Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Wahbi Albasyouni has a total of 12 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Generative Artificial Intelligence and the Problem of Authorship and Personal Voice in Academic Writing

    by Sousen Elbouri, Wahbi Albasyouni

    Purpose: The growing integration of generative artificial intelligence (AI) into academic writing raises important questions about authorship, personal voice, and research integrity. This study examines how researchers perceive the impact of AI-assisted writing on authorial ambiguity, originality, and ethical responsibility in scholarly communication. Method: A quantitative cross-sectional survey was conducted using an online questionnaire distributed to individuals engaged in academic and professional writing. The instrument captured data on AI usage practices, perceptions of personal voice and authorship, and ethical attitudes toward AI-assisted writing. It also included classification tasks in which participants distinguished between human-written and AI-generated texts. Quantitative data were analysed using descriptive statistics, while open-ended responses were examined through thematic analysis. Findings: Results indicate widespread use of AI tools for language support, including paraphrasing, explaining complex concepts, and grammar correction. Most participants believed generative AI can replicate human writing styles, contributing to authorial ambiguity, especially when used extensively or without disclosure. Concerns were raised about originality, transparency, and the lack of institutional guidance. Additionally, participants struggled to reliably distinguish AI-generated text from human-authored writing. Research Limitations: The study relied on self-reported data from a relatively small sample, which may limit generalisability. Future research should use larger samples and longitudinal designs to track evolving perceptions. Originality: This study contributes to emerging research on AI in academic writing by empirically examining authorial ambiguity and its implications for scholarly integrity, highlighting the need for transparency and ethical guidance.

  • Optimizing Construction Project Scheduling for Improved Effectiveness and Reduced Labor Costs

    by Berlant Arab, Wahbi Albasyouni, Mohamed Elsaid, Yasmeen Essawy, Khaled Nassar


  • Open Access

    Assessing the impact of infection rate on the productivity of re-sources in the construction industry: lessons from covid-19 pandemic

    by Mohamed Elsaid, Wahbi Albasyouni

    Following the declaration of the coronavirus 2019 (COVID-19) outbreak as a pandemic, numerous countries decided to implement complete lockdowns in response to the global surge in cases. This decision significantly restricted people's movement and compelled businesses to shut down entirely. Most countries faced economic crises, and many firms laid off some of their employees. One of the economy’s significant growth drivers is the construction industry, which was also forced to a complete shutdown. Not only were they forced to shut down, but they also had to terminate some of the contracts for their upcoming projects. Many construction companies had to postpone their project until further notice, and then they decided to reduce the number of workers to diminish the probability of being infected by the virus. Consequently, it became essential to assess the pandemic's impact and develop an optimal strategy to maintain project continuity in the face of similar future pandemics. The aim of this study was to investigate and optimize the productivity of the construction crews to deal with any pandemic or similar unexpected circumstances. The study investigated the productivity related to different scenarios and determined what is the best scenario that will lead to the continuity of the project. These various scenarios were examined and compared through the use of the “AnyLogic” software program. The results reached demonstrated the impact of pandemics on the production rate of construction projects. The study demonstrated that employing only 60% of the required crew led to an additional 64 days of delay in the case study analyzed, whereas utilizing the full crew capacity allowed the project to be completed within just 100 days.

  • Open Access

    Key Challenges and Opportunities to Improve Risk Assessments in the Construction Industry

    by Wahbi Albasyouni, John Kamara, Oliver Heidrich

    Risk management is crucial for the effective delivery of construction projects. While extensive research around the importance of risk management exists globally, limited studies have examined the effectiveness of risk assessment in general and in Egyptian construction projects in particular. Hence, this paper fills this gap by exploring current risk assessment practices through semi-structured interviews with 15 industry experts from various construction firms in Egypt. A qualitative methodology was adopted, and thematic analysis was used to identify key challenges and opportunities for improvement. The findings indicated that Egyptian firms tend to rely heavily on personal judgment rather than implementing a structured process, whereas multinational companies adopt more formalized approaches. The absence of systematic documentation on project failures further weakens the effectiveness of current risk assessment practices. Unlike previous studies that primarily used quantitative methods, this research employs a qualitative approach that provides direct insights from the industry and offers a deeper understanding of actual practices. Given the differences in risk assessment approaches between local and international companies, this study suggests that cultural and operational factors must be considered when developing structured risk management frameworks. Similar patterns have been observed in other regions, where multinational firms operating in markets such as the Middle East, Asia, and Latin America tend to implement standardized risk management protocols, while local companies often face challenges in formalizing these practices. The findings offer valuable insights for both national and multinational companies operating in the Egyptian construction sector that aim to enhance project risk management.


