Shiyang Pan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Shiyang Pan has a total of 23 co-authors. Here are the top co-authors by number of shared publications:
Chunji Ren
College of New Energy, China University of Petroleum (East China), Qingdao, 266580, China
2 shared publications- Jun Wang
College of New Energy, China University of Petroleum (East China), Qingdao, 266580, China
2 shared publications Yuanjie Xin
College of New Energy, China University of Petroleum (East China), Qingdao, 266580, China
2 shared publications- Zengli Wang
China University of Petroleum (East China)
2 shared publications Chaoning Lin
1 shared publicationF Liu
Tsinghua University 3 Senior engineer , Department of Hydraulic Engineering Beijing, P.R. China
1 shared publication
Latest Publications
- 4 August 2025
- Published by Elsevier in Computers & Structures
- Vol. 316
A novel solid-plate coupling finite element method for face slab of concrete-faced rockfill dams
- 4 August 2025
- Published by Elsevier in Computers & Structures
- Vol. 316
A novel solid-plate coupling finite element method for face slab of concrete-faced rockfill dams
- Open Access
- 5 June 2023
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 27 (7) , 2908-2920
The Application of Built-in Beam Element Method in the Aqueduct Pile Foundation Analysis
- 5 June 2023
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 27 (7) , 2908-2920
Open AccessThe Application of Built-in Beam Element Method in the Aqueduct Pile Foundation Analysis
- 19 December 2019
- Published by Emerald Publishing in Engineering Computations
- Vol. 37 (5) , 1531-1555
The forward and inversion analysis of high rock-fill dam during construction period using the node-based smoothed point interpolation method
Purpose: The meshfree node-based smoothed point interpolation method (NS-PIM) is extended to the forward and inversion analysis of a high gravelly soil core rock-fill dam during construction periods.Design/methodology/approach: As one member of the meshfree methods, the NS-PIM has the advantages of “softer” stiffness and adaptability to large deformations which is quite indispensable for the stability analysis of rock-fill dams. In this work, the present method contains a reconstruction procedure to deal with the existence or nonexistence of the construction layers. After verifying the validity of the NS-PIM method for nonlinear elastic model during construction period, the convergence features of the NS-PIM and FEM methods are further investigated with different mesh schemes. Furthermore, the NS-PIM and FEM methods are applied for the forward analysis of a high gravelly soil core rock-fill dam and the convergence features under complex stress conditions are also studied using the rock-fill dam model. Finally, the NS-PIM method is used to calculate the Duncan–Chang parameters of the deep overburden under the high gravelly soil core rock-fill dam based on the back-propagation neural network method.Findings: The results show that: the NS-PIM solution for construction analysis still possesses the property of upper bound solution even under complex stress conditions and can provide comparatively more conservative results for safety evaluation. Furthermore, it can be used to evaluate the accuracy of results and mesh quality together with the FEM solution which has the property of lower bound solution; the inversion analysis in this work provides a set of material parameters for the deep overburden under high rock-fill dam during construction period and the calculated results show good agreement with the measured displacement values and it is feasible to apply the NS-PIM to the forward and inversion analysis of high rock-fill dams on deep overburden during construction periods.Research limitations/implications: In further study, the feasibility of three-dimensional problems, elastic–plastic problems, contact problems and multipoint inversion can still be probed in the NS-PIM solution for the forward and inversion analysis of high rock-fill dams on deep overburden.Practical implications: This paper introduced a method for the forward and inversion analysis of high rock-fill dams during construction period using the NS-PIM solution. The property of upper bound solution ensures that the NS-PIM can provide more conservative results for safety evaluation. The inversion analysis in this work provides a set of material parameters for the deep overburden under high rock-fill dam during construction periods.Originality/value: First, the analysis from forward to inversion for high rock-fill dams during construction period using the NS-PIM solution is accomplished in this work. A procedure dealing with the existence or nonexistence of the construction layers is also developed for the construction analysis. Second, it is confirmed in this work that the NS-PIM still possesses the property of upper bound solution even under complex stress conditions (the forward analysis of high rock-fill dams during construction period). Thus, more conservative results can be provided for safety evaluation. Furthermore, it can be used to evaluate the accuracy of results and mesh quality together with the FEM solution which has the property of lower bound solution. Third, the calculated material parameters of the deep overburden in this work can be used for further studies of the high rock-fill dam.
