FGFikadu Gebremedhin

Fikadu Gebremedhin

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Fikadu Gebremedhin has a total of 7 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Examining the Project Success Antecedents of Public Private Partnerships (PPP) in Public Infrastructure Works of Zambia

    by Erastus Mwanaumo, Alexander C. Msimuko, Fikadu Gebremedhin, Steve Ngoy, Penjani Nyimbili, Ethel Tembo Mwanaumo

    Infrastructure development has long been considered a catalytic factor in a country's economic development. Zambia has experienced a deficit in infrastructure that has prevented developmental and economic growth. For far too long now, policy makers have aimed at reducing the national debt, and find a better financing method for infrastructure projects, and have now turned to Public Private Partnerships (PPP) to finance these projects. However, the problem of PPPs has been that of poorly implemented critical success factors that have led to deprived financing of infrastructure, budget constraints, inefficiencies in managing infrastructure on the side of the public sector, and poor public spending poor public spending and inefficiencies in managing infrastructure on the public sector side. This study examined the influence of PPP success antecedents on actual PPP project success. A quantitative research design was employed with data collected using a structured questionnaire from a sample of 90 PPP practitioners drawn from both the public and private sector organisations. Data collected was analysed using correlation and hierarchical regression models. The findings indicate that the institutional theory and the Human capital theories are applicable in the Zambian context. Further, favourable business environment factors, reliable concessionaire consortium factors, sound financial factors and economic viability and appropriate risk allocation factors are significant determinants with a combined large effect size of (0.917) and a coefficient of determination of 82.8%. More so, finds revealed that the largest predictors of actual PPP project success in Lusaka are sound financial factors, economic viability and appropriate risk allocation factors.

  • Open Access

    Construction site layout planning practices in inner-city building projects: space requirement variables, classification and relationship

    by Fikadu G. Tsegay, Erastus Mwanaumo, Balimu Mwiya

    An inner-city building construction site for vacant land development or redevelopment of existing property is a site surrounded by buildings, occupants, and busy street(s); its space is the most important but limited resource that needs wisely planned and professionally used. The study aimed to assess the construction site layout planning (CSLP) practice and the classification of space requirement variables for inner-city building sites. Thus, the study adopted a triangulated study approach and the data was collected through a sequential mixed method that includes case studies: semi-structured interviews, document evaluation, and site visits observation followed by a two-round Delphi survey. The study has identified the space requirement variables, classification, and relationship for CSLP of inner-city sites; classified under three categories: Micro-space (four), Macro-space (18), and Paths (five); and have significant to strong associations with each other. The current practice shows the CSLP is overlooked or fragmented which causes a congested site condition. So, the provided insight on the strong relationship between space requirements will be a basis for shifting from the temporary-facility-centered planning methods towards an integrated CSLP approach to overcome contractors’ problems in the continued redevelopment demand of the inner city.