Avraam Kartalidis
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Avraam Kartalidis has a total of 20 co-authors. Here are the top co-authors by number of shared publications:
- Dimitris Al Katsaprakakis
Department of Mechanical Engineering, Hellenic Mediterranean University, 71410 Heraklion, Greece
3 shared publications - Efi Giannopoulou
Minoan Energy Community, Kolokotroni & Constantinou Psarakis, 703 00 Arkalochori, Greece
3 shared publications - Eirini Dakanali
Aeolian Land S.A., 70300 Arkalochori, Greece
3 shared publications - George Katzagiannakis
Minoa Pediadas Municipality, 70300 Arkalochori, Greece
3 shared publications - George Stavrakakis
Department of Mechanical Engineering, Hellenic Mediterranean University, 71410 Heraklion, Greece
3 shared publications - George Zidianakis
Power Plant Synthesis Laboratory, Department of Mechanical Engineering, Hellenic Mediterranean University, Estavromenos, 714 10 Heraklion, Greece
3 shared publications
Latest Publications
- Open Access
- 30 June 2026
- Published by MDPI AG in Smart Cities
- Vol. 9 (7) , 111
A Rolling-Horizon Model Predictive Control Energy Management System for Shaping the Ports of the Future
Smart-port decarbonisation requires operations-research decision support under day-ahead uncertainty. We present a rolling-horizon Model Predictive Control Energy Management System, formulated as a Mixed-Integer Linear Program with five forecast streams, and benchmark it against a deterministic rule-based controller on an identical configuration. A full-year proof-of-concept at the Port of Ancona (8760 hourly steps over the 2024 Italian Day-Ahead Market, 6.5 MWp PV, 1.0 MWh BESS) combines realised 2024 market, photovoltaic and auxiliary-demand series with a post-AFIR projected cold-ironing demand—the dominant load—and is therefore an operational proof-of-concept rather than a fully metered baseline. The principal MPC outcome is structural: anticipatory dispatch raises the mean BESS state of charge from 13.6% to 46.0% and cuts residence at the minimum SoC from 81% to 6% of hours. The forecasting layer attains sub-7% sMAPE on cold-ironing-loaded demand and 9–18% on the remaining streams (seasonal MASE24 ≤ 0.74 on demand and price streams). At the relay-constrained 0.08 C pilot, the realised savings is 0.44% (€14,463 yr−1; 95% moving-block bootstrap CI [€12,842, €15,742]); benchmarked against an enhanced rule-based controller that is itself permitted price-threshold grid charging, the residual value of predictive optimisation is €5652 yr−1 (0.17%), with the remainder of the gap being the value of enabling grid charging. A C-rate sweep shows the savings doubling to 0.93% at 0.5 C, and a direct 20 MWh/±10 MW simulation yields a €0.57 M yr−1 gross arbitrage savings whose net value, after a realistic battery-degradation penalty, is substantially smaller. Controller-level operational CO2 rises marginally (+6.2 t, +0.13%), an effect distinct from—and dwarfed by—the system-level cold-ironing decarbonisation. The framework is reproducible in open-source Python (PuLP/HiGHS) from the actual data and is portable to other single-node smart city energy hubs.
