Marco Semini
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Marco Semini has a total of 20 co-authors. Here are the top co-authors by number of shared publications:
- Erlend Alfnes
Norwegian University of Science and Technology
4 shared publications - Jo Wessel Strandhagen
SINTEF
2 shared publications - Aili Biriita Bertnum
Norwegian University of Science and Technology
1 shared publication - Bjørn Andersen
Department of Mechanical and Industrial Engineering, Norwegian University of Science and Technology, Trondheim, Norway
1 shared publication Clara Patek
Department of Mechanical and Industrial Engineering, Norwegian University of Science and Technology, Trondheim, Norway
1 shared publication- Daryl Powell
University of South-Eastern Norway
1 shared publication
Latest Publications
- 8 September 2024
- Published by Springer Nature
- p. 152-166
Yard Logistics: Framework and Classification of Yard Types
- 8 September 2024
- Published by Springer Nature
- p. 152-166
Yard Logistics: Framework and Classification of Yard Types
- 8 September 2024
- Published by Springer Nature
- p. 508-521
Construction Logistics Conceptualization: A Comprehensive Framework and Existing Challenges
- 8 September 2024
- Published by Springer Nature
- p. 508-521
Construction Logistics Conceptualization: A Comprehensive Framework and Existing Challenges
- 14 September 2023
- Published by Springer Nature
- p. 3-18
Towards a Concept for Digitalized Yard Logistics—Outlining the Next-Generation Features
- 14 September 2023
- Published by Springer Nature
- p. 3-18
Towards a Concept for Digitalized Yard Logistics—Outlining the Next-Generation Features
- 14 September 2023
- Published by Springer Nature
- p. 515-530
Effect of Machine Sharing in Medical Laboratories
- 14 September 2023
- Published by Springer Nature
- p. 515-530
Effect of Machine Sharing in Medical Laboratories
- 28 January 2023
- Published by SAGE Publications in Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment
- Vol. 237 (3) , 658-676
Some relationships between build strategy and shipbuilding time in European shipbuilding
The build strategy of a ship specifies what is to be produced how, when, where and with what resources. Although it has been emphasised to play an important role in determining shipbuilding time and cost, scientific research on build strategy is limited. In this study, we focus on three interrelated build strategic factors of particular importance in European shipbuilding: hull production offshoring, pre-erection outfitting and the overlap between engineering and production. The study investigates how each of these three factors relates to physical ship production time and to total ship delivery time from contract signing to delivery. We use multiple linear regression on data about European shipyards and the ships they have built, which were obtained from a questionnaire and ship databases. The sample consists of 76 specialised ships, predominantly offshore support vessels, fishing vessels, ferries and other non-cargo carrying vessels, built at 24 European yards. The results provide evidence that yards practicing hull production offshoring have shorter ship production and delivery times than yards building the hulls at their own premises, even though the practice of offshoring itself is likely to have an adverse effect on shipbuilding time. The study also found a significant relationship between the level of pre-erection outfitting and physical production time. On the other hand, overlapping engineering and production only seems to have a limited impact on the production and the delivery time. Several of our results challenge established thinking and provide new insights into the factors affecting production and delivery time in European shipbuilding.
- 28 January 2023
- Published by SAGE Publications in Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment
- Vol. 237 (3) , 658-676
Some relationships between build strategy and shipbuilding time in European shipbuilding
The build strategy of a ship specifies what is to be produced how, when, where and with what resources. Although it has been emphasised to play an important role in determining shipbuilding time and cost, scientific research on build strategy is limited. In this study, we focus on three interrelated build strategic factors of particular importance in European shipbuilding: hull production offshoring, pre-erection outfitting and the overlap between engineering and production. The study investigates how each of these three factors relates to physical ship production time and to total ship delivery time from contract signing to delivery. We use multiple linear regression on data about European shipyards and the ships they have built, which were obtained from a questionnaire and ship databases. The sample consists of 76 specialised ships, predominantly offshore support vessels, fishing vessels, ferries and other non-cargo carrying vessels, built at 24 European yards. The results provide evidence that yards practicing hull production offshoring have shorter ship production and delivery times than yards building the hulls at their own premises, even though the practice of offshoring itself is likely to have an adverse effect on shipbuilding time. The study also found a significant relationship between the level of pre-erection outfitting and physical production time. On the other hand, overlapping engineering and production only seems to have a limited impact on the production and the delivery time. Several of our results challenge established thinking and provide new insights into the factors affecting production and delivery time in European shipbuilding.
