YSYa Shu

Ya Shu

*This is an algorithmically generated author record based on publicly available information.

Ya Shu has a total of 5 co-authors. Here are the top co-authors by number of shared publications:

  • Chaozhe Jiang

    School of Transportation and Logistics, Southwest Jiaotong University , Chengdu 611756 , Sichuan, China

    1 shared publication
  • Chenyang Zhang

    School of Transportation and Logistics, Southwest Jiaotong University , Chengdu 611756 , Sichuan, China

    1 shared publication
  • Hua Chen

    Sichuan FAST Fire Safety Assessment Co., LTD. , Chengdu 610036 , Sichuan, China

    1 shared publication
  • Jieyu Zhang

    Sichuan FAST Fire Safety Assessment Co., LTD. , Chengdu 610036 , Sichuan, China

    1 shared publication
  • Xinjian Qi

    Shenzhen Metro Group Co., LTD. , Shenzhen 518026 , Guangdong, China

    1 shared publication

Latest Publications

  • Open Access

    Simulation of fire emergency evacuation in a large-passenger-flow subway station based on the on-site measured data of Shenzhen Metro

    by Hua Chen, Chenyang Zhang, Jieyu Zhang, Ya Shu, Xinjian Qi, Chaozhe Jiang

    Because of its large capacity, high efficiency and energy savings, the subway has gradually become the primary mode of transportation for citizens. A high density of passengers exists within a large-passenger-flow subway station, and the number of casualties and injuries during a fire emergency is substantial. In this paper, Pathfinder software and on-site measured data of Pingzhou station in Shenzhen (China) were utilized to simulate a fire emergency evacuation in a large-passenger-flow subway station. The Required Safe Egress Time (RSET), number of passengers and flow rates of stairs and escalators were analysed for three fire evacuation scenarios: train fire, platform fire and hall fire. The evacuation time of the train fire, which was 1173 s, was the longest, and 3621 occupants needed to evacuate when the train was fully loaded. Occupants could not complete the evacuation within 6 mins in all three fire evacuation scenarios, which does not meet the current standard requirements and codes. By changing the number of passengers and the number of stairs for evacuation, the flow rate capacity and evacuation time were explored, which have reference values for safety management and emergency evacuation plan optimization during peak hours of subway operation.