Jianping Zhao
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jianping Zhao has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Chunsheng Miao
School of Mechanical Engineering, Nanjing University of Technology, Nanjing 210009, China; Jiangsu Province Special Equipment Safety Supervision Inspection Institute, Nanjing 210003, China
1 shared publication Xuechao Wang
School of Mechanical Engineering, Nanjing University of Technology, Nanjing 210009, China
1 shared publication
Latest Publications
- 13 March 2012
- Published by ASME International in Journal of Pressure Vessel Technology
- Vol. 134 (2) , 021702
Risk Analysis for the Urban Buried Gas Pipeline With Fuzzy Comprehensive Assessment Method
Based on the statistical analysis from a great deal of failure cases, generally, the failure causes of buried pipeline can be classified into four factors, namely, third-party damage, erosion–corrosion damage, design and construction error, and incorrect operation. The factors influencing the failure of pipeline are complicated, varied and fuzzy. Especially, the influence factors of third-party damage of buried pipeline are of the character of fuzziness, which are difficult to express with the accurate mathematic models. In this paper, the failure factors of buried gas pipeline are first analyzed by fault tree analysis method. Then, the failure likelihood and failure consequence, two parts of the risk, are evaluated with fuzzy comprehensive assessment method, respectively. Finally, the in-service risk of the buried gas pipeline for a certain city is expressed by the risk matrix, which is established with the failure likelihood as vertical ordinate and the failure consequence as horizontal ordinate. It is concluded that there are two pipeline units belong to high risk category, 24 pipeline units belong to medium-high risk category, 160 pipeline units belong to medium risk category, and 392 pipeline units belong to low risk category.
- 13 March 2012
- Published by ASME International in Journal of Pressure Vessel Technology
- Vol. 134 (2) , 021702
Risk Analysis for the Urban Buried Gas Pipeline With Fuzzy Comprehensive Assessment Method
Based on the statistical analysis from a great deal of failure cases, generally, the failure causes of buried pipeline can be classified into four factors, namely, third-party damage, erosion–corrosion damage, design and construction error, and incorrect operation. The factors influencing the failure of pipeline are complicated, varied and fuzzy. Especially, the influence factors of third-party damage of buried pipeline are of the character of fuzziness, which are difficult to express with the accurate mathematic models. In this paper, the failure factors of buried gas pipeline are first analyzed by fault tree analysis method. Then, the failure likelihood and failure consequence, two parts of the risk, are evaluated with fuzzy comprehensive assessment method, respectively. Finally, the in-service risk of the buried gas pipeline for a certain city is expressed by the risk matrix, which is established with the failure likelihood as vertical ordinate and the failure consequence as horizontal ordinate. It is concluded that there are two pipeline units belong to high risk category, 24 pipeline units belong to medium-high risk category, 160 pipeline units belong to medium risk category, and 392 pipeline units belong to low risk category.
- 28 May 2009
- Published by ASME International in Journal of Offshore Mechanics and Arctic Engineering
- Vol. 131 (3) , 031601-5
CFD Numerical Simulation of the Submarine Pipeline With a Spoiler
Submarine pipeline is one of the most important oil transportation components; pipeline failure due to overspan is the most serious failure mechanism. There are four reasons of pipeline span formation, including erosion of seabed, bumpy seabed, submarine pipeline climbing slope, and pipeline ascending to offshore platform. The Hangzhou Bay submarine pipeline is the most important subproject of the Yong-Hu-Ning network, and it is also the biggest long-distance pipeline for crude oil in China. Due to the dynamic nature of Hangzhou Bay, including high tides and high current amplified by the shallow waters, a self-burial method was selected as the best solution. By increasing the velocity of the stream between the pipeline and the seabed, shear stress on the seabed was enhanced. This localized increase in shear stress causes the seabed under the pipe to erode more quickly and facilitates self-burial of the pipe. To facilitate self-burial, a nonmetallic vertical fin is fastened to the top of the pipeline. In this paper flow around a pipeline with and without a spoiler near a smooth wall is simulated with FLUENT version 6.1. It is found that the velocity affected the shear stress, and the height of the spoiler does not have an obvious effect on the shear stress.
- 28 May 2009
- Published by ASME International in Journal of Offshore Mechanics and Arctic Engineering
- Vol. 131 (3) , 031601-5
CFD Numerical Simulation of the Submarine Pipeline With a Spoiler
Submarine pipeline is one of the most important oil transportation components; pipeline failure due to overspan is the most serious failure mechanism. There are four reasons of pipeline span formation, including erosion of seabed, bumpy seabed, submarine pipeline climbing slope, and pipeline ascending to offshore platform. The Hangzhou Bay submarine pipeline is the most important subproject of the Yong-Hu-Ning network, and it is also the biggest long-distance pipeline for crude oil in China. Due to the dynamic nature of Hangzhou Bay, including high tides and high current amplified by the shallow waters, a self-burial method was selected as the best solution. By increasing the velocity of the stream between the pipeline and the seabed, shear stress on the seabed was enhanced. This localized increase in shear stress causes the seabed under the pipe to erode more quickly and facilitates self-burial of the pipe. To facilitate self-burial, a nonmetallic vertical fin is fastened to the top of the pipeline. In this paper flow around a pipeline with and without a spoiler near a smooth wall is simulated with FLUENT version 6.1. It is found that the velocity affected the shear stress, and the height of the spoiler does not have an obvious effect on the shear stress.