- 30 June 2026
- Published by MDPI AG in Smart Cities
- Vol. 9 (7) , 111
Open AccessA Rolling-Horizon Model Predictive Control Energy Management System for Shaping the Ports of the Future
Smart-port decarbonisation requires operations-research decision support under day-ahead uncertainty. We present a rolling-horizon Model Predictive Control Energy Management System, formulated as a Mixed-Integer Linear Program with five forecast streams, and benchmark it against a deterministic rule-based controller on an identical configuration. A full-year proof-of-concept at the Port of Ancona (8760 hourly steps over the 2024 Italian Day-Ahead Market, 6.5 MWp PV, 1.0 MWh BESS) combines realised 2024 market, photovoltaic and auxiliary-demand series with a post-AFIR projected cold-ironing demand—the dominant load—and is therefore an operational proof-of-concept rather than a fully metered baseline. The principal MPC outcome is structural: anticipatory dispatch raises the mean BESS state of charge from 13.6% to 46.0% and cuts residence at the minimum SoC from 81% to 6% of hours. The forecasting layer attains sub-7% sMAPE on cold-ironing-loaded demand and 9–18% on the remaining streams (seasonal MASE24 ≤ 0.74 on demand and price streams). At the relay-constrained 0.08 C pilot, the realised savings is 0.44% (€14,463 yr−1; 95% moving-block bootstrap CI [€12,842, €15,742]); benchmarked against an enhanced rule-based controller that is itself permitted price-threshold grid charging, the residual value of predictive optimisation is €5652 yr−1 (0.17%), with the remainder of the gap being the value of enabling grid charging. A C-rate sweep shows the savings doubling to 0.93% at 0.5 C, and a direct 20 MWh/±10 MW simulation yields a €0.57 M yr−1 gross arbitrage savings whose net value, after a realistic battery-degradation penalty, is substantially smaller. Controller-level operational CO2 rises marginally (+6.2 t, +0.13%), an effect distinct from—and dwarfed by—the system-level cold-ironing decarbonisation. The framework is reproducible in open-source Python (PuLP/HiGHS) from the actual data and is portable to other single-node smart city energy hubs.
- Open Access
Enhancing Port Energy Autonomy Through Hybrid Renewables and Optimized Energy Storage Management
Hybrid renewable energy systems (HRESs) are being incorporated and evaluated within seaports to realize efficiencies, reduce dependence on grid electricity, and reduce operating costs. The paper adopts a genetic algorithm (GA)-based optimization framework to assess four energy management scenarios that embed wind turbines (WTs), photovoltaic energy (PV), an energy storage system (ESS), and an energy management system (EMS). The scenarios were developed based on different levels of renewable energy integration, energy storage utilization, and grid dependency to optimize cost and sustainability while reflecting the actual port energy scenario as the base case. Integrating HRES, ESS, and EMS reduced the port’s levelized cost of energy (LCOE) by up to 54%, with the most optimized system (Scenario 3) achieving a 53% reduction while enhancing energy stability, minimizing grid reliance, and maximizing renewable energy utilization. The findings show that the HRES configuration provides better cost, sustainability, and resiliency than the conventional grid-tied system. The unique proposed EMS takes it a step further, optimizing not just the energy flow but also the cost, making the overall system more efficient—and less costly—for the user. ESS complements energy storage and keeps it functional and reliable while EMS makes it completely functional by devising ways to reduce costs and enhance efficiency. The study presents the technical and economic viability of HRES as an economic and operational smart port infrastructure through its cost-effective integration of renewable energy sources. The results reinforce the move from conventional to sustainable autonomous port energy systems and lay the groundwork for forthcoming studies of DR-enhanced port energy management schemes. While prior studies have explored renewable energy integration within ports, many lack a unified, empirically validated framework that considers HRES, ESS, and EMS within real-world port operations. This research addresses this gap by developing an optimization-driven approach that assesses the techno-economic feasibility of port energy systems while incorporating real-time data and advanced control strategies. This study was conducted to enhance port infrastructure and evaluate the impact of HRES, ESS, and EMS on port sustainability and autonomy. By bridging the gap between theoretical modeling and practical implementation, it offers a scalable and adaptable solution for improving cost efficiency and energy resilience in port operations.
