Meng You
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Meng You has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Shenghan Zhou
School of Reliability and Systems Engineering, Beihang University, Beijing 100191, China
3 shared publications - Yiyong Xiao
School of Reliability and Systems Engineering, Beihang University, Beijing 100191, China
3 shared publications - Xing Pan
Beihang University
2 shared publications - Depei Qian
School of Computer Science and Engineering, Beihang University, Beijing, China
1 shared publication Lang Yu
Beihang University
1 shared publication- Ming Xie
College of Information Engineering, China Jiliang University, Hangzhou 310018, China
1 shared publication
Latest Publications
- Open Access
Modeling the Capacitated Multi-Level Lot-Sizing Problem under Time-Varying Environments and a Fix-and-Optimize Solution Approach
In this study, we investigated the time-varying capacitated lot-sizing problem under a fast-changing production environment, where production factors such as the setup costs, inventory-holding costs, production capacities, or even material prices may be subject to continuous changes during the entire planning horizon. Traditional lot-sizing theorems and algorithms, which often assume a constant production environment, are no longer fit for this situation. We analyzed the time-varying environment of today’s agile enterprises and modeled the time-varying setup costs and the time-varying production capacities. Based on these, we presented two mixed-integer linear programming models for the time-varying capacitated single-level lot-sizing problem and the time-varying capacitated multi-level lot-sizing problem, respectively, with considerations on the impact of time-varying environments and dynamic capacity constraints. New properties of these models were analyzed on the solution’s feasibility and optimality. The solution quality was evaluated in terms of the entropy which indicated that the optimized production system had a lower value than that of the unoptimized one. A number of computational experiments were conducted on well-known benchmark problem instances using the AMPL/CPLEX to verify the proposed models and to test the computational effectiveness and efficiency, which showed that the new models are applicable to the time-varying environment. Two of the benchmark problems were updated with new best-known solutions in the experiments.
Open AccessModeling the Capacitated Multi-Level Lot-Sizing Problem under Time-Varying Environments and a Fix-and-Optimize Solution Approach
In this study, we investigated the time-varying capacitated lot-sizing problem under a fast-changing production environment, where production factors such as the setup costs, inventory-holding costs, production capacities, or even material prices may be subject to continuous changes during the entire planning horizon. Traditional lot-sizing theorems and algorithms, which often assume a constant production environment, are no longer fit for this situation. We analyzed the time-varying environment of today’s agile enterprises and modeled the time-varying setup costs and the time-varying production capacities. Based on these, we presented two mixed-integer linear programming models for the time-varying capacitated single-level lot-sizing problem and the time-varying capacitated multi-level lot-sizing problem, respectively, with considerations on the impact of time-varying environments and dynamic capacity constraints. New properties of these models were analyzed on the solution’s feasibility and optimality. The solution quality was evaluated in terms of the entropy which indicated that the optimized production system had a lower value than that of the unoptimized one. A number of computational experiments were conducted on well-known benchmark problem instances using the AMPL/CPLEX to verify the proposed models and to test the computational effectiveness and efficiency, which showed that the new models are applicable to the time-varying environment. Two of the benchmark problems were updated with new best-known solutions in the experiments.
- Open Access
A Bayesian Failure Prediction Network Based on Text Sequence Mining and Clustering
The purpose of this paper is to predict failures based on textual sequence data. The current failure prediction is mainly based on structured data. However, there are many unstructured data in aircraft maintenance. The failure mentioned here refers to failure types, such as transmitter failure and signal failure, which are classified by the clustering algorithm based on the failure text. For the failure text, this paper uses the natural language processing technology. Firstly, segmentation and the removal of stop words for Chinese failure text data is performed. The study applies the word2vec moving distance model to obtain the failure occurrence sequence for failure texts collected in a fixed period of time. According to the distance, a clustering algorithm is used to obtain a typical number of fault types. Secondly, the failure occurrence sequence is mined using sequence mining algorithms, such as-PrefixSpan. Finally, the above failure sequence is used to train the Bayesian failure network model. The final experimental results show that the Bayesian failure network has higher accuracy for failure prediction.
