AKAli Erkan Karaman

Ali Erkan Karaman

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Ali Erkan Karaman has a total of 6 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Distance as an Entry Barrier, Not a Friction: Cross-Border Public Works Awards in the European Union, 2012–2023

    by Ali Erkan Karaman

    European public procurement of construction works has been open to competition across Member States for three decades, yet cross-border award shares remain low. This paper separates two quantities the standard statistic confounds: whether a cross-border relationship exists, and how large it is once it does. The analysis matches 782,673 construction-works awards from 2012 to 2023 to a bilateral gravity data set, estimating a logit over country pairs, elasticities on trading pairs, and a staggered difference-in-differences on verified national transposition dates of Directive 2014/24/EU. Distance deters entry but does not govern volume. Over 2016 to 2020, the years bilateral data cover, 194 of 930 country pairs record any cross-border award: entry falls with distance and rises with a shared frontier, while the distance elasticity of cross-border value, measured on 410 pair-year cells, is indistinguishable from zero: +0.131 against −1.139 for merchandise trade. Transposition changed participation by nothing measurable, and the design is inconclusive. The remedies therefore point at the cost of first entry: the size gradient is consistent with lot aggregation under either a fixed cost of entry or selection into large lots, which are not separated, and mutual recognition of qualification and standard sureties address the same margin unmeasured.

  • Open Access

    Green Buildings, Unequal Gains: Building Decarbonisation Policy and the Distribution of Housing Adequacy in OECD Countries, 2003–2024

    by Ali Erkan Karaman

    Buildings absorb about one third of global final energy use, urban housing most of all. Whether the policy wave now pushing those buildings towards decarbonisation helps low-income households, or hurts them through cost pass-through, is untested across countries. We build a 2003–2024 panel of 47 countries, 42 with a coded policy index, linking OECD housing data by income quintile and tenure to a source-cited decarbonisation policy index (GBI-2), Eurostat and World Bank series. Stricter policy leaves total overcrowding about where it was (0.36 pp, p = 0.551), yet bottom-quintile overcrowding moves with it (0.72 pp, p = 0.067). Households unable to keep warm rise by 2.11 pp in the bottom quintile (p = 0.018) and 1.26 pp in the population (p = 0.073); with high-confidence index cells the quintile estimate reaches 1.84 pp (p = 0.006) and survives country-specific trends. A staggered Callaway–Sant'Anna design does not reproduce the associations and peer-adoption IV estimates are imprecise, so we read the pattern as a 'green adequacy squeeze': robust association, not settled causation. A placebo outcome is insignificant. The index was verified in four rounds against OECD/IEA documentation and national legislation (2026). Data, coding protocol and code are released for replication.

  • AHP yöntemi ile iş makinesi seçimi

    by Ali Erkan Karaman

    Gelişen teknoloji ile birlikte otomasyon süreci tüm sektörlerde hızla ilerlese de inşaat sektörü insan odaklı geleneksel çalışmayı halen sürdürmektedir. Şantiyelerde birbirinden farklı ve yüksek metrajlı aktivitelerin olmasından dolayı, süre ve maliyetten kazanım sağlama amacıyla iş makinelerinin kullanımını zorunlu kılmaktadır. Bu çalışmada iş makinalarının seçiminde literatürde ön plana çıkan 7 değerlendirme kriteri belirlenmiş, bu kriterlere göre 4 iş makinesinden birinin seçilmesine ilişkin karar alma probleminin analitik hiyerarşi prosesi (AHP)yöntemi ile çözümlenmesi amaçlanmıştır. AHP’nin yapısını oluşturan karşılaştırma matrislerine ilişkin tutarlılık analizleri yapılmıştır. Analiz sonucunda 4 iş makinesi alternatifi arasından en uygunu belirlenmiştir.

  • Open Access

    Küçük ve Orta Ölçekli Şantiyelerde İş Ekipmanların Sağlık ve Güvenlik Şartlarının Araştırılması

    by Ali Erkan Karaman, Barış Özkul, G. Sakhi Hamid

    İş ekipmanları, birçok sektörde olduğu gibi, inşaat sektöründe de projelerin yapım aşamasında sıklıkla kullanılmaktadır. Bu araştırmada küçük ve orta ölçekli inşaat şantiyelerinde “Yapı İşlerinde İSG Yönetmeliği” EK-5 de yer alan “İş Ekipmanlarının Asgari Sağlık ve Güvenlik Şartlarının” incelenmesi amaçlanmıştır. Araştırmada veri toplama aracı olarak anket kullanılmıştır. Ankette katılımcılara Yönetmeliğin EK-5 bölümüne ilişkin EVET/HAYIR içeren sorular yöneltilmiştir. Elde edilen verilerin frekans dağılımı yapılarak ankete katılan teknik personel ve yöneticilerin mevzuat hakkındaki farkındalığı ölçülmüştür. Elde edilen veriler incelendiğinde katılımcıların 31/12/2018 tarihinde yayımlanan Yönetmeliğin EK-5 (İş Ekipmanlarının Asgari Sağlık ve Güvenlik Şartları) bölümünü, küçük ve orta ölçekli inşaat şantiyelerinde büyük ölçüde uygulamadıkları ortaya çıkmıştır. Yapı İşlerinde İSG Yönetmeliğini bilinmemesi veya eksik uygulanması bu tip şantiyelerde en önemli İSG problemi olarak ortaya çıkmaktadır.

