Shu Sun
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Shu Sun has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Yongsheng Yang
Institute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai 201306, China
4 shared publications - Junkai Feng
Institute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai 201306, China
2 shared publications - Feiteng Zhao
Institute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai 201306, China
1 shared publication - Furong Wen
Beibu Gulf Port Co., Ltd., Nanning 530000, China
1 shared publication - Haitao Song
Beibu Gulf Port Co., Ltd., Nanning 530000, China
1 shared publication - Hong Yin
China Mobile (Shanghai) Information Communication Technology Co., Ltd., Shanghai 201306, China
1 shared publication
Latest Publications
- Open Access
- 9 December 2025
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 13 (12) , 2344
Simulation and Optimization of Collaborative Scheduling of AGV and Yard Crane in U-Shaped Automated Terminal Based on Deep Reinforcement Learning
In U-shaped automated container terminals (U-shaped ACTs), automated guided vehicles (AGVs) need to frequently interact with yard cranes (YCs), and separate scheduling of the two devices will affect terminal efficiency. Therefore, this study explores the coordinated scheduling problem between the two devices. To solve this problem, a high-precision simulation model of the U-shaped ACTs is established, which incorporates real operational logic. Second, an Improved Non-dominated Sorting Genetic Algorithm II based on Proximal Policy Optimization (INSGAII-PPO) is proposed. The algorithm uses PPO to realize dynamic genetic operator selection and makes related improvements, which improve the multi-objective optimization ability of NSGAII, and solve the collaborative scheduling problem by combining simulation. Finally, a hybrid weighted Technique for Order Preference by Similarity to Ideal Solution with preferences is proposed to select the final solution. The experimental results show that the scheme obtained by INSGAII-PPO exhibits better convergence and diversity, and offers significant advantages compared with the comparison algorithms. Moreover, the energy consumption and waiting time of the final solution selected by the proposed method are reduced by 3.42% and 4.87% on average. The proposed method has the capability of providing a theoretical reference for the AGVs and YCs collaborative scheduling of U-shaped ACTs.
- 9 December 2025
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 13 (12) , 2344
Open AccessSimulation and Optimization of Collaborative Scheduling of AGV and Yard Crane in U-Shaped Automated Terminal Based on Deep Reinforcement Learning
In U-shaped automated container terminals (U-shaped ACTs), automated guided vehicles (AGVs) need to frequently interact with yard cranes (YCs), and separate scheduling of the two devices will affect terminal efficiency. Therefore, this study explores the coordinated scheduling problem between the two devices. To solve this problem, a high-precision simulation model of the U-shaped ACTs is established, which incorporates real operational logic. Second, an Improved Non-dominated Sorting Genetic Algorithm II based on Proximal Policy Optimization (INSGAII-PPO) is proposed. The algorithm uses PPO to realize dynamic genetic operator selection and makes related improvements, which improve the multi-objective optimization ability of NSGAII, and solve the collaborative scheduling problem by combining simulation. Finally, a hybrid weighted Technique for Order Preference by Similarity to Ideal Solution with preferences is proposed to select the final solution. The experimental results show that the scheme obtained by INSGAII-PPO exhibits better convergence and diversity, and offers significant advantages compared with the comparison algorithms. Moreover, the energy consumption and waiting time of the final solution selected by the proposed method are reduced by 3.42% and 4.87% on average. The proposed method has the capability of providing a theoretical reference for the AGVs and YCs collaborative scheduling of U-shaped ACTs.
- Open Access
- 12 October 2023
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 11 (10) , 1975
Research on the Multi-Equipment Cooperative Scheduling Method of Sea-Rail Automated Container Terminals under the Loading and Unloading Mode
A sea-rail automated container terminal (SRACT) plays a crucial role in the global logistics network, combining the benefits of sea and railway transportation. However, addressing the challenges of multi-equipment cooperative scheduling in terminal and railway operation areas is essential to ensure efficient container transportation. For the first time, this study addresses the cooperative scheduling challenges among railway gantry cranes, yard cranes, and automated guided vehicles (AGVs) under the loading and unloading mode in SRACTs, ensuring efficient container transportation. This requires the development of a practical scheduling model and algorithm. In this study, a mixed integer programming model was established for the first time to study the multi-equipment cooperative scheduling problem of a SRACT under the loading and unloading mode. A self-adaptive chaotic genetic algorithm was designed to solve the model, and the practicability and effectiveness of the model and algorithm were verified by simulation experiments. Furthermore, this study also proposes an AGV number adjustment strategy to accommodate changes in vessel arrival delays and train container types. Simulation experiments demonstrated that this strategy significantly reduces loading and unloading time, decreases equipment energy consumption, and improves the utilization rate of AGVs. This research provides valuable guidance for ongoing SRACT projects and advances and methodological approaches in multi-equipment co-operative scheduling for such terminals.