Open AccessA Bayesian Failure Prediction Network Based on Text Sequence Mining and Clustering
The purpose of this paper is to predict failures based on textual sequence data. The current failure prediction is mainly based on structured data. However, there are many unstructured data in aircraft maintenance. The failure mentioned here refers to failure types, such as transmitter failure and signal failure, which are classified by the clustering algorithm based on the failure text. For the failure text, this paper uses the natural language processing technology. Firstly, segmentation and the removal of stop words for Chinese failure text data is performed. The study applies the word2vec moving distance model to obtain the failure occurrence sequence for failure texts collected in a fixed period of time. According to the distance, a clustering algorithm is used to obtain a typical number of fault types. Secondly, the failure occurrence sequence is mined using sequence mining algorithms, such as-PrefixSpan. Finally, the above failure sequence is used to train the Bayesian failure network model. The final experimental results show that the Bayesian failure network has higher accuracy for failure prediction.
- Open Access
- 24 October 2018
- Published by MDPI AG in Sustainability
- Vol. 10 (11) , 3867
The Uncapacitatied Dynamic Single-Level Lot-Sizing Problem under a Time-Varying Environment and an Exact Solution Approach
The dynamic lot-sizing problem under a time-varying environment considers new features of the production system where factors such as production setup cost, unit inventory-holding cost, and unit price of manufacturing resources may vary in different periods over the whole planning horizon. Traditional lot-sizing theorems and algorithms are no longer fit for these situations as they had assumed constant environments. In our study, we investigated the dynamic lot-sizing problem with deteriorating production setup cost, a typical time-varying environment where the production setup is assumed to consume more preparing time and manufacturing resources as the production interval lasts longer. We proposed new lot-sizing models based on the traditional lot-sizing model considering the changing setup cost as a new constraint, called uncapacitatied dynamic single-level lot-sizing under a time-varying environment (UDSLLS-TVE for short). The UDSLLS-TVE problem has a more realistic significance and higher research value as it is closer to reality and has higher computational complexity as well. We proposed two mathematical programming models to describe UDSLLS_TVE with or without nonlinear components, respectively. Properties of the UDSLLS-TVE models were extensively analyzed and an exact algorithm based on forward dynamic programming (FDP) was proposed to solve this problem with a complexity of O (n2). Comparative experiments with the commercial MIP solver CPLEX on synthesized problem instances showed that the FDP algorithm is a global optimization algorithm and has a high computational efficiency.
- 24 October 2018
- Published by MDPI AG in Sustainability
- Vol. 10 (11) , 3867
Open AccessThe Uncapacitatied Dynamic Single-Level Lot-Sizing Problem under a Time-Varying Environment and an Exact Solution Approach
The dynamic lot-sizing problem under a time-varying environment considers new features of the production system where factors such as production setup cost, unit inventory-holding cost, and unit price of manufacturing resources may vary in different periods over the whole planning horizon. Traditional lot-sizing theorems and algorithms are no longer fit for these situations as they had assumed constant environments. In our study, we investigated the dynamic lot-sizing problem with deteriorating production setup cost, a typical time-varying environment where the production setup is assumed to consume more preparing time and manufacturing resources as the production interval lasts longer. We proposed new lot-sizing models based on the traditional lot-sizing model considering the changing setup cost as a new constraint, called uncapacitatied dynamic single-level lot-sizing under a time-varying environment (UDSLLS-TVE for short). The UDSLLS-TVE problem has a more realistic significance and higher research value as it is closer to reality and has higher computational complexity as well. We proposed two mathematical programming models to describe UDSLLS_TVE with or without nonlinear components, respectively. Properties of the UDSLLS-TVE models were extensively analyzed and an exact algorithm based on forward dynamic programming (FDP) was proposed to solve this problem with a complexity of O (n2). Comparative experiments with the commercial MIP solver CPLEX on synthesized problem instances showed that the FDP algorithm is a global optimization algorithm and has a high computational efficiency.
- 27 June 2014
- Published by Springer Nature
- p. 252-259
A Black-Box Approach for Detecting the Failure Traces
- 27 June 2014
- Published by Springer Nature
- p. 252-259
A Black-Box Approach for Detecting the Failure Traces