  • Effect of Sub-Contractor Selection on Construction Project Success in Turkey

    by Ali Erkan Karaman, Koray Sandal

    The construction industry leads the national economy in developing countries. It involves industrial requirements, such as developing technologies, related expertise, demand variability, high production speed and progress. Firms in the industry use subcontractors to produce fast, effective solutions. Therefore, projects’ success varies depending on subcontractors’ rather than general contractors’ performance. This study aimed to develop a model of selection criteria for subcontractors and measure their impact on project success. Construction firms using subcontractors were chosen as the target group. Data on the selection of subcontractors from 93 construction firms that employ subcontractors in their projects were collected through a survey. The impact of the subcontracting selection factor on projects’ overall performance was presented with five hypotheses and modeled using a structural equation model. The weight of each selection factor in the subcontracting selection and the impact on the overall project were designated in the model by determining the standardized regression weights (β). Four hypotheses were accepted and one rejected. This study may contribute to the prequalification conditions in the process of selecting subcontractors in the future.


  • Risk Analysis Application in Highway Projects

    by Ali Erkan Karaman, Eray Köseoğlu

    Highway projects are large investment projects and have many risk factors. It is possible to reduce the problems that may affect the success of a project by managing such risk factors through a comprehensive risk management strategy. In this study, it was aimed to determine the significance levels of risk factors faced in highway projects. Risk factors seen in agreement, design and construction stages of highway projects were specified by carrying out a literature review. The specified risk factors were classified under 7 main titles according to the source of risk, and emergence of the relevant risk factor at which stage of the highway project along with which sub-risks was investigated. Risk factors were evaluated by administrating questionnaires to the individuals experienced in highway projects and specialised in their fields. Later on, risk analysis was performed using the decision matrix method and their importance levels were determined. Obtained results suggested that the risk of economic crisis under the title of economic and political risks was the most important risk factor.


  • Ülkelerin Afet Riski Performans Değerlendirmesi: Bulanık Mantık Uygulaması

    by Ali Erkan Karaman, Barış ÖZKUL

    Bu çalışmada; afet öncesi ve afet sonrasını kapsayan afet yönetimi süreci incelenmiştir. Ülkelerin afet yönetimi performanslarını diğer ülkelerle karşılaştırmalarını sağlayacak bir model geliştirilerek örnek bir uygulama sunulması amaçlanmıştır. Çalışmanın örneklemi 4 farklı ülke için alanında uzman 5 akademisyenin görüşü alınarak belirlenmiştir. Ölçülen risk değerleri bulanık sayılara dönüştürülerek ana risk ve alt risk değerleri oluşturulmuştur. Ülkelerin afet risk yönetimi performansını karşılaştırmak için bulanık ağırlıklı ortalama (FWA) algoritması kullanılmıştır. Elde edilen sonuçlar ülkelerin afet sonrası aşamada afet öncesi aşamaya göre daha başarılı olduğunu ve örneklemde simgesel olarak gösterilen A ülkesinin risk performans değeri en yüksek olduğunu göstermiştir.


  • Performance evaluation of construction project with earned value analysis method

    by A. Erkan Karaman, Süleyman Son

    Proje yönetiminin en önemli işlevlerinden biri, sürecin izlenmesi ve kontrolüdür. Proje yönetiminde Kazanılmış Değer Analizi (KDA), maliyet, zamanlama ve teknik performansı birleştiren, iyi bilinen bir yönetim sistemidir. Bu analiz, bir projenin performansını ve ilerlemesini ölçmek ve kontrol etmek için çok önemli bir teknik olup çeşitli sektörlerde kullanılmaktadır. Ayrıca, yaygın kullanılan bir proje kontrol tekniği olduğu ve iş performansının nicel ölçümünü sağladığından kapsamlı inşaat projelerinin yönetim sürecinde de kullanılmaktadır. Bu analiz, maliyet ve zamanlama varyanslarının ve performans endekslerinin hesaplanmasına ve proje maliyetini ve program süresini tahmin etmesine olanak tanır. Bu çalışmada, yapımı tamamlanmış bir inşaat projesine ait bazı iş kalemlerinin Kazanılmış Değer Analizine göre değerlendirmesi yapılmış, süre ve maliyet performanslarına ilişkin analiz sonuçları incelenmiştir.