AMAnqi Mao

Anqi Mao

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Anqi Mao has a total of 6 co-authors. Here are the top co-authors by number of shared publications:

  • Henglin Xiao

    State Key Laboratory of Precision Blasting, Jianghan University, Wuhan, China

    1 shared publication
  • Jian Lu

    College of Civil Engineering and Environment, Hubei University of Technology, Wuhan 430068, China

    1 shared publication
  • Lei Xi

    Key Laboratory of Intelligent Health Perception and Ecological Restoration of Rivers and Lakes, Ministry of Education, Hubei University of Technology, Wuhan 430068, China

    1 shared publication
  • Qiang Ma

    School of Civil Engineering, Architecture and Environment, Hubei University of Technology, Wuhan 430068, China

    1 shared publication
  • Wentao Li

    School of Civil Engineering, Architecture and Environment, Hubei University of Technology, Wuhan 430068, China

    1 shared publication
  • Zhi Chen

    State Key Laboratory of Precision Blasting, Jianghan University, No. 8, Sanjiaohu Road, Han-Nan District, Wuhan 430056, China

    1 shared publication

Latest Publications

  • Open Access

    Experimental Study on Ice Melting of Bridge Tower Crossbeams under Different Conditions

    by Zhi Chen, Jian Lu, Anqi Mao, Lei Xi, Wentao Li, Qiang Ma, Henglin Xiao

    The bridge tower beams of long-span bridges freeze during winter. The accumulated ice on the beam flakes off and falls into the bridge deck from a high altitude with temperature rise, threatening traffic safety. To solve this problem, an electric heating method is used to melt the snow and ice on bridge tower beams. A design scheme based on embedding carbon fiber heating wires in a bridge tower beam is proposed in which electrical energy is converted into heat energy to melt the snow and ice on the beam. In this paper, a beam icing test and beam de-icing test are carried out through a laboratory model test. The model test results show that under the conditions of a wind speed of 4.5 m/s and an ambient temperature of −15 °C, the average internal temperature of the beam after heating stabilization is 1.37 °C; this is higher than the average critical temperature of 1.31 °C. This temperature is sufficient to melt the ice and proves the practicability of this method. The de-icing method of embedded carbon fiber heating is simple, efficient, and environmentally friendly. This can provide a reliable reference for the practical application of de-icing a bridge beam.