Open AccessEnhancing Port Energy Autonomy Through Hybrid Renewables and Optimized Energy Storage Management
Hybrid renewable energy systems (HRESs) are being incorporated and evaluated within seaports to realize efficiencies, reduce dependence on grid electricity, and reduce operating costs. The paper adopts a genetic algorithm (GA)-based optimization framework to assess four energy management scenarios that embed wind turbines (WTs), photovoltaic energy (PV), an energy storage system (ESS), and an energy management system (EMS). The scenarios were developed based on different levels of renewable energy integration, energy storage utilization, and grid dependency to optimize cost and sustainability while reflecting the actual port energy scenario as the base case. Integrating HRES, ESS, and EMS reduced the port’s levelized cost of energy (LCOE) by up to 54%, with the most optimized system (Scenario 3) achieving a 53% reduction while enhancing energy stability, minimizing grid reliance, and maximizing renewable energy utilization. The findings show that the HRES configuration provides better cost, sustainability, and resiliency than the conventional grid-tied system. The unique proposed EMS takes it a step further, optimizing not just the energy flow but also the cost, making the overall system more efficient—and less costly—for the user. ESS complements energy storage and keeps it functional and reliable while EMS makes it completely functional by devising ways to reduce costs and enhance efficiency. The study presents the technical and economic viability of HRES as an economic and operational smart port infrastructure through its cost-effective integration of renewable energy sources. The results reinforce the move from conventional to sustainable autonomous port energy systems and lay the groundwork for forthcoming studies of DR-enhanced port energy management schemes. While prior studies have explored renewable energy integration within ports, many lack a unified, empirically validated framework that considers HRES, ESS, and EMS within real-world port operations. This research addresses this gap by developing an optimization-driven approach that assesses the techno-economic feasibility of port energy systems while incorporating real-time data and advanced control strategies. This study was conducted to enhance port infrastructure and evaluate the impact of HRES, ESS, and EMS on port sustainability and autonomy. By bridging the gap between theoretical modeling and practical implementation, it offers a scalable and adaptable solution for improving cost efficiency and energy resilience in port operations.
- Open Access
- 13 February 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (4) , 1572
A Review of the Energy Storage Systems of Non-Interconnected European Islands
The ongoing energy transition has caused a paradigm shift in the architecture of power systems, increasing their sustainability with the installation of renewable energy sources (RES). In most cases, the efficient utilization of renewable energy requires the employment of energy storage systems (ESSs), such as batteries and hydro-pumped storage systems. The need for ESS becomes more apparent when it comes to non-interconnected power systems, where the incorporation of stochastic renewables, such as photovoltaics (PV) systems, may more frequently reduce certain power quality indicators or lead to curtailments. The purpose of this review paper is to present the predominant core technologies related to ESSs, along with their technical and life cycle analysis and the range of ancillary services that they can provide to non-interconnected power systems. Also, it aims to provide a detailed description of existing installations, or combinations of installations, in non-interconnected European islands. Therefore, it provides an overview and maps the current status of storage solutions that enhance the sustainable environmentally friendly operation of autonomous systems.
- 13 February 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (4) , 1572
Open AccessA Review of the Energy Storage Systems of Non-Interconnected European Islands
The ongoing energy transition has caused a paradigm shift in the architecture of power systems, increasing their sustainability with the installation of renewable energy sources (RES). In most cases, the efficient utilization of renewable energy requires the employment of energy storage systems (ESSs), such as batteries and hydro-pumped storage systems. The need for ESS becomes more apparent when it comes to non-interconnected power systems, where the incorporation of stochastic renewables, such as photovoltaics (PV) systems, may more frequently reduce certain power quality indicators or lead to curtailments. The purpose of this review paper is to present the predominant core technologies related to ESSs, along with their technical and life cycle analysis and the range of ancillary services that they can provide to non-interconnected power systems. Also, it aims to provide a detailed description of existing installations, or combinations of installations, in non-interconnected European islands. Therefore, it provides an overview and maps the current status of storage solutions that enhance the sustainable environmentally friendly operation of autonomous systems.
- Open Access
Rational Use of Energy in Sport Centers to Achieving Net Zero—The SAVE Project (Part B: Indoor Sports Hall)
Sports centers are significant energy consumers. This article outlines the engineering design for a comprehensive energy performance upgrade of the indoor sports hall in Arkalochori, Greece, and presents the projected results. The indoor sports hall constitutes a major sport facility on the mainland of Crete, hosting a broad cluster of sport municipal activities and the official basketball games of the local team in the 2nd national category. Having been constructed in the mid-1990s, the facility exhibits very low thermal performance, with considerably high U-factors for all constructive elements (from 4 to 5 W/m2∙K), still use of diesel oil for indoor space heating and domestic heat water production, and ineffective old lamps and luminaries covering the lighting needs of the facility. The energy performance upgrade of the indoor sports hall was studied, and the following passive and active measures were considered: Opaque-surfaces’ thermal insulation and openings’ replacement, stone wool panels, installation of heat pumps for indoor space conditioning, removal of diesel oil for any end use, production of domestic hot water from a novel solar-combi system, upgrade of lighting equipment, installation of solar tubes on the main sports hall roof for natural lighting as well as of a photovoltaic system for covering the remaining electricity consumption. With the proposed interventions, the studied building becomes a zero-energy facility. The payback period of the investment was calculated at 26 years on the basis of the avoided energy cost. This work was funded by the “NESOI” Horizon 2020 project and received the public award “Islands Gamechanger” competition of the NESOI project and the Clean Energy for EU Islands initiative.
