Zoran Stojadinović
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Zoran Stojadinović has a total of 59 co-authors. Here are the top co-authors by number of shared publications:
- Aleksandar Senić
Faculty of Civil Engineering, University of Belgrade, 11000 Belgrade, Serbia
6 shared publications - Momčilo Dobrodolac
Faculty of Transport and Traffic Engineering, University of Belgrade, 11000 Belgrade, Serbia
5 shared publications - Nevena Simić
Faculty of Civil Engineering, University of Belgrade, 11000 Belgrade, Serbia
5 shared publications - Marija Ivanović
Faculty of Civil Engineering, University of Belgrade, 11000 Belgrade, Serbia
3 shared publications - Marko Marinković
University of Belgrade - Faculty of Civil Engineering,Belgrade,Serbia
3 shared publications - Nenad Ivanišević
Faculty of Civil Engineering, University of Belgrade, 11000 Belgrade, Serbia
3 shared publications
Latest Publications
- 29 October 2026
- Published by Serbian Project Management Association
- p. 132-137
Integrating Project Control and Change Management in Construction Projects Using the ADKAR Model
A well-run project control cycle in construction tracks quantities, time, cost and quality, and the corrective measures that follow from it often come down to a requirement that someone start working differently. This transition is not explicitly addressed in the literature reviewed in this paper, even though it takes place whenever a control report initiates a measure that someone has to carry out. The paper proposes a conceptual integration by mapping the ADKAR model of individual change onto the project control cycle, with the point of overlap located at the corrective measure step. The operational plan sits outside ADKAR, while Progress Measurement and Trend Analysis together generate Awareness out of the control data themselves, and the corrective measure internally carries Hiatt’s original sequence from Desire to Reinforcement. Through this mapping, the corrective measure acquires a second side, as an implementation event carried out by people and as a small, recurring change event within a single control iteration.
- 29 October 2026
- Published by Serbian Project Management Association
- p. 132-137
Integrating Project Control and Change Management in Construction Projects Using the ADKAR Model
A well-run project control cycle in construction tracks quantities, time, cost and quality, and the corrective measures that follow from it often come down to a requirement that someone start working differently. This transition is not explicitly addressed in the literature reviewed in this paper, even though it takes place whenever a control report initiates a measure that someone has to carry out. The paper proposes a conceptual integration by mapping the ADKAR model of individual change onto the project control cycle, with the point of overlap located at the corrective measure step. The operational plan sits outside ADKAR, while Progress Measurement and Trend Analysis together generate Awareness out of the control data themselves, and the corrective measure internally carries Hiatt’s original sequence from Desire to Reinforcement. Through this mapping, the corrective measure acquires a second side, as an implementation event carried out by people and as a small, recurring change event within a single control iteration.
- Open Access
- 12 August 2026
- Published by Wiley in Earthquake Spectra
- Vol. 42 (3)
From Observed Damage to Executable Repair Quantities: The RELA Repair Module
Postearthquake workflows currently support three distinct classes of decisions: safety clearance through rapid tagging, portfolio‐level economic damage estimation through probabilistic loss models, and field inspections based on locally defined survey forms, which may subsequently trigger project‐specific strengthening through retrofit design. However, commitment to executable repair work at the building level, what to repair, where, and in what quantities, remains largely ad hoc, despite being required early in recovery for the majority of lightly to moderately damaged buildings. This paper introduces the RELA Repair Module (RELA‐RM), a rapid, observation‐driven framework that translates visually observed damage into executable repair quantities through predefined decision logic and standardized repair norms. Damage is recorded at the level of individual building elements and transformed into a building‐level Repair Bill of Quantities (RBoQ) expressed in person‐hours and material quantities. Repair cost and duration are subsequently derived through externally supplied pricing and workforce assumptions, while optional qualitative escalation indications flag cases that may require detailed engineering assessment. Spatial localization of repair actions is retained throughout the workflow to preserve building‐level organization of repair scope. Uncertainty is treated as bounded variability arising from three identifiable sources within the workflow: photographic measurement effects, human annotation variability, and dispersion in standardized productivity norms. These contributions are propagated to produce an approximate combined dispersion of ≈26%, interpreted as an engineering bound on expected variability in executable repair quantities. The framework is implemented and demonstrated for masonry walls, while the underlying decision principle is intended to be extensible to other building elements and typologies.
