Kuo-Yu Huang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Kuo-Yu Huang has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Min-Yuan Cheng
National Taiwan Univ. of Science and Technology
2 shared publications - Hung-Ming Chen
Natl Taiwan Univ Sci & Technol, Dept Construct Engn, Taipei 106, Taiwan
1 shared publication Merciawati Hutomo
Master Student, Dept. of Civil and Construction Engineering, National Taiwan Univ. of Science and Technology, Taipei 10607, Taiwan, R.O.C.
1 shared publication
Latest Publications
- 1 September 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 144 (9)
Multiobjective Dynamic-Guiding PSO for Optimizing Work Shift Schedules
Work shift system is commonly used in construction projects to meet project deadlines. However, evening and night shifts raise the risk of adverse events and thus must be used to the minimum extent feasible. The three objectives of the work shift problem are to minimize project duration, project cost, and total evening and night shift work hours while effectively handling relevant scheduling constraints. This study proposes a new multiobjective approach that hybridizes dynamic guiding, chaotic search, and particle swarm optimization (PSO) functions, named multiobjective dynamic guiding chaotic search particle swarm optimization (MO-DCPSO). The approach can overcome the drawbacks of PSO in solving discrete domain problems and recruit more nondominated solutions kept in the archive. A real case was employed to verify the robustness and efficiency of the proposed approach. The result also indicated that MO-DCPSO is more fitting for solving practical project control issues.
- 1 September 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 144 (9)
Multiobjective Dynamic-Guiding PSO for Optimizing Work Shift Schedules
Work shift system is commonly used in construction projects to meet project deadlines. However, evening and night shifts raise the risk of adverse events and thus must be used to the minimum extent feasible. The three objectives of the work shift problem are to minimize project duration, project cost, and total evening and night shift work hours while effectively handling relevant scheduling constraints. This study proposes a new multiobjective approach that hybridizes dynamic guiding, chaotic search, and particle swarm optimization (PSO) functions, named multiobjective dynamic guiding chaotic search particle swarm optimization (MO-DCPSO). The approach can overcome the drawbacks of PSO in solving discrete domain problems and recruit more nondominated solutions kept in the archive. A real case was employed to verify the robustness and efficiency of the proposed approach. The result also indicated that MO-DCPSO is more fitting for solving practical project control issues.
- 19 February 2011
- Published by Springer Nature in Optimization Letters
- Vol. 6 (4) , 719-729
Dynamic guiding particle swarm optimization with embedded chaotic search for solving multidimensional problems
- 19 February 2011
- Published by Springer Nature in Optimization Letters
- Vol. 6 (4) , 719-729
Dynamic guiding particle swarm optimization with embedded chaotic search for solving multidimensional problems