LingChao Shou
Research Subjects
LingChao Shou has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
HeQuan Zhao
Publishers Chinese China Railway 14th Bureau Group Mege Shield Construction Engineering Co. Ltd
1 shared publicationHengxu Zhang
Chinese Railway 14th Bureau Group Da Dun Construction Co. LTD, Hangzhou 311265
1 shared publicationJin Pang
Zhejiang Mingsui Technology Co., LTD, Hangzhou 310000
1 shared publication- Jin Pang
Chinese Zhejiang Mingsui Technology Co. Ltd
1 shared publication - LiFeng Wang
Faculty of Civil Engineering, Zhejiang University of Science and Technology, Hangzhou 310023, China
1 shared publication Ting Bao
Chinese Zhejiang Mingsui Technology Co. Ltd
1 shared publication
Latest Publications
- Open Access
- 21 September 2023
- Published by IOS Press
- p. 551-557
Analysis of Influence of Large Diameter Shield Tunnel Construction on Levee
The paper takes Genshan Road crossing River tunnel as the research object and analyzes the measured data of surface settlement when the shield tunnel passes through the levee. The results show: the ratio of the settlement value to the total settlement is relatively large in the two stages of the passage of the shield and after the passage of the shield, which is 44.5% and 25.5%, respectively. The influence range of shield tunnel construction on levee settlement is 2.3D (D is the tunnel diameter of 14.5m).
- 21 September 2023
- Published by IOS Press
- p. 551-557
Open AccessAnalysis of Influence of Large Diameter Shield Tunnel Construction on Levee
The paper takes Genshan Road crossing River tunnel as the research object and analyzes the measured data of surface settlement when the shield tunnel passes through the levee. The results show: the ratio of the settlement value to the total settlement is relatively large in the two stages of the passage of the shield and after the passage of the shield, which is 44.5% and 25.5%, respectively. The influence range of shield tunnel construction on levee settlement is 2.3D (D is the tunnel diameter of 14.5m).
- Open Access
- 14 February 2023
- Published by Springer Nature
- p. 197-210
Analysis of the Influence of Foundation Pit Excavation on the Surrounding Surface Settlement and Retaining Structure
This paper analyzes the foundation pit of Gen Shan East Road through tunnels under the river. The results show: When digging to the bottom, the maximum horizontal displacement of the wall is located at 2 ~ 4 m above the bottom of the pit, and the maximum value is 0.57‰ ~ 0.64‰H. The surface subsidence is mainly of groove type. The maximum surface settlement is 0.107%H. The mean value of the maximum surface settlement is about 0.91 times the maximum horizontal displacement of the wall, and the maximum surface settlement is between 0.58 and 1.91 times the maximum horizontal displacement of the wall.
- 14 February 2023
- Published by Springer Nature
- p. 197-210
Open AccessAnalysis of the Influence of Foundation Pit Excavation on the Surrounding Surface Settlement and Retaining Structure
This paper analyzes the foundation pit of Gen Shan East Road through tunnels under the river. The results show: When digging to the bottom, the maximum horizontal displacement of the wall is located at 2 ~ 4 m above the bottom of the pit, and the maximum value is 0.57‰ ~ 0.64‰H. The surface subsidence is mainly of groove type. The maximum surface settlement is 0.107%H. The mean value of the maximum surface settlement is about 0.91 times the maximum horizontal displacement of the wall, and the maximum surface settlement is between 0.58 and 1.91 times the maximum horizontal displacement of the wall.