M. Derajat Amperajaya
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
M. Derajat Amperajaya has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Arief Suwandi
Esa_Unggul_University, west_Jakarta, Indonesia
2 shared publications - Nofi Erni
Universitas Esa Unggul
2 shared publications Arief Suwandi
Industrial Engineering Department Faculty of Engineering Esa Unggul University Jakarta Indonesia
1 shared publicationGhefra Rizkan Gaffara
Esa Unggul University Jl. Arjuna Utara 9 A, Duri Kepa 11510 Kebon Jeruk Jakarta Indonesia
1 shared publication- Ghefra Rizkan Gaffara
Esa Unggul University
1 shared publication Lius Natalia
1 shared publication
Latest Publications
- Open Access
- 1 January 2023
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2485 (1)
Reduction of bolt product defects at PT. GIP using Six Sigma method
PT. GIP is a company that produces fastening products, including: Self Drilling Screw, Drywall Screw, Rivet, Furniture Screw, Tapping Screw, Bicycle Part, Euro Screw, Special Screw, Furniture Hi Lo Screw, Bolts, Chipboard Screw, Automotive Screw with a production system. by order. Currently, there are still many customer complaints about Bolt products. Production data shows defective products during the last 2 months amounted to 7 percent of the total production. The research objective is to improve the quality of production in order to reduce the defect rate of Bolt products. Research using the Six Sigma method consists of DMAIC stages (Define, Measure, Analyze, Improve, Control). The calculation results show that the biggest product defect in the Bolts production process is a dimensional defect with a number of defects of 442 pcs with a percentage of 59.5% of the total defects that occurred in the last 2 months. The overall average sigma level is 3.6993, this indicates that the company has not optimally implemented good quality control. After implementing the priority implementation of increasing production, there was an increase in the sigma level to 3,8457, this shows that there is an increase in the quality and performance of the company.
- 1 January 2023
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2485 (1)
Open AccessReduction of bolt product defects at PT. GIP using Six Sigma method
PT. GIP is a company that produces fastening products, including: Self Drilling Screw, Drywall Screw, Rivet, Furniture Screw, Tapping Screw, Bicycle Part, Euro Screw, Special Screw, Furniture Hi Lo Screw, Bolts, Chipboard Screw, Automotive Screw with a production system. by order. Currently, there are still many customer complaints about Bolt products. Production data shows defective products during the last 2 months amounted to 7 percent of the total production. The research objective is to improve the quality of production in order to reduce the defect rate of Bolt products. Research using the Six Sigma method consists of DMAIC stages (Define, Measure, Analyze, Improve, Control). The calculation results show that the biggest product defect in the Bolts production process is a dimensional defect with a number of defects of 442 pcs with a percentage of 59.5% of the total defects that occurred in the last 2 months. The overall average sigma level is 3.6993, this indicates that the company has not optimally implemented good quality control. After implementing the priority implementation of increasing production, there was an increase in the sigma level to 3,8457, this shows that there is an increase in the quality and performance of the company.
- Open Access
- 22 December 2022
- Published by Atlantis Press SARL
- p. 320-333
Measurement and Effort to Improve OEE Value of SMC 2000 DST Machinery A PT. XYZ with PDCA Method
- 22 December 2022
- Published by Atlantis Press SARL
- p. 320-333
Open AccessMeasurement and Effort to Improve OEE Value of SMC 2000 DST Machinery A PT. XYZ with PDCA Method
- Open Access
- 22 December 2022
- Published by Atlantis Press SARL
- p. 172-179
Northern Java Industrial Development Refers to Sustainable Development Goals
- 22 December 2022
- Published by Atlantis Press SARL
- p. 172-179
Open AccessNorthern Java Industrial Development Refers to Sustainable Development Goals
- Open Access
- 1 January 2020
- Published by European Alliance for Innovation n.o.
Design of Motorcycle Parking Management for Optimizing Queuing System at Exit Gate (Case Study: Esa Unggul University)
Tight competition among University made the University not selected by reputation only but also by the facilities. The parking area is one of the essential facilities to satisfy the demand for parking. Esa Unggul University is the one of University who has their parking area, for car and motorcycle. The long waiting line at servers of parking fee payment can make academicians feel dissatisfaction, especially students as the customers. The long waiting line can be caused by several factors, like the population's size, the queue discipline, the number of servers, and design of the parking area. Even the method of work can be affected by the length of process time and causing the long line. Based on the analyze, the customer arrival rate (λ) is 3,493 motorcycle per minute, and the service rate (μ) is 3,440 motorcycle per minute. The standard time for servicing one customer is 18,885 seconds. Using queuing method and measuring of standard time method, there are three alternative models solutions. Alternative model 1 by adding the operator for checking Vehicle Registration Certificate. Alternative model 2 by building the notice boards and indicator light for showing the cause of queuing. Alternative model 3 by increasing the number of servers. The chosen model is model 2 and reducing the length of process time 40, 909%. So the service rate (μ) up to 5,815 motorcycles per minute.
- 1 January 2020
- Published by European Alliance for Innovation n.o.
Open AccessDesign of Motorcycle Parking Management for Optimizing Queuing System at Exit Gate (Case Study: Esa Unggul University)
Tight competition among University made the University not selected by reputation only but also by the facilities. The parking area is one of the essential facilities to satisfy the demand for parking. Esa Unggul University is the one of University who has their parking area, for car and motorcycle. The long waiting line at servers of parking fee payment can make academicians feel dissatisfaction, especially students as the customers. The long waiting line can be caused by several factors, like the population's size, the queue discipline, the number of servers, and design of the parking area. Even the method of work can be affected by the length of process time and causing the long line. Based on the analyze, the customer arrival rate (λ) is 3,493 motorcycle per minute, and the service rate (μ) is 3,440 motorcycle per minute. The standard time for servicing one customer is 18,885 seconds. Using queuing method and measuring of standard time method, there are three alternative models solutions. Alternative model 1 by adding the operator for checking Vehicle Registration Certificate. Alternative model 2 by building the notice boards and indicator light for showing the cause of queuing. Alternative model 3 by increasing the number of servers. The chosen model is model 2 and reducing the length of process time 40, 909%. So the service rate (μ) up to 5,815 motorcycles per minute.