- 12 August 2026
- Published by Wiley in Earthquake Spectra
- Vol. 42 (3)
Open AccessFrom Observed Damage to Executable Repair Quantities: The RELA Repair Module
Postearthquake workflows currently support three distinct classes of decisions: safety clearance through rapid tagging, portfolio‐level economic damage estimation through probabilistic loss models, and field inspections based on locally defined survey forms, which may subsequently trigger project‐specific strengthening through retrofit design. However, commitment to executable repair work at the building level, what to repair, where, and in what quantities, remains largely ad hoc, despite being required early in recovery for the majority of lightly to moderately damaged buildings. This paper introduces the RELA Repair Module (RELA‐RM), a rapid, observation‐driven framework that translates visually observed damage into executable repair quantities through predefined decision logic and standardized repair norms. Damage is recorded at the level of individual building elements and transformed into a building‐level Repair Bill of Quantities (RBoQ) expressed in person‐hours and material quantities. Repair cost and duration are subsequently derived through externally supplied pricing and workforce assumptions, while optional qualitative escalation indications flag cases that may require detailed engineering assessment. Spatial localization of repair actions is retained throughout the workflow to preserve building‐level organization of repair scope. Uncertainty is treated as bounded variability arising from three identifiable sources within the workflow: photographic measurement effects, human annotation variability, and dispersion in standardized productivity norms. These contributions are propagated to produce an approximate combined dispersion of ≈26%, interpreted as an engineering bound on expected variability in executable repair quantities. The framework is implemented and demonstrated for masonry walls, while the underlying decision principle is intended to be extensible to other building elements and typologies.
- Open Access
- 27 October 2025
- Published by Faculty of Transport and Traffic Sciences in Promet - Traffic&Transportation
- Vol. 37 (6) , 1441-1457
Risk Prediction in Road Infrastructure Projects Considering Project Complexity Coefficients
Risks causing delays in the construction of roads and highways frequently lead to substantial economic and social consequences, with project timelines extending up to three times beyond their initial schedules. These risks not only extend the project timeline but also escalate the overall project execution cost. Despite extensive research on construction-related risks globally, a notable gap remains in studies specifically addressing the risk factors that cause delays in road projects. Analysing completed projects is crucial to derive practical and applicable results, as they offer essential insights into the real-world challenges and risks that may cause timeline extensions and budget escalations. Such an approach ensures that the findings are grounded in actual project outcomes, thereby enhancing their relevance and effectiveness in improving future project planning and risk management. For these reasons, this study aims to analyse 25 project characteristics across 28 completed projects, from which three project complexity coefficients are derived. Additionally, a list of risks is defined based on expert evaluations, and the dominant risks are identified. For each of these dominant risks, a prediction model is constructed using Sugeno fuzzy logic, enabling more accurate and sustainable risk management and mitigation in future projects.
- 27 October 2025
- Published by Faculty of Transport and Traffic Sciences in Promet - Traffic&Transportation
- Vol. 37 (6) , 1441-1457
Open AccessRisk Prediction in Road Infrastructure Projects Considering Project Complexity Coefficients
Risks causing delays in the construction of roads and highways frequently lead to substantial economic and social consequences, with project timelines extending up to three times beyond their initial schedules. These risks not only extend the project timeline but also escalate the overall project execution cost. Despite extensive research on construction-related risks globally, a notable gap remains in studies specifically addressing the risk factors that cause delays in road projects. Analysing completed projects is crucial to derive practical and applicable results, as they offer essential insights into the real-world challenges and risks that may cause timeline extensions and budget escalations. Such an approach ensures that the findings are grounded in actual project outcomes, thereby enhancing their relevance and effectiveness in improving future project planning and risk management. For these reasons, this study aims to analyse 25 project characteristics across 28 completed projects, from which three project complexity coefficients are derived. Additionally, a list of risks is defined based on expert evaluations, and the dominant risks are identified. For each of these dominant risks, a prediction model is constructed using Sugeno fuzzy logic, enabling more accurate and sustainable risk management and mitigation in future projects.
