Jesús Ortega
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jesús Ortega has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Luis Fernando Alarcon
Pontificia Universidad Católica de Chile
3 shared publications - Harrison Mesa
School of Civil Construction, Faculty of Engineering, Pontificia Universidad Católica de Chile, Santiago 7820436, Chile
2 shared publications - Alejandro Vásquez-Hernández
PhD Student Department of Construction Engineering and Management Pontificia Universidad Católica de Chile Santiago Chile
1 shared publication - Beda Barkokebas
Pontificia Universidad Católica de Chile
1 shared publication - Francisco Chitty Gozalo
FINFROCK Industries, 2400 Apopka Blvd, Apopka, FL 32703, USA
1 shared publication - Gerardo Becerra1 shared publication
Latest Publications
- Open Access
Integrated Maturity Assessment of Manufacturing, Logistics, and Assembly in Off-Site Construction
Off-site construction (OSC) is recognized for its potential to improve productivity, quality, safety, and sustainability. However, these benefits are often not fully realized because manufacturing principles and their effects on subsequent stages remain insufficiently understood and managed as an integrated production system. In addition, OSC complexity creates the need for structured approaches that support implementation and progressive improvement. Existing approaches remain limited in their ability to jointly assess these interdependent processes, clearly define maturity progression, and provide an integrated basis for improvement. This study addresses this gap by developing an integrated maturity assessment for manufacturing, logistics, and assembly (MLa) in OSC. The research followed five-stages: comprehensive literature review, expert-based triangulation, AHP-based weighting, maturity-level conceptualization, and feasibility assessment through a case study. The proposed assessment comprises 7 variables and 56 indicators. The results show that workplace configuration management and process orientation are foundational dimensions, while capacities, management practices, and management capabilities enable MLa-operationalization, and sustainability and CITs applications represent advanced maturity conditions. The weighting structure was established using the Chilean AEC industry as the reference context, and the case study provided preliminary evidence of feasibility and applicability of the assessment in diagnosing maturity conditions and identifying improvement paths for integrated MLa-operations in a real OSC company.
Open AccessIntegrated Maturity Assessment of Manufacturing, Logistics, and Assembly in Off-Site Construction
Off-site construction (OSC) is recognized for its potential to improve productivity, quality, safety, and sustainability. However, these benefits are often not fully realized because manufacturing principles and their effects on subsequent stages remain insufficiently understood and managed as an integrated production system. In addition, OSC complexity creates the need for structured approaches that support implementation and progressive improvement. Existing approaches remain limited in their ability to jointly assess these interdependent processes, clearly define maturity progression, and provide an integrated basis for improvement. This study addresses this gap by developing an integrated maturity assessment for manufacturing, logistics, and assembly (MLa) in OSC. The research followed five-stages: comprehensive literature review, expert-based triangulation, AHP-based weighting, maturity-level conceptualization, and feasibility assessment through a case study. The proposed assessment comprises 7 variables and 56 indicators. The results show that workplace configuration management and process orientation are foundational dimensions, while capacities, management practices, and management capabilities enable MLa-operationalization, and sustainability and CITs applications represent advanced maturity conditions. The weighting structure was established using the Chilean AEC industry as the reference context, and the case study provided preliminary evidence of feasibility and applicability of the assessment in diagnosing maturity conditions and identifying improvement paths for integrated MLa-operations in a real OSC company.
- Open Access
- 22 June 2026
- Published by IGLC
- p. 798-810
Aligning lean project delivery with industrilized construction: a project-level, requirements-based analysis
Existing industrialized construction (IC) and lean construction research have mainly addressed IC adoption at organisational and industry levels, identifying barriers, mapping lean techniques, and proposing strategic frameworks, while offering limited insight into the project-level requirements of industrialized construction projects (ICPs) …
- 22 June 2026
- Published by IGLC
- p. 798-810
Open AccessAligning lean project delivery with industrilized construction: a project-level, requirements-based analysis
Existing industrialized construction (IC) and lean construction research have mainly addressed IC adoption at organisational and industry levels, identifying barriers, mapping lean techniques, and proposing strategic frameworks, while offering limited insight into the project-level requirements of industrialized construction projects (ICPs) …
- Open Access
- 22 June 2026
- Published by IGLC
- p. 169-180
A lean-BIM operational traceable model for 5D cost-schedule integration in structural works
The construction industry faces persistent challenges in cost control, schedule reliability, and data consistency, particularly during the structural phase of high-rise buildings. Although Building Information Modeling (BIM) offers the potential to integrate quantities, costs, and schedules, its operational application remains …
- 22 June 2026
- Published by IGLC
- p. 169-180
Open AccessA lean-BIM operational traceable model for 5D cost-schedule integration in structural works
The construction industry faces persistent challenges in cost control, schedule reliability, and data consistency, particularly during the structural phase of high-rise buildings. Although Building Information Modeling (BIM) offers the potential to integrate quantities, costs, and schedules, its operational application remains …