- 19 December 2019
- Published by Emerald Publishing in Engineering Computations
- Vol. 37 (5) , 1531-1555
The forward and inversion analysis of high rock-fill dam during construction period using the node-based smoothed point interpolation method
Purpose: The meshfree node-based smoothed point interpolation method (NS-PIM) is extended to the forward and inversion analysis of a high gravelly soil core rock-fill dam during construction periods.Design/methodology/approach: As one member of the meshfree methods, the NS-PIM has the advantages of “softer” stiffness and adaptability to large deformations which is quite indispensable for the stability analysis of rock-fill dams. In this work, the present method contains a reconstruction procedure to deal with the existence or nonexistence of the construction layers. After verifying the validity of the NS-PIM method for nonlinear elastic model during construction period, the convergence features of the NS-PIM and FEM methods are further investigated with different mesh schemes. Furthermore, the NS-PIM and FEM methods are applied for the forward analysis of a high gravelly soil core rock-fill dam and the convergence features under complex stress conditions are also studied using the rock-fill dam model. Finally, the NS-PIM method is used to calculate the Duncan–Chang parameters of the deep overburden under the high gravelly soil core rock-fill dam based on the back-propagation neural network method.Findings: The results show that: the NS-PIM solution for construction analysis still possesses the property of upper bound solution even under complex stress conditions and can provide comparatively more conservative results for safety evaluation. Furthermore, it can be used to evaluate the accuracy of results and mesh quality together with the FEM solution which has the property of lower bound solution; the inversion analysis in this work provides a set of material parameters for the deep overburden under high rock-fill dam during construction period and the calculated results show good agreement with the measured displacement values and it is feasible to apply the NS-PIM to the forward and inversion analysis of high rock-fill dams on deep overburden during construction periods.Research limitations/implications: In further study, the feasibility of three-dimensional problems, elastic–plastic problems, contact problems and multipoint inversion can still be probed in the NS-PIM solution for the forward and inversion analysis of high rock-fill dams on deep overburden.Practical implications: This paper introduced a method for the forward and inversion analysis of high rock-fill dams during construction period using the NS-PIM solution. The property of upper bound solution ensures that the NS-PIM can provide more conservative results for safety evaluation. The inversion analysis in this work provides a set of material parameters for the deep overburden under high rock-fill dam during construction periods.Originality/value: First, the analysis from forward to inversion for high rock-fill dams during construction period using the NS-PIM solution is accomplished in this work. A procedure dealing with the existence or nonexistence of the construction layers is also developed for the construction analysis. Second, it is confirmed in this work that the NS-PIM still possesses the property of upper bound solution even under complex stress conditions (the forward analysis of high rock-fill dams during construction period). Thus, more conservative results can be provided for safety evaluation. Furthermore, it can be used to evaluate the accuracy of results and mesh quality together with the FEM solution which has the property of lower bound solution. Third, the calculated material parameters of the deep overburden in this work can be used for further studies of the high rock-fill dam.
- 1 December 1999
- Published by ASTM International in Geotechnical Testing Journal
- Vol. 22 (4) , 317-323
Development of Pile Driver and Load Set for Pile Group in Centrifuge
When testing piles in a geotechnical centrifuge, it is more efficient to drive piles into the soil in centrifuge flight instead of placing piles prior to running the centrifuge in order to simulate the real conditions. A new pile driver with loading set used to drive and load piles in a centrifuge has been designed and manufactured successfully by the authors. The apparatus on the model container is light and can be maneuvered in the X-Y plane easily. With this apparatus, the piles can be driven or pushed into the soil in centrifuge flight at any position in the X-Y plane. Furthermore, the pile group can be driven into the soil one by one, and the loading test of the pile group can be performed without stopping the operation of the centrifuge.
- 1 December 1999
- Published by ASTM International in Geotechnical Testing Journal
- Vol. 22 (4) , 317-323
Development of Pile Driver and Load Set for Pile Group in Centrifuge
When testing piles in a geotechnical centrifuge, it is more efficient to drive piles into the soil in centrifuge flight instead of placing piles prior to running the centrifuge in order to simulate the real conditions. A new pile driver with loading set used to drive and load piles in a centrifuge has been designed and manufactured successfully by the authors. The apparatus on the model container is light and can be maneuvered in the X-Y plane easily. With this apparatus, the piles can be driven or pushed into the soil in centrifuge flight at any position in the X-Y plane. Furthermore, the pile group can be driven into the soil one by one, and the loading test of the pile group can be performed without stopping the operation of the centrifuge.