Changiz Ahbab
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Changiz Ahbab has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Sahand Daneshvar
Faculty of Engineering, Near East University
1 shared publication - Sepanta Naimi
Department of Civil Engineering, Altinbas University, 34217 Istanbul, Türkiye
1 shared publication - Suhib O. A. Amro
Department of Civil Engineering, Altinbas University, 34217 Istanbul, Türkiye
1 shared publication - Tahir Çelik
Civil Engineering Department, Cyprus International University, Nicosia 99258, Cyprus
1 shared publication
Latest Publications
- Open Access
- 12 August 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (16) , 8273
AI-Enabled Generative Design Digital Twin Framework for Net-Zero Building Optimization Across European Climate Zones
The construction sector accounts for around 40% of global energy usage and surpasses 36% of carbon emissions, highlighting the urgent need for improved renovation strategies. This research presents an AI-enabled generative design optimization framework that facilitates concurrent multi-objective optimization of architectural design, structural efficiency, and energy performance. The framework employs a 20-variable parametric design space and integrates a hybrid NSGA-III, a reference-point-based many-objective evolutionary algorithm with particle swarm optimization. Machine-learning surrogate models accelerate physics-based simulations by 500–850 times while maintaining prediction accuracy above 95%. The framework is validated through twelve renovation case studies comprising eleven residential and one office building spanning seven European countries, sourced from IEA SHC Task 37 and Passivhaus Institut databases, and calibrated to ASHRAE Guideline 14 standards (CVRMSE ≤ 18.6% across all buildings). The results evidence average reductions of 84.7% in operational energy consumption and enhancements of 20.1% in material efficiency, while consistently attaining a net-zero annual energy balance. Climate conditions significantly influence optimal insulation requirements, with a 37% difference between continental and Mediterranean regions. This study presents a scalable and computationally efficient method for AI-driven renovation design, overcoming the constraints of sequential approaches and facilitating substantial decarbonization of the built environment.
- 12 August 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (16) , 8273
Open AccessAI-Enabled Generative Design Digital Twin Framework for Net-Zero Building Optimization Across European Climate Zones
The construction sector accounts for around 40% of global energy usage and surpasses 36% of carbon emissions, highlighting the urgent need for improved renovation strategies. This research presents an AI-enabled generative design optimization framework that facilitates concurrent multi-objective optimization of architectural design, structural efficiency, and energy performance. The framework employs a 20-variable parametric design space and integrates a hybrid NSGA-III, a reference-point-based many-objective evolutionary algorithm with particle swarm optimization. Machine-learning surrogate models accelerate physics-based simulations by 500–850 times while maintaining prediction accuracy above 95%. The framework is validated through twelve renovation case studies comprising eleven residential and one office building spanning seven European countries, sourced from IEA SHC Task 37 and Passivhaus Institut databases, and calibrated to ASHRAE Guideline 14 standards (CVRMSE ≤ 18.6% across all buildings). The results evidence average reductions of 84.7% in operational energy consumption and enhancements of 20.1% in material efficiency, while consistently attaining a net-zero annual energy balance. Climate conditions significantly influence optimal insulation requirements, with a 37% difference between continental and Mediterranean regions. This study presents a scalable and computationally efficient method for AI-driven renovation design, overcoming the constraints of sequential approaches and facilitating substantial decarbonization of the built environment.
- 24 December 2025
- Published by Raw Data Library
An Investigation on Time and Cost Overrun in Construction Projects
The success of construction projects is highly dependent on meeting the aim of project and objectives within the specified time and budget. Management plays a big role in construction projects. Most important problems that management faces in the projects are methods of execution, management of workers, equipment, scheduling and money. Delay and cost overrun are two of the important defects in construction industry. These failures can lead to various types of negative affections like disputes between contractor and client, decrease quality of work and health and safety accidents. Therefore, there is a high necessity for further investigation on delay and cost overrun factors as well as quality and health & safety and suggesting right actions to minimize these kinds of defects.