Open AccessRational Use of Energy in Sport Centers to Achieving Net Zero—The SAVE Project (Part B: Indoor Sports Hall)
Sports centers are significant energy consumers. This article outlines the engineering design for a comprehensive energy performance upgrade of the indoor sports hall in Arkalochori, Greece, and presents the projected results. The indoor sports hall constitutes a major sport facility on the mainland of Crete, hosting a broad cluster of sport municipal activities and the official basketball games of the local team in the 2nd national category. Having been constructed in the mid-1990s, the facility exhibits very low thermal performance, with considerably high U-factors for all constructive elements (from 4 to 5 W/m2∙K), still use of diesel oil for indoor space heating and domestic heat water production, and ineffective old lamps and luminaries covering the lighting needs of the facility. The energy performance upgrade of the indoor sports hall was studied, and the following passive and active measures were considered: Opaque-surfaces’ thermal insulation and openings’ replacement, stone wool panels, installation of heat pumps for indoor space conditioning, removal of diesel oil for any end use, production of domestic hot water from a novel solar-combi system, upgrade of lighting equipment, installation of solar tubes on the main sports hall roof for natural lighting as well as of a photovoltaic system for covering the remaining electricity consumption. With the proposed interventions, the studied building becomes a zero-energy facility. The payback period of the investment was calculated at 26 years on the basis of the avoided energy cost. This work was funded by the “NESOI” Horizon 2020 project and received the public award “Islands Gamechanger” competition of the NESOI project and the Clean Energy for EU Islands initiative.
- Open Access
- 16 August 2023
- Published by MDPI AG in Preprints.org
Rational Use of Energy in Sport Centers to Achieving Net Zero: The SAVE Project (Part B: Indoor Sport Hall)
Sport centers are significant energy consumers. This article outlines the engineering design for a comprehensive energy performance upgrade of the indoor sport hall in Arkalochori, Greece, and presents the projected results. The indoor sport hall constitutes a major sport facility in the mainland of Crete, hosting a broad cluster of sport municipal activities and the official basketball games of the local team in the 2nd national category. Having being constructed in the mid ‘90s, the facility exhibits very low thermal performance, with considerably high U-factors for all constructive elements (from 4 to 5 W/m2∙K), still use of diesel oil for indoor space heating and domestic heat water production and ineffective, old lamps and luminaries covering the lighting needs of the facility. The energy performance upgrade of the indoor sport hall was holistically approached, through all possibly applicable passive and active measures: insulation of opaque surfaces and replacement of openings, installation of new stone wool panels, installation of heat pumps for indoor space conditioning, elimination of diesel oil for any final energy use, installation of a solar-combi system for domestic hot water production, upgrade of all indoor and outdoor lighting equipment, installation of solar tubes on the main sport hall roof for natural lighting and installation of a photovoltaic plant on the same roof for the compensation of the remaining electricity consumption. With the proposed measures, the indoor sport hall is upgraded to zero energy facility. The payback period of the investment was calculated at 26 years, on basis of the avoided energy resources procurement cost. This work has been funded by the Horizon 2020 project with the acronym “NESOI” and was awarded with the public award of the “Islands Gamechanger” competition of the NESOI project and the Clean Energy for EU Islands initiative.