- 28 July 2025
- Published by Serbian Project Management Association
- p. 75-82
Digital Support in the Construction Industry: The Role of Large Language Models in Risk Management
The construction industry frequently suffers cost and schedule overruns. Contributing factors include fragmented risk processes and the laborious manual review of large volumes of unstructured text. In 2022, the DREAM model demonstrated that combining machine-learning classifiers with expert knowledge can uncover the root causes of delays more systematically than manual review. However, it required extensive retraining for each new context and was prone to bias from experts. Recent advances in large language models, particularly GPT-4, offer zero or few-shot adaptability across vast unstructured text, eliminating the need for bespoke annotation. This paper evaluates whether an off-the-shelf GPT-4 model, used in zero-shot mode, can accurately classify causes of delay (CoDs) from meeting minutes without fine-tuning. A protocol for prompt engineering with iterative self-consistency checks is implemented to maximize reliability. Experimental results, including confusion-matrix analysis, demonstrate that ChatGPT-4 outperforms DREAM by closing the performance gap while significantly reducing annotation effort. By quantifying annotation savings and characterizing residual biases, we demonstrate that modern large language models (LLMs) enable scalable, data-efficient AI support in construction risk management.
- 28 July 2025
- Published by Serbian Project Management Association
- p. 75-82
Digital Support in the Construction Industry: The Role of Large Language Models in Risk Management
The construction industry frequently suffers cost and schedule overruns. Contributing factors include fragmented risk processes and the laborious manual review of large volumes of unstructured text. In 2022, the DREAM model demonstrated that combining machine-learning classifiers with expert knowledge can uncover the root causes of delays more systematically than manual review. However, it required extensive retraining for each new context and was prone to bias from experts. Recent advances in large language models, particularly GPT-4, offer zero or few-shot adaptability across vast unstructured text, eliminating the need for bespoke annotation. This paper evaluates whether an off-the-shelf GPT-4 model, used in zero-shot mode, can accurately classify causes of delay (CoDs) from meeting minutes without fine-tuning. A protocol for prompt engineering with iterative self-consistency checks is implemented to maximize reliability. Experimental results, including confusion-matrix analysis, demonstrate that ChatGPT-4 outperforms DREAM by closing the performance gap while significantly reducing annotation effort. By quantifying annotation savings and characterizing residual biases, we demonstrate that modern large language models (LLMs) enable scalable, data-efficient AI support in construction risk management.
- Top Cited PapersOpen Access
- 4 March 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (5) , 2736
Development of a Hybrid Model for Risk Assessment and Management in Complex Road Infrastructure Projects
During the execution of road infrastructure projects, project managers face significant challenges, including financial, technical, regulatory, and operational risks. More than 90% of infrastructure projects have incurred costs exceeding initial estimates, impacting both completion timelines and the operational efficiency of road infrastructure. Effectively assessing and managing these risks is crucial for improving project outcomes and ensuring the sustainability of infrastructure investments. To address these challenges, this study developed a hybrid model for risk assessment and management in road infrastructure projects. The model quantifies risks across seven key categories: Design, External, Resource, Employer, Contractor, Engineer, and Project, based on three primary input factors: Environment coefficient, Contractual coefficient, and Design coefficient. Initially, various machine learning models, including linear regression, Random Forest, Gradient Boosting, Stacking Models, and neural networks, were applied to assess risk predictions. However, due to the specific nature of the dataset, these models did not achieve satisfactory predictive accuracy. As a result, fuzzy logic systems (Mamdani and Sugeno) were employed, demonstrating superior performance in modeling risk occurrence probabilities. Comparative analysis between these two fuzzy logic approaches revealed that the Sugeno model provided the most accurate predictions. The findings highlight the benefits of applying fuzzy logic for risk assessment in complex infrastructure projects, providing a structured framework for enhancing decision-making processes. This study provides a structured methodology for accurately predicting risks and enhancing project safety, efficiency, and long-term sustainability.
