Jingqi Lai
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Jingqi Lai has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Maohui Wang
School of Civil Engineering, Southeast University, Nanjing 211189, China
2 shared publications - Qi Zhang
School of Civil Engineering, Southeast University, Nanjing 211189, China
2 shared publications - Xiaojun Wang
Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092, China
2 shared publications - Yixin Shen
School of Civil Engineering, Southeast University, Nanjing 211189, China
2 shared publications - Yuechao Pei
School of Civil Engineering, Southeast University, Nanjing 211189, China
2 shared publications
Latest Publications
- Open Access
- 15 July 2023
- Published by MDPI AG in Fractal and Fractional
- Vol. 7 (7) , 546
Determination of Integrity Index Kv in CHN-BQ Method by BP Neural Network Based on Fractal Dimension D
The integrity index Kv is the quantitative index in the CHN-BQ method, which can be determined by the acoustic wave test, volume joint number Jv, or empirical judgment. However, these methods are not convenient and require the practitioner to have extensive experience. In this study, a new quantitative evaluation of Kv is proposed to determine Kv accurately and conveniently. A method for determining the fractal dimension D based on the structural plane network simulation is proposed. A quantitative relationship between fractal dimension D and integrity index Kv is established based on the geological information from 80 sampling windows in Mingtang Tunnel. To further consider the effect of structural plane conditions on Kv, a BP neural network is constructed with the fractal dimension D and structural plane condition index R3 as input and Kv as output. The BP neural network is trained by 260 groups of tunnel data and validated by 39 groups of test data. The results show that the correlation coefficient R2 between the predicted Kvp and measured Kvm is 0.93, and the average relative error is 7.51%. In addition, the predicted Kvp from the 39 groups of data is compared with the Kvd determined directly by fractal dimension D. It can be found that the Kvd has a larger error compared with the Kvp, especially in the case of a Kv less than 0.5. Finally, the BP neural network for predicting Kv is applied to the Jiulaopo Tunnel. The maximum relative error between the measured Kvm and the predicted Kvp is 5.13%, and the average relative error is 2.71%. The BP neural network is well trained and can accurately predict Kv based on the fractal dimension D and the structural plane condition index R3.
- 15 July 2023
- Published by MDPI AG in Fractal and Fractional
- Vol. 7 (7) , 546
Open AccessDetermination of Integrity Index Kv in CHN-BQ Method by BP Neural Network Based on Fractal Dimension D
The integrity index Kv is the quantitative index in the CHN-BQ method, which can be determined by the acoustic wave test, volume joint number Jv, or empirical judgment. However, these methods are not convenient and require the practitioner to have extensive experience. In this study, a new quantitative evaluation of Kv is proposed to determine Kv accurately and conveniently. A method for determining the fractal dimension D based on the structural plane network simulation is proposed. A quantitative relationship between fractal dimension D and integrity index Kv is established based on the geological information from 80 sampling windows in Mingtang Tunnel. To further consider the effect of structural plane conditions on Kv, a BP neural network is constructed with the fractal dimension D and structural plane condition index R3 as input and Kv as output. The BP neural network is trained by 260 groups of tunnel data and validated by 39 groups of test data. The results show that the correlation coefficient R2 between the predicted Kvp and measured Kvm is 0.93, and the average relative error is 7.51%. In addition, the predicted Kvp from the 39 groups of data is compared with the Kvd determined directly by fractal dimension D. It can be found that the Kvd has a larger error compared with the Kvp, especially in the case of a Kv less than 0.5. Finally, the BP neural network for predicting Kv is applied to the Jiulaopo Tunnel. The maximum relative error between the measured Kvm and the predicted Kvp is 5.13%, and the average relative error is 2.71%. The BP neural network is well trained and can accurately predict Kv based on the fractal dimension D and the structural plane condition index R3.
- Open Access
- 22 June 2023
- Published by MDPI AG in Fractal and Fractional
- Vol. 7 (7) , 496
A New Perspective on Predicting Roughness of Discontinuity from Fractal Dimension D of Outcrops
In tunnel construction, predicting the roughness of discontinuity is significant for preventing the collapse of the excavation face. However, currently, we are unable to use a parameter with invariant properties to quantify and predict the roughness of discontinuity. Fractal dimension D is one such parameter that be used to characterize the roughness of discontinuity. The study proposes a new method to predict the roughness of discontinuity from the fractal dimension D of outcrops. The measurement method of the coordinates of outcrops is firstly summarized, and the most suitable method of calculating fractal dimension D is then provided. For characterizing the spatial variability of fractal dimension D, the random field of fractal dimension D is discretized, and the prediction model is then established based on Bayesian theory. The proposed method is applied to one tunnel for predicting the roughness of discontinuity, and the results indicate that the relative errors of prediction are less than 1.5%. The sensitivities of correlation function and discontinuity size are analyzed. It is found that the different correlation functions have no obvious effect on the prediction results, and the proposed method is well applied to relatively large sizes of discontinuity.
- 22 June 2023
- Published by MDPI AG in Fractal and Fractional
- Vol. 7 (7) , 496
Open AccessA New Perspective on Predicting Roughness of Discontinuity from Fractal Dimension D of Outcrops
In tunnel construction, predicting the roughness of discontinuity is significant for preventing the collapse of the excavation face. However, currently, we are unable to use a parameter with invariant properties to quantify and predict the roughness of discontinuity. Fractal dimension D is one such parameter that be used to characterize the roughness of discontinuity. The study proposes a new method to predict the roughness of discontinuity from the fractal dimension D of outcrops. The measurement method of the coordinates of outcrops is firstly summarized, and the most suitable method of calculating fractal dimension D is then provided. For characterizing the spatial variability of fractal dimension D, the random field of fractal dimension D is discretized, and the prediction model is then established based on Bayesian theory. The proposed method is applied to one tunnel for predicting the roughness of discontinuity, and the results indicate that the relative errors of prediction are less than 1.5%. The sensitivities of correlation function and discontinuity size are analyzed. It is found that the different correlation functions have no obvious effect on the prediction results, and the proposed method is well applied to relatively large sizes of discontinuity.