Claudia Garrido Martins
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Claudia Garrido Martins has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Susan M. Bogus
University of New Mexico
2 shared publications - Vanessa Valentin
Department of Civil, Construction & Environmental Engineering, The University of New Mexico, Albuquerque, NM 87131, USA
2 shared publications - Assed Naked Haddad
Universidade Federal do Rio de Janeiro
1 shared publication - Bruno Barzellay Ferreira da Costa
Instituto Politécnico, Universidade Federal do Rio de Janeiro, Macaé 27930-560, Brazil
1 shared publication - Carlos Alberto Pereira Soares
Pós-Graduação em Engenharia Civil, Universidade Federal Fluminense, Niterói 24210-240, Brazil
1 shared publication Don Chen
1 shared publication
Latest Publications
- Open Access
- 16 February 2026
- Published by Elsevier in SSRN Electronic Journal
An Optimized BIM Visualization Workflow for Infrastructure Projects
This research proposes a "best practice" workflow for the rapid creation and visualization of Building Information Modeling (BIM) models in infrastructure project pursuits. Addressing the lack of standardized evaluation methodologies, the study aimed to reduce time and costs without compromising quality. The workflow integrates rapid modeling techniques, streamlined visualization, and emerging technologies like Virtual Reality (VR) and AI image generation.Validation through two case studies—the Palm Beach County and Concord Hillgrove water treatment plants—demonstrated significant resource savings compared to traditional methods. For average projects, the workflow yielded mean savings of 41.31 hours and $1,837.21. In scenarios with severe constraints, the framework achieved a 67.12% reduction in time requirements. These findings provide a quantifiable baseline for evaluating BIM benefits and optimizing delivery in high-pressure pursuit environments.
- 16 February 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessAn Optimized BIM Visualization Workflow for Infrastructure Projects
This research proposes a "best practice" workflow for the rapid creation and visualization of Building Information Modeling (BIM) models in infrastructure project pursuits. Addressing the lack of standardized evaluation methodologies, the study aimed to reduce time and costs without compromising quality. The workflow integrates rapid modeling techniques, streamlined visualization, and emerging technologies like Virtual Reality (VR) and AI image generation.Validation through two case studies—the Palm Beach County and Concord Hillgrove water treatment plants—demonstrated significant resource savings compared to traditional methods. For average projects, the workflow yielded mean savings of 41.31 hours and $1,837.21. In scenarios with severe constraints, the framework achieved a 67.12% reduction in time requirements. These findings provide a quantifiable baseline for evaluating BIM benefits and optimizing delivery in high-pressure pursuit environments.
- Open Access
Perceptions of Construction Risks Due to Fast-Track Activity Overlapping
Concurrent engineering through overlapping of activities (i.e., fast-tracking) has been used as a schedule acceleration technique. Fast-track construction projects are generally recognized as riskier and subject to risks arising due to the concurrency of work. This work reports the risk perception of construction professionals to three different degrees of overlapping. Semi-structured interviews were used to collect the data, and the analysis applied data transformation and descriptive statistics. The risks were mainly perceived in the middle degree of overlapping and in activities occurring earlier in the schedule. The low and high degrees of overlapping were mainly perceived as having no risk or not being feasible, respectively. The four risk types accounted for most of the perceived threats: construction error, design change, crew interference, and poor construction productivity. The findings of this study suggest that construction professionals perceive risks differently based on the amount of activity overlapping. It is consistent with previous studies that found that risks decrease as the project advances and that fast-track projects face additional risks.
Open AccessPerceptions of Construction Risks Due to Fast-Track Activity Overlapping
Concurrent engineering through overlapping of activities (i.e., fast-tracking) has been used as a schedule acceleration technique. Fast-track construction projects are generally recognized as riskier and subject to risks arising due to the concurrency of work. This work reports the risk perception of construction professionals to three different degrees of overlapping. Semi-structured interviews were used to collect the data, and the analysis applied data transformation and descriptive statistics. The risks were mainly perceived in the middle degree of overlapping and in activities occurring earlier in the schedule. The low and high degrees of overlapping were mainly perceived as having no risk or not being feasible, respectively. The four risk types accounted for most of the perceived threats: construction error, design change, crew interference, and poor construction productivity. The findings of this study suggest that construction professionals perceive risks differently based on the amount of activity overlapping. It is consistent with previous studies that found that risks decrease as the project advances and that fast-track projects face additional risks.
- Open Access
Cost/benefit analysis model for implementing virtual reality in construction companies
Immersive technologies (ImT), like Virtual Reality (VR), have several potential applications in the construction industry. However, the absence of a cost-benefit analysis discourages construction decision-makers from implementing these technologies. In this study, we proposed a primary model for conducting a cost-benefit analysis for implementing virtual reality in construction companies. The cost and benefit factors were identified through a literature review and considered input variables for the model, and then using synthetic data, a Monte Carlo simulation was performed to generate a distribution of outcome. Given the uncertainty in input parameters, this distribution reflected the potential range of total net benefit. Considering synthetic data and input factors obtained only through literature and assumptions, VR implementation could be a promising decision based on the results. This study's results would benefit decision-makers in construction companies about the costs and benefits of implementing VR and other researchers interested in this field.