- 4 March 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (5) , 2736
Top Cited PapersOpen AccessDevelopment of a Hybrid Model for Risk Assessment and Management in Complex Road Infrastructure Projects
During the execution of road infrastructure projects, project managers face significant challenges, including financial, technical, regulatory, and operational risks. More than 90% of infrastructure projects have incurred costs exceeding initial estimates, impacting both completion timelines and the operational efficiency of road infrastructure. Effectively assessing and managing these risks is crucial for improving project outcomes and ensuring the sustainability of infrastructure investments. To address these challenges, this study developed a hybrid model for risk assessment and management in road infrastructure projects. The model quantifies risks across seven key categories: Design, External, Resource, Employer, Contractor, Engineer, and Project, based on three primary input factors: Environment coefficient, Contractual coefficient, and Design coefficient. Initially, various machine learning models, including linear regression, Random Forest, Gradient Boosting, Stacking Models, and neural networks, were applied to assess risk predictions. However, due to the specific nature of the dataset, these models did not achieve satisfactory predictive accuracy. As a result, fuzzy logic systems (Mamdani and Sugeno) were employed, demonstrating superior performance in modeling risk occurrence probabilities. Comparative analysis between these two fuzzy logic approaches revealed that the Sugeno model provided the most accurate predictions. The findings highlight the benefits of applying fuzzy logic for risk assessment in complex infrastructure projects, providing a structured framework for enhancing decision-making processes. This study provides a structured methodology for accurately predicting risks and enhancing project safety, efficiency, and long-term sustainability.
- Open Access
- 16 January 2025
- Published by MDPI AG in Mathematics
- Vol. 13 (2) , 278
Prioritization of Preventive Measures: A Multi-Criteria Approach to Risk Mitigation in Road Infrastructure Projects
Risk management in construction projects is a critical process aimed at identifying, evaluating, and mitigating potential risks that could impact project performance. Preventive measures play a central role in this process, serving as proactive strategies to minimize the likelihood and impact of risks on project outcomes. This study involved 37 experts from multidisciplinary fields related to road infrastructure, ensuring a diverse and comprehensive perspective on risk evaluation and prevention. The DELPHI method was employed to systematically define key risks and their corresponding preventive measures, providing a structured foundation for further analysis. The experts evaluated 302 preventive measures across 56 risks using 4 predefined criteria: implementation costs, time required for implementation, implementation complexity, and probability of success. A multi-criteria decision making (MCDM) approach was then applied to analyze these evaluations, enabling the prioritization of preventive measures and the allocation of resources toward the most effective strategies. Additionally, fuzzy logic was employed to analyze and validate the results, providing a complementary approach to the MCDM methodology. The results of this research provide a robust framework for risk management, offering practical guidance for decision makers in the construction industry. By integrating expert judgment, systematic evaluation, and advanced analytical methods, this study delivers actionable insights and establishes a reliable methodology for enhancing the effectiveness of risk mitigation in road infrastructure projects.
- 16 January 2025
- Published by MDPI AG in Mathematics
- Vol. 13 (2) , 278
Open AccessPrioritization of Preventive Measures: A Multi-Criteria Approach to Risk Mitigation in Road Infrastructure Projects
Risk management in construction projects is a critical process aimed at identifying, evaluating, and mitigating potential risks that could impact project performance. Preventive measures play a central role in this process, serving as proactive strategies to minimize the likelihood and impact of risks on project outcomes. This study involved 37 experts from multidisciplinary fields related to road infrastructure, ensuring a diverse and comprehensive perspective on risk evaluation and prevention. The DELPHI method was employed to systematically define key risks and their corresponding preventive measures, providing a structured foundation for further analysis. The experts evaluated 302 preventive measures across 56 risks using 4 predefined criteria: implementation costs, time required for implementation, implementation complexity, and probability of success. A multi-criteria decision making (MCDM) approach was then applied to analyze these evaluations, enabling the prioritization of preventive measures and the allocation of resources toward the most effective strategies. Additionally, fuzzy logic was employed to analyze and validate the results, providing a complementary approach to the MCDM methodology. The results of this research provide a robust framework for risk management, offering practical guidance for decision makers in the construction industry. By integrating expert judgment, systematic evaluation, and advanced analytical methods, this study delivers actionable insights and establishes a reliable methodology for enhancing the effectiveness of risk mitigation in road infrastructure projects.
