Rui Zuo
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Rui Zuo has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Haihui Xie
College of Civil Engineering, Hefei University of Technology, Hefei, China
3 shared publications - Liang Chen
College of Civil Engineering, Hefei University of Technology, Hefei, China
3 shared publications - Zhangliang Hu
College of Civil Engineering, Hefei University of Technology, Hefei, China
3 shared publications - Ruini Hou
Anhui Xinlu Construction Group, Co., Ltd., Fuyang 236000, China
2 shared publications - Shengwei Yang
College of Civil Engineering, Hefei University of Technology, Hefei 230009, China
2 shared publications - Guigang Shi
College of Civil Engineering, Anhui Jianzhu University, Hefei 230009, China
1 shared publication
Latest Publications
- 11 December 2023
- Published by Springer Nature in Archives of Civil and Mechanical Engineering
- Vol. 24 (1) , 1-17
Experimental and numerical study of precast bridge piers with a new UHPC socket column-footing connection
- 11 December 2023
- Published by Springer Nature in Archives of Civil and Mechanical Engineering
- Vol. 24 (1) , 1-17
Experimental and numerical study of precast bridge piers with a new UHPC socket column-footing connection
- Open Access
Seismic Vulnerability Analysis of Long-Span Prestressed Concrete Composite Box Girder Bridge with Corrugated Steel Webs under Construction
In order to address the difficulty in determining the seismic damage probability of continuous girder bridges under construction, the seismic vulnerability analysis method of the construction state is proposed in this study. Firstly, taking a long-span prestressed concrete composite box girder bridge with corrugated steel webs (OSW) as an example, the finite element models (FEMs) of dynamic calculation in different phases of cantilever construction are simulated by OpenSEES. Secondly, by selecting reasonable seismic waves and seismic intensity measures, the non-linear time-history analysis is carried out, followed by the demand parameters and damage indexes suitable for the construction state proposed. Finally, the probabilistic seismic demand model (PSDA) of the continuous box girder bridge during the construction stage is constructed by using the “cloud method”, and the seismic vulnerability curves of the piers and temporary bearings are established to evaluate the seismic performance during the construction stage. The results indicate that the damage probability of piers and temporary bearings increases with the progress of construction. The initial formation of the cantilever structure and the sudden change in the size of the construction segmental girder correspond to a high probability of damage, and seismic protection measures should be strengthened during this construction state. Moreover, significantly higher damage probability of the components under construction compared to the completed bridge after it is built.
Open AccessSeismic Vulnerability Analysis of Long-Span Prestressed Concrete Composite Box Girder Bridge with Corrugated Steel Webs under Construction
In order to address the difficulty in determining the seismic damage probability of continuous girder bridges under construction, the seismic vulnerability analysis method of the construction state is proposed in this study. Firstly, taking a long-span prestressed concrete composite box girder bridge with corrugated steel webs (OSW) as an example, the finite element models (FEMs) of dynamic calculation in different phases of cantilever construction are simulated by OpenSEES. Secondly, by selecting reasonable seismic waves and seismic intensity measures, the non-linear time-history analysis is carried out, followed by the demand parameters and damage indexes suitable for the construction state proposed. Finally, the probabilistic seismic demand model (PSDA) of the continuous box girder bridge during the construction stage is constructed by using the “cloud method”, and the seismic vulnerability curves of the piers and temporary bearings are established to evaluate the seismic performance during the construction stage. The results indicate that the damage probability of piers and temporary bearings increases with the progress of construction. The initial formation of the cantilever structure and the sudden change in the size of the construction segmental girder correspond to a high probability of damage, and seismic protection measures should be strengthened during this construction state. Moreover, significantly higher damage probability of the components under construction compared to the completed bridge after it is built.
- Open Access
- 19 May 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (10) , 8318
Study on Seismic Performance Optimization of Assembly Concrete-Filled Steel Tubular (CFST)-Laced Piers
This study aims to investigate the seismic behavior of concrete-filled steel tubular (CFST)-laced piers; after verifying the model through engineering tests, the simplified finite element models (S-FEM) and refined ones (R-FEM) with CFST-laced piers are developed in this manuscript, respectively. Through comparison, it is found that the S-FEM can effectively improve analyzing efficiency while meeting the requirements of engineering analysis accuracy. In addition, the seismic response of assembled flange-connected CFST-laced piers bridge was studied based on the S-FEM, and different structural parameters, including pier height, axial compression ratios, steel ratios of CFST columns, steel lacing tube arrangement, and longitudinal slope, are considered to optimize the bridge design scheme. Results indicate that the parameters of 0.1 axial pressure ratios and 1:30 longitudinal slope show superior seismic performance. Meanwhile, the peak axial force and peak bending moment of CFST column limbs occur at the pier bottom, and the flanges, which are subject to larger bending moments, are generally located at the two connection positions above the pier bottom.
- 19 May 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (10) , 8318
Open AccessStudy on Seismic Performance Optimization of Assembly Concrete-Filled Steel Tubular (CFST)-Laced Piers
This study aims to investigate the seismic behavior of concrete-filled steel tubular (CFST)-laced piers; after verifying the model through engineering tests, the simplified finite element models (S-FEM) and refined ones (R-FEM) with CFST-laced piers are developed in this manuscript, respectively. Through comparison, it is found that the S-FEM can effectively improve analyzing efficiency while meeting the requirements of engineering analysis accuracy. In addition, the seismic response of assembled flange-connected CFST-laced piers bridge was studied based on the S-FEM, and different structural parameters, including pier height, axial compression ratios, steel ratios of CFST columns, steel lacing tube arrangement, and longitudinal slope, are considered to optimize the bridge design scheme. Results indicate that the parameters of 0.1 axial pressure ratios and 1:30 longitudinal slope show superior seismic performance. Meanwhile, the peak axial force and peak bending moment of CFST column limbs occur at the pier bottom, and the flanges, which are subject to larger bending moments, are generally located at the two connection positions above the pier bottom.