- 12 October 2023
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 11 (10) , 1975
Open AccessResearch on the Multi-Equipment Cooperative Scheduling Method of Sea-Rail Automated Container Terminals under the Loading and Unloading Mode
A sea-rail automated container terminal (SRACT) plays a crucial role in the global logistics network, combining the benefits of sea and railway transportation. However, addressing the challenges of multi-equipment cooperative scheduling in terminal and railway operation areas is essential to ensure efficient container transportation. For the first time, this study addresses the cooperative scheduling challenges among railway gantry cranes, yard cranes, and automated guided vehicles (AGVs) under the loading and unloading mode in SRACTs, ensuring efficient container transportation. This requires the development of a practical scheduling model and algorithm. In this study, a mixed integer programming model was established for the first time to study the multi-equipment cooperative scheduling problem of a SRACT under the loading and unloading mode. A self-adaptive chaotic genetic algorithm was designed to solve the model, and the practicability and effectiveness of the model and algorithm were verified by simulation experiments. Furthermore, this study also proposes an AGV number adjustment strategy to accommodate changes in vessel arrival delays and train container types. Simulation experiments demonstrated that this strategy significantly reduces loading and unloading time, decreases equipment energy consumption, and improves the utilization rate of AGVs. This research provides valuable guidance for ongoing SRACT projects and advances and methodological approaches in multi-equipment co-operative scheduling for such terminals.
- Open Access
- 13 March 2023
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 11 (3) , 605
A Refined Collaborative Scheduling Method for Multi-Equipment at U-Shaped Automated Container Terminals Based on Rail Crane Process Optimization
A U-shaped automated container terminal (ACT) has been proposed for the first time globally and has been adopted to construct the Beibu Gulf Port ACT. In this ACT layout, the double cantilevered rail crane (DCRC) simultaneously provides loading and unloading services for the external container trucks (ECTs) and the automatic guided vehicles (AGVs) entering the yard. The DCRC has a complex scheduling coupling relationship with the AGV and the ECT, and its mathematical model is extremely complex. There is an urgent need to study a practical collaborative scheduling optimization model and algorithm for the DCRC, the AGV, and the ECT. In this paper, we optimize the process flow of DCRCs to study the refined collaborative scheduling model of DCRCs, AGVs and ECTs in U-shaped ACTs. Firstly, we analyze the operation process of the DCRC and divide the 16 loading and unloading conditions of the DCRC into four operation modes for process optimization. Secondly, different variables and parameters are set for the DCRC’s four operating modes, and a refined collaborative dispatching model for the DCRCs with AGVs and ECTs is proposed. Finally, a practical adaptive co-evolutionary genetic algorithm solves the model. Meanwhile, arithmetic examples verify the correctness and practicality of the model and algorithm. The experimental results show that the total running time of the DCRCs is the shortest in the U-shaped ACT when the number of quay cranes (QC) to DCRC and AGV ratios are 1:2 and 1:10, respectively. At the same time, the number of QCs and DCRCs has a more significant impact on the efficiency of the ACT than that of AGVs, and priority should be given to the allocation of QCs and DCRCs. The research results have essential guidance value for U-shaped ACTs under construction and enrich the theory and method of collaborative scheduling of U-shaped ACT equipment.