- Open Access
- 13 September 2024
- Published by MDPI AG in Mathematics
- Vol. 12 (18) , 2852
Predicting Extension of Time and Increasing Contract Price in Road Infrastructure Projects Using a Sugeno Fuzzy Logic Model
Road infrastructure plays a crucial role in the development of countries, significantly influencing economic growth, social progress, and environmental sustainability. Major infrastructure projects are frequently challenged by substantial risks and uncertainties, leading to delays, budget overruns, and compromised quality. These issues can undermine the economic viability and efficiency of projects, making effective risk management essential for minimizing negative impacts and ensuring project success. For these reasons, a study was conducted using a Sugeno fuzzy logic system applied to completed projects. The resulting model is based on 10 project characteristics and provides highly accurate predictions for Extension of Time (EoT) and Increasing Contract Price (ICP). By utilizing this model, project management can be significantly improved through more accurate forecasting of potential delays and cost overruns. The high precision of the Sugeno fuzzy logic system enables better risk assessment and proactive decision-making, allowing project managers to implement targeted strategies to mitigate risks and optimize project outcomes.
- 13 September 2024
- Published by MDPI AG in Mathematics
- Vol. 12 (18) , 2852
Open AccessPredicting Extension of Time and Increasing Contract Price in Road Infrastructure Projects Using a Sugeno Fuzzy Logic Model
Road infrastructure plays a crucial role in the development of countries, significantly influencing economic growth, social progress, and environmental sustainability. Major infrastructure projects are frequently challenged by substantial risks and uncertainties, leading to delays, budget overruns, and compromised quality. These issues can undermine the economic viability and efficiency of projects, making effective risk management essential for minimizing negative impacts and ensuring project success. For these reasons, a study was conducted using a Sugeno fuzzy logic system applied to completed projects. The resulting model is based on 10 project characteristics and provides highly accurate predictions for Extension of Time (EoT) and Increasing Contract Price (ICP). By utilizing this model, project management can be significantly improved through more accurate forecasting of potential delays and cost overruns. The high precision of the Sugeno fuzzy logic system enables better risk assessment and proactive decision-making, allowing project managers to implement targeted strategies to mitigate risks and optimize project outcomes.
- Open Access
- 4 September 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (17) , 7694
Development of Risk Quantification Models in Road Infrastructure Projects
Road infrastructure is a significant factor in the development of any country, affecting economic growth, social development, and environmental sustainability. Large infrastructure projects often face significant risks and uncertainties, which can lead to delays, budget over-runs, and an insufficient quality of the completed work. These issues undermine the economic viability of projects and affect the overall efficiency of infrastructure development. For these reasons, based on a literature review and completed project analysis, the risks that lead to an increasing Contract Price (ICP) and an Extension of Time (EoT) for the construction of the project are identified. Based on the results of the completed project analysis, the values of the ICP and EoT were quantified. Also, the probability of the occurrence of each risk in new projects was calculated. Based on the obtained results, a model was defined that groups risks into clusters. Risks in the first cluster should have priority for funding, and preventive measures are defined for them. The model obtained in this way can greatly enhance project management in real-world conditions and can lead to a significant reduction in project time and budget over-runs.
- 4 September 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (17) , 7694
Open AccessDevelopment of Risk Quantification Models in Road Infrastructure Projects
Road infrastructure is a significant factor in the development of any country, affecting economic growth, social development, and environmental sustainability. Large infrastructure projects often face significant risks and uncertainties, which can lead to delays, budget over-runs, and an insufficient quality of the completed work. These issues undermine the economic viability of projects and affect the overall efficiency of infrastructure development. For these reasons, based on a literature review and completed project analysis, the risks that lead to an increasing Contract Price (ICP) and an Extension of Time (EoT) for the construction of the project are identified. Based on the results of the completed project analysis, the values of the ICP and EoT were quantified. Also, the probability of the occurrence of each risk in new projects was calculated. Based on the obtained results, a model was defined that groups risks into clusters. Risks in the first cluster should have priority for funding, and preventive measures are defined for them. The model obtained in this way can greatly enhance project management in real-world conditions and can lead to a significant reduction in project time and budget over-runs.
