreted. At the same time, it was established that the installation and concreting of a metal body is a technologically complex and expensive process that requires a more detailed study of the possibility of improving structural and technological solutions and reducing the cost of work.
- 2 June 2023
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 1 (51) , 259-270
Open AccessThe use of pile columns during the building construction by the top-down method
The article examines the analysis of publications regarding the use of various types of piles-columns during top-down construction. Today, the following types of piles can be used during construction using the "up-down" technology: bored piles, bored piles with a barrel extension (bell pile), barrettes (barrette), combined piles with a steel core (king post). The article analyzes the buildings that were built by the "up-down" method, as well as the structural characteristics of the piles-columns that were used during their construction. It was established that pile-columns are expected to absorb loads in a wide range from 1.5 to 44.5 MN, on average the calculated load is from 10 to 14 MN. The length of the piles varies from 16 to 67 m, on average - 30...35 m, and they were placed with steps from 1.8 to 4.3 m, on average - 3 m. A growing trend of using combined piles with a metal core (king post) was revealed. Their main advantage is the ability to immediately perceive significant loads from the above-ground part of the building during the simultaneous construction of its underground part and guaranteed indicators of strength and stability of the column. Installation of combined piles with a metal core (king post) involves two stages. At the first stage, a pit is arranged and a reinforcing frame is installed to it, then a concrete mixture is laid to the lower monolithic part of the pile, into which the steel core of the upper part is mounted and it is covered with gravel in the pit. At the second stage, during the construction of the underground floors, the metal core is concreted. At the same time, it was established that the installation and concreting of a metal body is a technologically complex and expensive process that requires a more detailed study of the possibility of improving structural and technological solutions and reducing the cost of work.
- Open Access
- 14 April 2023
- Published by Kyiv National University of Construction and Architecture in Spatial development
- No. 3,p. 74-89
THE INFLUENCE OF PARAMETERS OF EARTHMOVING MACHINES ON THE DESIGN SOLUTIONS OF BARRETTE PILES
Розглянуто аналіз публікацій, щодо влаштування бареттних фундаментів. Який вказує на те, що несуча здатність баретти визначається в основному опором за її бічною поверхнею і чим більша площа поверхні, тим, можливо, більша несуча здатність баретти. В свою чергу застосування баретт із формою поперечного перерізу відмінною від прямокутного (квадратного) є досить актуальним. На сьогодні у будівництві можуть бути застосовані баретти прямокутної (квадратної) форми, Х-форми, Т-форми, L- форми, Н-форми, Y-форми і C-форми поперечного перерізу. Геометричні розміри баретти залежать від розмірів робочих органів землерийних машин для влаштування вузьких і глибоких траншей. Було проведене теоретичне дослідження параметрів найбільш поширених типів землерийних машин для влаштування траншей, а саме плаского грейфера і бурової фрези. Були проаналізовані технічні характеристики гідравлічних пласких грейферів: серії KHD (CASAGRANDE S.P.A.), серії GB (BAUER Maschinen GmbH), серії HSG (LIEBHERR Maschinen GmbH), серії GH (SOILMEC S.P.A.) та технічні характеристики гідравлічних бурових фрез: серії FD (CASAGRANDE S.P.A.), серії BC (BAUER Maschinen GmbH), серії LSC (LIEBHERR Maschinen GmbH), серії SH (SOILMEC S.P.A.). В результаті були визначені інтервали варіацій геометричних розмірів окремої захватки, що влаштовується за допомогою того чи іншого робочого органу. Це дозволило визначити можливі варіації геометричних розмірів баретт прямокутної (квадратної) форми, Х-форми, Т- форми, L-форми, Н-форми, Y-форми і C-форми поперечного перерізу. Згідно отриманих результатів, ширина окремого лінійного елементу баретти може варіюватись в межах від 420 до 1800 мм при застосуванні плаского грейферу і в межах від 640 до 2000 мм при застосуванні бурової фрези. Довжина окремого лінійного елементу барретти може коливатись від 2200 мм до 4200 мм при застосування плаского грейферу і від 2200 мм до 3200 мм при застосуванні бурової фрези. Отримані результати дозволять оптимізувати процес проектування бареттних фундаментів і уникнути додаткового уточнення їх розмірів на етапі влаштування.