- 13 March 2023
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 11 (3) , 605
Open AccessA Refined Collaborative Scheduling Method for Multi-Equipment at U-Shaped Automated Container Terminals Based on Rail Crane Process Optimization
A U-shaped automated container terminal (ACT) has been proposed for the first time globally and has been adopted to construct the Beibu Gulf Port ACT. In this ACT layout, the double cantilevered rail crane (DCRC) simultaneously provides loading and unloading services for the external container trucks (ECTs) and the automatic guided vehicles (AGVs) entering the yard. The DCRC has a complex scheduling coupling relationship with the AGV and the ECT, and its mathematical model is extremely complex. There is an urgent need to study a practical collaborative scheduling optimization model and algorithm for the DCRC, the AGV, and the ECT. In this paper, we optimize the process flow of DCRCs to study the refined collaborative scheduling model of DCRCs, AGVs and ECTs in U-shaped ACTs. Firstly, we analyze the operation process of the DCRC and divide the 16 loading and unloading conditions of the DCRC into four operation modes for process optimization. Secondly, different variables and parameters are set for the DCRC’s four operating modes, and a refined collaborative dispatching model for the DCRCs with AGVs and ECTs is proposed. Finally, a practical adaptive co-evolutionary genetic algorithm solves the model. Meanwhile, arithmetic examples verify the correctness and practicality of the model and algorithm. The experimental results show that the total running time of the DCRCs is the shortest in the U-shaped ACT when the number of quay cranes (QC) to DCRC and AGV ratios are 1:2 and 1:10, respectively. At the same time, the number of QCs and DCRCs has a more significant impact on the efficiency of the ACT than that of AGVs, and priority should be given to the allocation of QCs and DCRCs. The research results have essential guidance value for U-shaped ACTs under construction and enrich the theory and method of collaborative scheduling of U-shaped ACT equipment.
- Open Access
- 6 March 2023
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 11 (3) , 557
Research on the Cooperative Scheduling of ARMGs and AGVs in a Sea–Rail Automated Container Terminal under the Rail-in-Port Model
Reasonable scheduling of a train’s loading and unloading equipment can reduce the energy consumption of production operations; this has great value for the green development of terminals. The collaborative scheduling model of the Automated Rail Mounted Gantry (ARMG) and Automated Guided Vehicle (AGV) is used to minimize the energy consumption of equipment in a scenario of a vertical railway entering a port and a shared storage yard existing between the port and railway under the mixed operation mode of “train–ship” and “train–yard–ship”. According to the characteristics of the model, the two-layer scheduling rule and the self-adaptive chaos genetic algorithm (SCGA) were proposed to solve the problem of placing the ARMG and the AGV on the same schedule. Simulation experiments verified the effectiveness of the model and algorithm. The effects of the delayed arrival of vessels, the proportion of “transshipment” containers, and the number of automated ARMGs and AGVs on total energy consumption were analyzed. The results showed that when all containers are “train–ship” containers, the number of ARMG and AGV at 1:4 will minimize the total operational energy consumption. Furthermore, as ships take longer to arrive, reducing the number of AGVs can cut energy use by 15% for the same number of ARMG.
- 6 March 2023
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 11 (3) , 557
Open AccessResearch on the Cooperative Scheduling of ARMGs and AGVs in a Sea–Rail Automated Container Terminal under the Rail-in-Port Model
Reasonable scheduling of a train’s loading and unloading equipment can reduce the energy consumption of production operations; this has great value for the green development of terminals. The collaborative scheduling model of the Automated Rail Mounted Gantry (ARMG) and Automated Guided Vehicle (AGV) is used to minimize the energy consumption of equipment in a scenario of a vertical railway entering a port and a shared storage yard existing between the port and railway under the mixed operation mode of “train–ship” and “train–yard–ship”. According to the characteristics of the model, the two-layer scheduling rule and the self-adaptive chaos genetic algorithm (SCGA) were proposed to solve the problem of placing the ARMG and the AGV on the same schedule. Simulation experiments verified the effectiveness of the model and algorithm. The effects of the delayed arrival of vessels, the proportion of “transshipment” containers, and the number of automated ARMGs and AGVs on total energy consumption were analyzed. The results showed that when all containers are “train–ship” containers, the number of ARMG and AGV at 1:4 will minimize the total operational energy consumption. Furthermore, as ships take longer to arrive, reducing the number of AGVs can cut energy use by 15% for the same number of ARMG.