- Open Access
- 31 May 2023
- Published by Springer Nature in Journal of Big Data
- Vol. 10 (1) , 1-25
Teaching computing for complex problems in civil engineering and geosciences using big data and machine learning: synergizing four different computing paradigms and four different management domains
This article describes a teaching strategy that synergizes computing and management, aimed at the running of complex projects in industry and academia, in the areas of civil engineering, physics, geosciences, and a number of other related fields. The course derived from this strategy includes four parts: (a) Computing with a selected set of modern paradigms—the stress is on Control Flow and Data Flow computing paradigms, but paradigms conditionally referred to as Energy Flow and Diffusion Flow are also covered; (b) Project management that is holistic—the stress is on the wide plethora of issues spanning from the preparation of project proposals, all the way to incorporation activities to follow after the completion of a successful project; (c) Examples from past research and development experiences—the stress is on experiences of leading experts from academia and industry; (d) Student projects that stimulate creativity—the stress is on methods that educators could use to induce and accelerate the creativity of students in general. Finally, the article ends with selected pearls of wisdom that could be treated as suggestions for further elaboration.
- 31 May 2023
- Published by Springer Nature in Journal of Big Data
- Vol. 10 (1) , 1-25
Open AccessTeaching computing for complex problems in civil engineering and geosciences using big data and machine learning: synergizing four different computing paradigms and four different management domains
This article describes a teaching strategy that synergizes computing and management, aimed at the running of complex projects in industry and academia, in the areas of civil engineering, physics, geosciences, and a number of other related fields. The course derived from this strategy includes four parts: (a) Computing with a selected set of modern paradigms—the stress is on Control Flow and Data Flow computing paradigms, but paradigms conditionally referred to as Energy Flow and Diffusion Flow are also covered; (b) Project management that is holistic—the stress is on the wide plethora of issues spanning from the preparation of project proposals, all the way to incorporation activities to follow after the completion of a successful project; (c) Examples from past research and development experiences—the stress is on experiences of leading experts from academia and industry; (d) Student projects that stimulate creativity—the stress is on methods that educators could use to induce and accelerate the creativity of students in general. Finally, the article ends with selected pearls of wisdom that could be treated as suggestions for further elaboration.
- Open Access
- 22 May 2023
- Published by Springer Nature in Journal of Big Data
- Vol. 10 (1) , 1-21
Research in computing-intensive simulations for nature-oriented civil-engineering and related scientific fields, using machine learning and big data: an overview of open problems
This article presents a taxonomy and represents a repository of open problems in computing for numerically and logically intensive problems in a number of disciplines that have to synergize for the best performance of simulation-based feasibility studies on nature-oriented engineering in general and civil engineering in particular. Topics include but are not limited to: Nature-based construction, genomics supporting nature-based construction, earthquake engineering, and other types of geophysical disaster prevention activities, as well as the studies of processes and materials of interest for the above. In all these fields, problems are discussed that generate huge amounts of Big Data and are characterized with mathematically highly complex Iterative Algorithms. In the domain of applications, it has been stressed that problems could be made less computationally demanding if the number of computing iterations is made smaller (with the help of Artificial Intelligence or Conditional Algorithms), or if each computing iteration is made shorter in time (with the help of Data Filtration and Data Quantization). In the domain of computing, it has been stressed that computing could be made more powerful if the implementation technology is changed (Si, GaAs, etc.…), or if the computing paradigm is changed (Control Flow, Data Flow, etc.…).
- 22 May 2023
- Published by Springer Nature in Journal of Big Data
- Vol. 10 (1) , 1-21
Open AccessResearch in computing-intensive simulations for nature-oriented civil-engineering and related scientific fields, using machine learning and big data: an overview of open problems
This article presents a taxonomy and represents a repository of open problems in computing for numerically and logically intensive problems in a number of disciplines that have to synergize for the best performance of simulation-based feasibility studies on nature-oriented engineering in general and civil engineering in particular. Topics include but are not limited to: Nature-based construction, genomics supporting nature-based construction, earthquake engineering, and other types of geophysical disaster prevention activities, as well as the studies of processes and materials of interest for the above. In all these fields, problems are discussed that generate huge amounts of Big Data and are characterized with mathematically highly complex Iterative Algorithms. In the domain of applications, it has been stressed that problems could be made less computationally demanding if the number of computing iterations is made smaller (with the help of Artificial Intelligence or Conditional Algorithms), or if each computing iteration is made shorter in time (with the help of Data Filtration and Data Quantization). In the domain of computing, it has been stressed that computing could be made more powerful if the implementation technology is changed (Si, GaAs, etc.…), or if the computing paradigm is changed (Control Flow, Data Flow, etc.…).