- 16 August 2023
- Published by MDPI AG in Preprints.org
Open AccessRational Use of Energy in Sport Centers to Achieving Net Zero: The SAVE Project (Part B: Indoor Sport Hall)
Sport centers are significant energy consumers. This article outlines the engineering design for a comprehensive energy performance upgrade of the indoor sport hall in Arkalochori, Greece, and presents the projected results. The indoor sport hall constitutes a major sport facility in the mainland of Crete, hosting a broad cluster of sport municipal activities and the official basketball games of the local team in the 2nd national category. Having being constructed in the mid ‘90s, the facility exhibits very low thermal performance, with considerably high U-factors for all constructive elements (from 4 to 5 W/m2∙K), still use of diesel oil for indoor space heating and domestic heat water production and ineffective, old lamps and luminaries covering the lighting needs of the facility. The energy performance upgrade of the indoor sport hall was holistically approached, through all possibly applicable passive and active measures: insulation of opaque surfaces and replacement of openings, installation of new stone wool panels, installation of heat pumps for indoor space conditioning, elimination of diesel oil for any final energy use, installation of a solar-combi system for domestic hot water production, upgrade of all indoor and outdoor lighting equipment, installation of solar tubes on the main sport hall roof for natural lighting and installation of a photovoltaic plant on the same roof for the compensation of the remaining electricity consumption. With the proposed measures, the indoor sport hall is upgraded to zero energy facility. The payback period of the investment was calculated at 26 years, on basis of the avoided energy resources procurement cost. This work has been funded by the Horizon 2020 project with the acronym “NESOI” and was awarded with the public award of the “Islands Gamechanger” competition of the NESOI project and the Clean Energy for EU Islands initiative.
- Open Access
Rational Use of Energy in Sports Centres to Achieve Net Zero: The SAVE Project (Part A)
Sports centres constitute major energy consumers. This article presents the proposed energy performance upgrade process and the achieved results for the municipal sports centre in Arkalochori, Greece. The facility consists of a swimming pool centre, an outdoor 8 × 8 football court, and two tennis and basketball courts. It operates with considerably high energy consumption due to the lack of any measure towards its energy efficiency improvement since its initial construction in 2002. Due to the significantly high heating cost, the swimming pool centre remains operative only during the summer period. The energy performance upgrade of the facility was holistically approached through all possibly applicable passive and active measures: insulation of opaque surfaces and replacement of openings, construction of a new, bioclimatic enclosure for the swimming pool’s centre and conversion of the current outdoor facility to an indoor one, installation of heat pumps for indoor space conditioning and swimming pool heating, installation of a solar–combi system for domestic hot water production, upgrade of all indoor and outdoor lighting equipment and installation of a photovoltaic plant on the new enclosure’s roof for the compensation of the remaining electricity consumption. With the proposed measures, the municipal sports centre is upgraded to a zero energy facility. The payback period of the investment was calculated at 14 years on the basis of the avoided energy procurement cost. The swimming pool’s centre operation is prolonged during the entire annual period. This work has been funded by the Horizon 2020 project with the acronym “NESOI” and was awarded the public award of the “Islands Gamechanger” competition of the NESOI project and the Clean Energy for EU Islands initiative.
Open AccessRational Use of Energy in Sports Centres to Achieve Net Zero: The SAVE Project (Part A)
Sports centres constitute major energy consumers. This article presents the proposed energy performance upgrade process and the achieved results for the municipal sports centre in Arkalochori, Greece. The facility consists of a swimming pool centre, an outdoor 8 × 8 football court, and two tennis and basketball courts. It operates with considerably high energy consumption due to the lack of any measure towards its energy efficiency improvement since its initial construction in 2002. Due to the significantly high heating cost, the swimming pool centre remains operative only during the summer period. The energy performance upgrade of the facility was holistically approached through all possibly applicable passive and active measures: insulation of opaque surfaces and replacement of openings, construction of a new, bioclimatic enclosure for the swimming pool’s centre and conversion of the current outdoor facility to an indoor one, installation of heat pumps for indoor space conditioning and swimming pool heating, installation of a solar–combi system for domestic hot water production, upgrade of all indoor and outdoor lighting equipment and installation of a photovoltaic plant on the new enclosure’s roof for the compensation of the remaining electricity consumption. With the proposed measures, the municipal sports centre is upgraded to a zero energy facility. The payback period of the investment was calculated at 14 years on the basis of the avoided energy procurement cost. The swimming pool’s centre operation is prolonged during the entire annual period. This work has been funded by the Horizon 2020 project with the acronym “NESOI” and was awarded the public award of the “Islands Gamechanger” competition of the NESOI project and the Clean Energy for EU Islands initiative.