Sangheon Jeong
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Sangheon Jeong has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Bo Shi
ERI Gyeongsang National University, Jinju, GN, South Korea
2 shared publications - Jaeseok Choi
Senior Member, IEEE, Dept. of Electrical Engineering, Gyeongsang National University, Jinju, GN, Korea
2 shared publications - Jeongje Park
Dept. of Electrical Engineering, ERI Gyeongsang National University, Jinju, GN, Korea
2 shared publications - A. A. El-Keib
Dept. of Elect. and Computer Eng., The University of Alabama, Tuscaloosa, Alabama, USA
1 shared publication - A. A. El-Keib
Dept. of Electrical Engineering The Petroleum Institute, United Arab Emirates
1 shared publication - Bo Shi
Dept. of Electrical Engineering, Gyeongsang National University, Jinju, GN, Korea
1 shared publication
Latest Publications
- 1 October 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 229-233
Area Annual Outage Cost Assessment of KEPCO System by TRELSS
In recent years, area outage cost assessment and studies that relate to this topic have been receiving increased attention and growing importance due to the competitive electricity market environment. This paper presents a methodology of the area annual outage cost (AAOC). It uses the EPRI transmission reliability evaluation for large-scale systems program (TRELSS). It evaluates the interrupted energy assessment rate (IEAK) using a macro approach which utilizes the relationship between the gross regional domestic product (GRDP) and the electrical energy demand. TRELSS is used to evaluate the expected energy not supplied (EENS) of each area. Test results on the Korean Electric Power Company system are included in the paper.
- 1 October 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 229-233
Area Annual Outage Cost Assessment of KEPCO System by TRELSS
In recent years, area outage cost assessment and studies that relate to this topic have been receiving increased attention and growing importance due to the competitive electricity market environment. This paper presents a methodology of the area annual outage cost (AAOC). It uses the EPRI transmission reliability evaluation for large-scale systems program (TRELSS). It evaluates the interrupted energy assessment rate (IEAK) using a macro approach which utilizes the relationship between the gross regional domestic product (GRDP) and the electrical energy demand. TRELSS is used to evaluate the expected energy not supplied (EENS) of each area. Test results on the Korean Electric Power Company system are included in the paper.
- 1 October 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 118-124
CO2, SOx and NOx Emissions Constrained Multi-Criteria-Best Generation Mix Using Fuzzy Set Theory
A new approach considering CO 2 air pollution constraints in the long-term generation mix is proposed under uncertain circumstances. CO 2 emission of electricity system industry has over thirty percent of total emission quantity in the world. The CO 2 emission in coal power plant competitive with nuclear power plant is very severe. The air pollution in coal is requiring LNG or new environmental type generation system (wind power, solar power tidal power et al.) instead of coal power plant, despite the new generation systems ask for very high construction cost. A characteristic feature of the presented approach in this paper is what effects give the air pollution constraints in long term best generation mix. Best generation mix problem is formulated by linear programming with fuel and construction cost minimization with load growth, reliability (reserve margin rate) and air pollution constraints. The proposed method accommodates the operation of pumped-storage generator. It was assumed in this study that the construction planning of the hydro power plants is given separately from the other generation plans. The effectiveness of the proposed approach is demonstrated by applying to the best generation mix problem of KEPCO-system, which contains nuclear, coal, LNG, oil and pumped-storage hydro plant in multi-years.
- 1 October 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 118-124
CO2, SOx and NOx Emissions Constrained Multi-Criteria-Best Generation Mix Using Fuzzy Set Theory
A new approach considering CO 2 air pollution constraints in the long-term generation mix is proposed under uncertain circumstances. CO 2 emission of electricity system industry has over thirty percent of total emission quantity in the world. The CO 2 emission in coal power plant competitive with nuclear power plant is very severe. The air pollution in coal is requiring LNG or new environmental type generation system (wind power, solar power tidal power et al.) instead of coal power plant, despite the new generation systems ask for very high construction cost. A characteristic feature of the presented approach in this paper is what effects give the air pollution constraints in long term best generation mix. Best generation mix problem is formulated by linear programming with fuel and construction cost minimization with load growth, reliability (reserve margin rate) and air pollution constraints. The proposed method accommodates the operation of pumped-storage generator. It was assumed in this study that the construction planning of the hydro power plants is given separately from the other generation plans. The effectiveness of the proposed approach is demonstrated by applying to the best generation mix problem of KEPCO-system, which contains nuclear, coal, LNG, oil and pumped-storage hydro plant in multi-years.
- 1 June 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE) in 2007 IEEE Power Engineering Society General Meeting
- p. 1-5
Probabilistic Reliability Evaluation of Korea Power System in Operation Mode
Reliable operation of power system is fundamental to the on-going industry reform. This paper presents the result of marginal power flow evaluation performed on Korean power system using two commercial software packages: Physical and Operational Margins (POM V. 2.2) and probabilistic reliability assessment (PRA V. 3.1), respectively. The case study of Korea power system for year 2006 data shows that these packages are effective in identifying possible weak points and root causes for likely reliability problems. The potential for these software packages is being explored further for assisting system operators with managing Korea power system under real-life setting in the near future.
- 1 June 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE) in 2007 IEEE Power Engineering Society General Meeting
- p. 1-5
Probabilistic Reliability Evaluation of Korea Power System in Operation Mode
Reliable operation of power system is fundamental to the on-going industry reform. This paper presents the result of marginal power flow evaluation performed on Korean power system using two commercial software packages: Physical and Operational Margins (POM V. 2.2) and probabilistic reliability assessment (PRA V. 3.1), respectively. The case study of Korea power system for year 2006 data shows that these packages are effective in identifying possible weak points and root causes for likely reliability problems. The potential for these software packages is being explored further for assisting system operators with managing Korea power system under real-life setting in the near future.