Open AccessCost/benefit analysis model for implementing virtual reality in construction companies
Immersive technologies (ImT), like Virtual Reality (VR), have several potential applications in the construction industry. However, the absence of a cost-benefit analysis discourages construction decision-makers from implementing these technologies. In this study, we proposed a primary model for conducting a cost-benefit analysis for implementing virtual reality in construction companies. The cost and benefit factors were identified through a literature review and considered input variables for the model, and then using synthetic data, a Monte Carlo simulation was performed to generate a distribution of outcome. Given the uncertainty in input parameters, this distribution reflected the potential range of total net benefit. Considering synthetic data and input factors obtained only through literature and assumptions, VR implementation could be a promising decision based on the results. This study's results would benefit decision-makers in construction companies about the costs and benefits of implementing VR and other researchers interested in this field.
- Open Access
- 18 April 2023
- Published by MDPI AG in Infrastructures
- Vol. 8 (4) , 78
Quantitative Risk Assessment Model and Optimization in Infrastructure Fast-Track Construction Projects
The construction industry has extensively applied the fast-tracking approach to the demanding need for the fast delivery of infrastructure projects. However, the fast-track strategy might be threatened by distinctive risks or changes in risk characteristics that emerge when activities are overlapped (overlapping risks). This article proposes a risk assessment simulation model to quantify the economic impact of overlapping risks on fast-track infrastructure projects. The model uses Monte Carlo simulation and a proprietary engine solution for the optimization procedure. It quantifies the overlapping risk impacts in the project duration and cost that could originate in three different overlapping degrees and evaluates the optimal overlapping degree to reduce the impact of the overlapping risks. The model demonstration used a commercial renovation project. The results suggest that overlapping risks have a high potential impact on the total cost, although with a high probability of attaining the target duration. Eight top risks affected the total duration, cost, or both. The optimum overlapping to reduce the economic impact and achieve the target project duration combines different overlapping degrees. This study contribution is a model for fast-track projects considering overlapping risks, their impact characteristic as a distribution, and the potential relationship between these risks.
- 18 April 2023
- Published by MDPI AG in Infrastructures
- Vol. 8 (4) , 78
Open AccessQuantitative Risk Assessment Model and Optimization in Infrastructure Fast-Track Construction Projects
The construction industry has extensively applied the fast-tracking approach to the demanding need for the fast delivery of infrastructure projects. However, the fast-track strategy might be threatened by distinctive risks or changes in risk characteristics that emerge when activities are overlapped (overlapping risks). This article proposes a risk assessment simulation model to quantify the economic impact of overlapping risks on fast-track infrastructure projects. The model uses Monte Carlo simulation and a proprietary engine solution for the optimization procedure. It quantifies the overlapping risk impacts in the project duration and cost that could originate in three different overlapping degrees and evaluates the optimal overlapping degree to reduce the impact of the overlapping risks. The model demonstration used a commercial renovation project. The results suggest that overlapping risks have a high potential impact on the total cost, although with a high probability of attaining the target duration. Eight top risks affected the total duration, cost, or both. The optimum overlapping to reduce the economic impact and achieve the target project duration combines different overlapping degrees. This study contribution is a model for fast-track projects considering overlapping risks, their impact characteristic as a distribution, and the potential relationship between these risks.
- Open Access
Environmental Impacts of Rainwater Harvesting Systems in Urban Areas Applying Life Cycle Assessment—LCA
Climate change poses a series of challenges to water management to satisfy society’s current and future needs. Considering water an essential resource for life, this research is dedicated to comparing the environmental impacts caused by the conventional water supply system and Conventional Water Supply system complemented with rainwater harvesting, considering in the first one not only the components of the municipal public supply, but also the hydraulic components of the residences until the point of use. A life cycle assessment—LCA—was conducted for the two systems, considering them from the catchment to the point of use. This methodology quantifies environmental impacts throughout the product or process life cycle to obtain sustainable options, from raw material extraction to ultimate disposal. The results expose that the hybrid system represents an increase in environmental impacts. However, at a building scale, this increase was very small, and this can be seen as favorable to the hybrid system due to the benefit it brings. The seven percent reduction in water demand over the conventional system can represent significant relief in regions that already have water stress as a reality. This study has the potential to guide managers and designers of public water policies, providing data for a better decision-making process.
Open AccessEnvironmental Impacts of Rainwater Harvesting Systems in Urban Areas Applying Life Cycle Assessment—LCA
Climate change poses a series of challenges to water management to satisfy society’s current and future needs. Considering water an essential resource for life, this research is dedicated to comparing the environmental impacts caused by the conventional water supply system and Conventional Water Supply system complemented with rainwater harvesting, considering in the first one not only the components of the municipal public supply, but also the hydraulic components of the residences until the point of use. A life cycle assessment—LCA—was conducted for the two systems, considering them from the catchment to the point of use. This methodology quantifies environmental impacts throughout the product or process life cycle to obtain sustainable options, from raw material extraction to ultimate disposal. The results expose that the hybrid system represents an increase in environmental impacts. However, at a building scale, this increase was very small, and this can be seen as favorable to the hybrid system due to the benefit it brings. The seven percent reduction in water demand over the conventional system can represent significant relief in regions that already have water stress as a reality. This study has the potential to guide managers and designers of public water policies, providing data for a better decision-making process.