- 14 April 2023
- Published by Kyiv National University of Construction and Architecture in Spatial development
- No. 3,p. 74-89
Open AccessTHE INFLUENCE OF PARAMETERS OF EARTHMOVING MACHINES ON THE DESIGN SOLUTIONS OF BARRETTE PILES
Розглянуто аналіз публікацій, щодо влаштування бареттних фундаментів. Який вказує на те, що несуча здатність баретти визначається в основному опором за її бічною поверхнею і чим більша площа поверхні, тим, можливо, більша несуча здатність баретти. В свою чергу застосування баретт із формою поперечного перерізу відмінною від прямокутного (квадратного) є досить актуальним. На сьогодні у будівництві можуть бути застосовані баретти прямокутної (квадратної) форми, Х-форми, Т-форми, L- форми, Н-форми, Y-форми і C-форми поперечного перерізу. Геометричні розміри баретти залежать від розмірів робочих органів землерийних машин для влаштування вузьких і глибоких траншей. Було проведене теоретичне дослідження параметрів найбільш поширених типів землерийних машин для влаштування траншей, а саме плаского грейфера і бурової фрези. Були проаналізовані технічні характеристики гідравлічних пласких грейферів: серії KHD (CASAGRANDE S.P.A.), серії GB (BAUER Maschinen GmbH), серії HSG (LIEBHERR Maschinen GmbH), серії GH (SOILMEC S.P.A.) та технічні характеристики гідравлічних бурових фрез: серії FD (CASAGRANDE S.P.A.), серії BC (BAUER Maschinen GmbH), серії LSC (LIEBHERR Maschinen GmbH), серії SH (SOILMEC S.P.A.). В результаті були визначені інтервали варіацій геометричних розмірів окремої захватки, що влаштовується за допомогою того чи іншого робочого органу. Це дозволило визначити можливі варіації геометричних розмірів баретт прямокутної (квадратної) форми, Х-форми, Т- форми, L-форми, Н-форми, Y-форми і C-форми поперечного перерізу. Згідно отриманих результатів, ширина окремого лінійного елементу баретти може варіюватись в межах від 420 до 1800 мм при застосуванні плаского грейферу і в межах від 640 до 2000 мм при застосуванні бурової фрези. Довжина окремого лінійного елементу барретти може коливатись від 2200 мм до 4200 мм при застосування плаского грейферу і від 2200 мм до 3200 мм при застосуванні бурової фрези. Отримані результати дозволять оптимізувати процес проектування бареттних фундаментів і уникнути додаткового уточнення їх розмірів на етапі влаштування.
- Open Access
- 26 December 2022
- Published by Kyiv National University of Construction and Architecture in Building constructions. Theory and Practice
- No. 11,p. 115-124
THE FUNDAMENTALS OF FORMING THE NUMERICAL COMPOSITION OF THE COMPLEX BRIGADE OF MASON-INSTALLERS
The design of the flow method of the construction of a multi-story residential building with stone walls and prefabricated reinforced concrete floor structures has its own features, namely, the presence of mechanized and non-mechanized (manual) processes, which implies a significant difference in the number of performers when coordinating flows among themselves. Taking into account the importance of ensuring the rhythmic execution of construction processes, the formation of the optimal numerical composition of the complex brigade is an urgent issue. As a result of the research, the complex process of building stone houses with prefabricated floors was divided into two streams: The first stream - assembly, transport and auxiliary processes: the first tier - delivery of pallets with bricks, delivery of boxes with construction mortar, monotonization of the gaps between the slabs; the second tier – installation of scaffolding, delivery of pallets with bricks, delivery of boxes with construction mortar, installation of the intermediate staircase and the first flight of stairs; the third tier – raising scaffolding, supplying pallets with bricks, supplying boxes with construction solution, dismantling scaffolding, installing floor slabs and the second flight of stairs; The second flow is the masonry of stone structures of the first, second and third tiers. As a result of the conducted research, the theoretical dependence of the numerical composition of the complex brigade on the volume of work on the fence, the norms of labor costs and the conditions of performance of the work were established. At the same time, the limitations of the minimum numerical composition of the link were taken into account, with the condition of its ability to perform the most complex process from the components of the flow, which determines the need for the largest number of performers. Also, restrictions on the maximum number of performers are taken into account, provided that each performer is provided with a sufficient front of work to perform it during the shift, and restrictions on the workload of performers depending on the accepted number of construction machines. The obtained results make it possible to optimize the technological design process.
- 26 December 2022
- Published by Kyiv National University of Construction and Architecture in Building constructions. Theory and Practice
- No. 11,p. 115-124
Open AccessTHE FUNDAMENTALS OF FORMING THE NUMERICAL COMPOSITION OF THE COMPLEX BRIGADE OF MASON-INSTALLERS
The design of the flow method of the construction of a multi-story residential building with stone walls and prefabricated reinforced concrete floor structures has its own features, namely, the presence of mechanized and non-mechanized (manual) processes, which implies a significant difference in the number of performers when coordinating flows among themselves. Taking into account the importance of ensuring the rhythmic execution of construction processes, the formation of the optimal numerical composition of the complex brigade is an urgent issue. As a result of the research, the complex process of building stone houses with prefabricated floors was divided into two streams: The first stream - assembly, transport and auxiliary processes: the first tier - delivery of pallets with bricks, delivery of boxes with construction mortar, monotonization of the gaps between the slabs; the second tier – installation of scaffolding, delivery of pallets with bricks, delivery of boxes with construction mortar, installation of the intermediate staircase and the first flight of stairs; the third tier – raising scaffolding, supplying pallets with bricks, supplying boxes with construction solution, dismantling scaffolding, installing floor slabs and the second flight of stairs; The second flow is the masonry of stone structures of the first, second and third tiers. As a result of the conducted research, the theoretical dependence of the numerical composition of the complex brigade on the volume of work on the fence, the norms of labor costs and the conditions of performance of the work were established. At the same time, the limitations of the minimum numerical composition of the link were taken into account, with the condition of its ability to perform the most complex process from the components of the flow, which determines the need for the largest number of performers. Also, restrictions on the maximum number of performers are taken into account, provided that each performer is provided with a sufficient front of work to perform it during the shift, and restrictions on the workload of performers depending on the accepted number of construction machines. The obtained results make it possible to optimize the technological design process.