FKFan-Yu Kong
Fan-Yu Kong
*This is an algorithmically generated author record based on publicly available information.
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Fan-Yu Kong has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Cuixia Miao
School of Mathematical Sciences, Qufu Normal University, Qufu, 273165, P. R. China
2 shared publications - Jia-Xin Song
School of Mathematical Sciences, Qufu Normal University, Qufu, China
2 shared publications - Yu-Jia Huo
School of Mathematical Sciences, Qufu Normal University, Qufu, China
1 shared publication - Yuzhong Zhang
Tiangong University
1 shared publication
Latest Publications
- 1 January 2025
- Published by American Institute of Mathematical Sciences (AIMS) in Mathematical Foundations of Computing
- Vol. 8 (5) , 689-700
Uniform-machine scheduling problems in green manufacturing system
In this paper, we consider the uniform-machine scheduling problems under the green manufacturing system, in which the newer machine has smaller energy consumption cost. The objective are to minimize the makespan and the maximum lateness under the constrain that the total energy cost has a given upper bound $ \widehat{U} $. Considering that these problems are intractable, we assume that the uniform machines have two speeds. For the problems of minimizing the makspan, we first present a polynomial-time algorithm for the two-machine preemptive scheduling problem and then generalize to the $ m $-machine preemptive scheduling problem. Next, we present a 2-approximation algorithm for the $ m $-machine non-preemptive scheduling problem. Furthermore, for the $ m $-machine non-preemptive scheduling problem of minimizing the maximum lateness, we propose and analyze an improved EDD algorithm.- 1 January 2025
- Published by American Institute of Mathematical Sciences (AIMS) in Mathematical Foundations of Computing
- Vol. 8 (5) , 689-700
Uniform-machine scheduling problems in green manufacturing system
In this paper, we consider the uniform-machine scheduling problems under the green manufacturing system, in which the newer machine has smaller energy consumption cost. The objective are to minimize the makespan and the maximum lateness under the constrain that the total energy cost has a given upper bound $ \widehat{U} $. Considering that these problems are intractable, we assume that the uniform machines have two speeds. For the problems of minimizing the makspan, we first present a polynomial-time algorithm for the two-machine preemptive scheduling problem and then generalize to the $ m $-machine preemptive scheduling problem. Next, we present a 2-approximation algorithm for the $ m $-machine non-preemptive scheduling problem. Furthermore, for the $ m $-machine non-preemptive scheduling problem of minimizing the maximum lateness, we propose and analyze an improved EDD algorithm.- 24 March 2023
- Published by Springer Nature in Journal of the Operations Research Society of China
- Vol. 12 (4) , 1088-1102
Single-Machine Scheduling with Step-Deteriorating Jobs and Rejection
- 24 March 2023
- Published by Springer Nature in Journal of the Operations Research Society of China
- Vol. 12 (4) , 1088-1102
Single-Machine Scheduling with Step-Deteriorating Jobs and Rejection