- 24 December 2025
- Published by Raw Data Library
An Investigation on Time and Cost Overrun in Construction Projects
The success of construction projects is highly dependent on meeting the aim of project and objectives within the specified time and budget. Management plays a big role in construction projects. Most important problems that management faces in the projects are methods of execution, management of workers, equipment, scheduling and money. Delay and cost overrun are two of the important defects in construction industry. These failures can lead to various types of negative affections like disputes between contractor and client, decrease quality of work and health and safety accidents. Therefore, there is a high necessity for further investigation on delay and cost overrun factors as well as quality and health & safety and suggesting right actions to minimize these kinds of defects.
- 1 March 2019
- Published by Teknik Dergi in Teknik Dergi
- Vol. 30 (2) , 8937-8959
Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis
Tr en Upon the completion of national road projects, their cost and time deviations are often reported. These deviations from the projected values are a result of complications in the time and cost management of such projects. Controlling the cost and time overrun of projects is important for successful implementation and efficient project management. However, few studies have attempted to measure the project cost and time management efficiency in civil engineering. Thus, this issue requires further investigation. In this study, large road projects that had poor cost and time management were selected. The chosen projects were configured as Decision Making Units (DMUs) in a Data Envelopment Analysis (DEA). DEA is a non-parametric modern mathematical tool for measuring relative managerial performance and determining efficient DMUs. A list containing the causes of cost and time deviations and the percentage deviation for each DMU was prepared. The cost and time management efficiency of the DMUs was calculated using DEA, and the resulting values were ordered according to importance. It is believed that this process will contribute to better cost and time management. Upon the completion of national road projects, their cost and time deviations are often reported. These deviations from the projected values are a result of complications in the time and cost management of such projects. Controlling the cost and time overrun of projects is important for successful implementation and efficient project management. However, few studies have attempted to measure the project cost and time management efficiency in civil engineering. Thus, this issue requires further investigation. In this study, large road projects that had poor cost and time management were selected. The chosen projects were configured as Decision Making Units (DMUs) in a Data Envelopment Analysis (DEA). DEA is a non-parametric modern mathematical tool for measuring relative managerial performance and determining efficient DMUs. A list containing the causes of cost and time deviations and the percentage deviation for each DMU was prepared. The cost and time management efficiency of the DMUs was calculated using DEA, and the resulting values were ordered according to importance. It is believed that this process will contribute to better cost and time management.
- 1 March 2019
- Published by Teknik Dergi in Teknik Dergi
- Vol. 30 (2) , 8937-8959
Cost and Time Management Efficiency Assessment for Large Road Projects Using Data Envelopment Analysis
Tr en Upon the completion of national road projects, their cost and time deviations are often reported. These deviations from the projected values are a result of complications in the time and cost management of such projects. Controlling the cost and time overrun of projects is important for successful implementation and efficient project management. However, few studies have attempted to measure the project cost and time management efficiency in civil engineering. Thus, this issue requires further investigation. In this study, large road projects that had poor cost and time management were selected. The chosen projects were configured as Decision Making Units (DMUs) in a Data Envelopment Analysis (DEA). DEA is a non-parametric modern mathematical tool for measuring relative managerial performance and determining efficient DMUs. A list containing the causes of cost and time deviations and the percentage deviation for each DMU was prepared. The cost and time management efficiency of the DMUs was calculated using DEA, and the resulting values were ordered according to importance. It is believed that this process will contribute to better cost and time management. Upon the completion of national road projects, their cost and time deviations are often reported. These deviations from the projected values are a result of complications in the time and cost management of such projects. Controlling the cost and time overrun of projects is important for successful implementation and efficient project management. However, few studies have attempted to measure the project cost and time management efficiency in civil engineering. Thus, this issue requires further investigation. In this study, large road projects that had poor cost and time management were selected. The chosen projects were configured as Decision Making Units (DMUs) in a Data Envelopment Analysis (DEA). DEA is a non-parametric modern mathematical tool for measuring relative managerial performance and determining efficient DMUs. A list containing the causes of cost and time deviations and the percentage deviation for each DMU was prepared. The cost and time management efficiency of the DMUs was calculated using DEA, and the resulting values were ordered according to importance. It is believed that this process will contribute to better cost and time management.