Xinrui Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Xinrui Wang has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Zezhou Wu
Department of Construction Management and Real Estate, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518000, China
2 shared publications - Zhikun Ding
Sino-Australia Joint Research Center in BIM and Smart Construction, Shenzhen University
2 shared publications - Fangsheng Yang
China Construction First Group South China Region, Shenzhen 518040, China
1 shared publication Jian Zuo
The University of Adelaide
1 shared publication- Jiasheng Zhang
CCFED the Fifth Construction & Engineering. Co., Ltd., Changsha 410004, China
1 shared publication - Junfeng Hu
China Construction First Group South China Region, Shenzhen 518040, China
1 shared publication
Latest Publications
- Open Access
- 8 March 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (6) , 2262
Investigating the Determinants of Construction Stakeholders’ Intention to Use Construction and Demolition Waste Recycling Products Based on the S-O-R Model in China
In China, the annual generation of construction and demolition waste (CDW) has been steadily increasing, accompanied by a generally low recycling rate. To promote sustainable development, there is an urgent need to enhance the recycling of CDW. This paper aims to investigate the determinants of construction stakeholders’ intention to use CDW recycling products in China. The stimulus–organism–response (S-O-R) model, integrating the technological–organizational–environmental (TOE) framework, personal perceptions, personal traits, and the intention to use, was chosen as our theoretical model. Through an analysis of 272 valid questionnaires, the partial least squares structural equation modeling (PLS-SEM) was utilized to evaluate the model and test the proposed hypotheses. The results indicated that personal traits are the most influential factor shaping construction stakeholders’ intention to use, followed by personal perceptions, while external stimuli exert no direct significant impact on the intention to use. Nevertheless, personal traits and personal perceptions play a significant mediating role in the relationship between external stimuli and the intention to use, forming a noteworthy serial chain mediation. The research findings imply that in China, bolstering personal traits plays a critical role in guiding and promoting the intention to use CDW recycling products.
- 8 March 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (6) , 2262
Open AccessInvestigating the Determinants of Construction Stakeholders’ Intention to Use Construction and Demolition Waste Recycling Products Based on the S-O-R Model in China
In China, the annual generation of construction and demolition waste (CDW) has been steadily increasing, accompanied by a generally low recycling rate. To promote sustainable development, there is an urgent need to enhance the recycling of CDW. This paper aims to investigate the determinants of construction stakeholders’ intention to use CDW recycling products in China. The stimulus–organism–response (S-O-R) model, integrating the technological–organizational–environmental (TOE) framework, personal perceptions, personal traits, and the intention to use, was chosen as our theoretical model. Through an analysis of 272 valid questionnaires, the partial least squares structural equation modeling (PLS-SEM) was utilized to evaluate the model and test the proposed hypotheses. The results indicated that personal traits are the most influential factor shaping construction stakeholders’ intention to use, followed by personal perceptions, while external stimuli exert no direct significant impact on the intention to use. Nevertheless, personal traits and personal perceptions play a significant mediating role in the relationship between external stimuli and the intention to use, forming a noteworthy serial chain mediation. The research findings imply that in China, bolstering personal traits plays a critical role in guiding and promoting the intention to use CDW recycling products.
- 5 August 2023
- Published by Springer Nature
- p. 57-73
Interview Methods in Construction and Demolition Research: Based on Case Study and Recommended Best Practices
- 5 August 2023
- Published by Springer Nature
- p. 57-73
Interview Methods in Construction and Demolition Research: Based on Case Study and Recommended Best Practices
- Open Access
- 8 June 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (12) , 9304
An Implementation Framework for On-Site Shield Spoil Utilization—A Case Study of a Metro Project
A majority of metro projects have been constructed to reduce urban traffic congestion and to improve the convenience of public transportation, but these projects also produced a significant amount of engineering slag and mud. The shield construction method could improve the efficiency and safety; this technique has been frequently used in tunnel excavation projects. However, the spoil produced during the shield construction is challenging to deal with. In literature, though there has been an increasing number of studies on the technologies of utilizing shield spoil, the on-site utilization of shield spoil is still a subject of little research. This study introduced an implementation framework for the on-site utilization of shield spoil based on successful case experiences. It aims to assist project managers in efficiently implementing on-site resource utilization projects and to address the gaps in the relevant field. A case study was conducted in the Shenzhen Metro Line 13 North Extension Project; this study collected data through six semi-structured interviews and field research, analyzed the data, and constructed a framework using thematic analysis and focus group discussions. The three components of the implementation framework are project planning, project construction, and project closing, and each section describes what must be accomplished during that phase. Additionally, three recommendations—(1) combining intelligent technology to optimize the existing equipment, (2) utilizing lean technology in project execution, (3) establishing strategic partnerships with construction waste recycling enterprises—are also made for the development of the shield spoil utilization project. This study uses the Shenzhen Metro Line 13 North Extension Project as a model to theoretically underpin future research on shielding spoil on-site during resource utilization projects and to achieve the repeatable promotion of shield spoil utilization technology in Shenzhen.
- 8 June 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (12) , 9304
Open AccessAn Implementation Framework for On-Site Shield Spoil Utilization—A Case Study of a Metro Project
A majority of metro projects have been constructed to reduce urban traffic congestion and to improve the convenience of public transportation, but these projects also produced a significant amount of engineering slag and mud. The shield construction method could improve the efficiency and safety; this technique has been frequently used in tunnel excavation projects. However, the spoil produced during the shield construction is challenging to deal with. In literature, though there has been an increasing number of studies on the technologies of utilizing shield spoil, the on-site utilization of shield spoil is still a subject of little research. This study introduced an implementation framework for the on-site utilization of shield spoil based on successful case experiences. It aims to assist project managers in efficiently implementing on-site resource utilization projects and to address the gaps in the relevant field. A case study was conducted in the Shenzhen Metro Line 13 North Extension Project; this study collected data through six semi-structured interviews and field research, analyzed the data, and constructed a framework using thematic analysis and focus group discussions. The three components of the implementation framework are project planning, project construction, and project closing, and each section describes what must be accomplished during that phase. Additionally, three recommendations—(1) combining intelligent technology to optimize the existing equipment, (2) utilizing lean technology in project execution, (3) establishing strategic partnerships with construction waste recycling enterprises—are also made for the development of the shield spoil utilization project. This study uses the Shenzhen Metro Line 13 North Extension Project as a model to theoretically underpin future research on shielding spoil on-site during resource utilization projects and to achieve the repeatable promotion of shield spoil utilization technology in Shenzhen.