  • Open Access

    Investigating the Causes of Variation Orders in Egypt Perspective of Medium and Small-Sized Companies

    by Wahbi Albasyouni, Mohamed Ashraf

    Introduction: Variation order became one of the major issues that is presented in construction projects. The nature of work in the construction industry is complex and difficult. Thus, variation order is expected to occur in every project due to its nature. The purpose of the study was to investigate the causes of variation order in construction projects in Egypt according to the perspective of professional parties working for medium and small sized construction companies. The main method used for data collection was a questionnaire survey with experts working in the Egyptian construction industry. 62 participants from 18 construction companies were invited to take part of the study, 51 of them accepted the invitation. The findings showed the top ranked causes of variation order according to small and medium sized construction companies were poor communication, omissions in the design, financial limitations of the owner, additional work requested by the client, and contractor’s desire to gain more profits. Thus, the proper understanding of the causes of the problem can be helpful towards establishing a suitable criterion for reducing variation orders in construction projects in Egypt. The contribution of this study lies in the fact that only a very limited number of research explored the perspective of medium and small sized construction companies in Egypt. The study can be useful for other countries with similar working conditions and still suffering from the adverse impact of variation order.


  • Open Access

    Proposing the Use of Failure Mode and Effect Analysis (FMEA) as Risk Assessment Tool in Construction

    by Wahbi Albasyouni, Ibrahim Abotaleb, Khaled Nassar

    International Journal of Innovative Technology and Exploring Engineering (IJITEE) covers topics in the field of Computer Science & Engineering, Information Technology, Electronics & Communication, Electrical and Electronics, Electronics and Telecommunication, Civil Engineering, Mechanical Engineering, Textile Engineering and all interdisciplinary streams of Engineering Sciences.


  • Open Access

    Investigating the Optimum Tilt Angle of PV Modules in Al-Sherouk City, Cairo

    by Mohamed Atef, Wahbi Albasyouni

    Energy is a crucial element that can ensure the quality of life for citizens. The consumption of energy by citizens is increasing rapidly, and future existence also became reliant on the sufficient availability of energy and its sources. Nevertheless, energy consumption is becoming a major concern due to the increase in usage rates and the lack of sufficient renewable sources of energy. Nowadays, the technological advancement that lies in the use of Photovoltaic Panels can help in generating energy and take the advantage of the sun especially in Egypt. The usage of PV’s relies on multiple factors that can ensure the highest potential generation of energy. Therefore, several studies investigated these factors including the optimum titling angle that can be different according to the location and orientation of the panel. Modifying the titling angle can play a significant role in generating high rates of power depending on the measurements and calculations. The aim of this paper was to investigate the efficient titling angle that can be used for PV panels that are installed in Al-Sherouk City in Egypt. The methodology involved the implementation of an experimental investigation that is based on position 2 similar PV panels to estimate the power generation over a period of 2 days from 9 am to 4 pm. The findings have shown that the theoretical and experimental results were similar, and the optimum tilting angle was determined to range between 54.7 degrees and 8.16 degrees. The study demonstrated the differences between an adjusted and a fixed angle, and the variable titled angle can generate more energy than the fixed one. This paper contributes to the body of knowledge by presenting the significance of a variable tilting angle to generate more power than relying on a fixed angle as demonstrated by many previous studies.

  • Open Access

    Identifying the Causes of Delay in the Building Sector in Egypt: A Case Study of Small and Medium-Sized Companies

    by Wahbi Albasyouni, Abdallah Elbassal

    Delay in the construction industry is known to be a significant issue as indicated by many studies in the past few years. The construction sector in Egypt is not an exception as a wide range of projects are suffering from time overrun. the presence of time overrun in the project is the root of other problems such as cost overrun and poor quality. Hence, one of the simplest ways of dealing with delays is by identifying the causes and sources of delays in construction projects in Egypt. Therefore, this paper discussed the causes of delay in the building sector in Egypt according to the perspective of professional parties working in different small and medium-sized companies. The main method of data collection was a questionnaire survey with small and medium-sized companies in Egypt. The participants had more than 5 years of experience in the Egyptian construction sector. The financial problems faced by owners were considered significant by two different companies which indicates that this factor is usually the reason for delays in projects in Egypt. Ineffective planning and scheduling have also proven to be important in the procedure of preventing delays as it was mentioned by all experts involved in the data collection. This study has shown that the perspective of experts working in different companies may not be the same regarding the causes of delays in the construction sector. The adequate understanding of the causes aids in proposing effective strategies that can reduce the occurrence and impact of delays.