- 29 December 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 961-965
Investigating production planning and control challenges in the semi-process industry, the case of a metal parts producer
Production planning and control (PPC) plays a vital role for the competitiveness of every company. Its application in the process industries still faces major problems and limitations. The process industries are currently facing an increasing trend in demand variability and uncertainty. Too little is known about the link between industry specific characteristics and matching PPC approaches. In this paper, we investigate the characteristics that pose critical challenges when applying PPC concepts in the semi-process industry. The results of our study show a conflict between flexibility-requiring and flexibility-limiting characteristics. Through the use of a literature review and case study we demonstrate the limitations of material requirements planning to address this new situation.
- 29 December 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 961-965
Investigating production planning and control challenges in the semi-process industry, the case of a metal parts producer
Production planning and control (PPC) plays a vital role for the competitiveness of every company. Its application in the process industries still faces major problems and limitations. The process industries are currently facing an increasing trend in demand variability and uncertainty. Too little is known about the link between industry specific characteristics and matching PPC approaches. In this paper, we investigate the characteristics that pose critical challenges when applying PPC concepts in the semi-process industry. The results of our study show a conflict between flexibility-requiring and flexibility-limiting characteristics. Through the use of a literature review and case study we demonstrate the limitations of material requirements planning to address this new situation.
- Open Access
- 18 August 2015
- Published by Springer Nature
- p. 215-222
Detecting Early Warning Signs of Delays in Shipbuilding Projects
- 18 August 2015
- Published by Springer Nature
- p. 215-222
Open AccessDetecting Early Warning Signs of Delays in Shipbuilding Projects
- 1 December 2006
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 08917736,p. 1946-1953
Applications of Discrete-Event Simulation to Support Manufacturing Logistics Decision-Making: A Survey
This paper presents a literature survey on recent use of discrete-event simulation in real-world manufacturing logistics decision-making. The sample of the survey consists of 52 relevant application papers from recent Winter Simulation Conference proceedings. We investigated what decisions were supported by the applications, case company characteristics, some methodological issues, and the software tools used. We found that the majority of applications has been reported in production plant design and in the evaluation of production policies, lot sizes, WIP levels and production plans/schedules. Findings also suggest that general-purpose DES software tools are suitable in most of these cases. For different possible reasons, few applications for multi-echelon supply chain decision-making have been reported. Software requirements for supply chain simulations also seem to differ slightly from those for established application areas. The applications described were carried out in a variety of different industries, with a clear predominance in the semiconductor and automotive industries
- 1 December 2006
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 08917736,p. 1946-1953
Applications of Discrete-Event Simulation to Support Manufacturing Logistics Decision-Making: A Survey
This paper presents a literature survey on recent use of discrete-event simulation in real-world manufacturing logistics decision-making. The sample of the survey consists of 52 relevant application papers from recent Winter Simulation Conference proceedings. We investigated what decisions were supported by the applications, case company characteristics, some methodological issues, and the software tools used. We found that the majority of applications has been reported in production plant design and in the evaluation of production policies, lot sizes, WIP levels and production plans/schedules. Findings also suggest that general-purpose DES software tools are suitable in most of these cases. For different possible reasons, few applications for multi-echelon supply chain decision-making have been reported. Software requirements for supply chain simulations also seem to differ slightly from those for established application areas. The applications described were carried out in a variety of different industries, with a clear predominance in the semiconductor and automotive industries