Handoko Rusiana Iskandar
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Handoko Rusiana Iskandar has a total of 25 co-authors. Here are the top co-authors by number of shared publications:
Ahmad Daelami
Universitas Jenderal Achmad Yani, Indonesia
4 shared publicationsEen Taryana
Universitas Jenderal Achmad Yani
3 shared publicationsAgnia Iman
Universitas Jenderal Achmad Yani
1 shared publication- Ahmad Daelami
Universitas Jenderal Acmad Yani
1 shared publication - Atik Charisma
Universitas Jenderal Achmad Yani
1 shared publication - Atik Charisma
Universitas Jenderal Achmad Yani
1 shared publication
Latest Publications
- Open Access
- 29 December 2025
- Published by Fakultas Teknik (FT) Universitas Jenderal Achmad Yani (Unjani) in Jurnal Teknik: Media Pengembangan Ilmu dan Aplikasi Teknik
- Vol. 24 (2) , 146-152
Techno-Economic Assessment of Dimethyl Ether (DME)Production through Methanol Dehydration Process
Dimethyl Ether (DME) is a clean, colorless gas that serves as a potential alternative to liquefied petroleum gas (LPG). This study presents a comprehensive techno-economic assessment of DME production via methanol dehydration with a plant capacity of 20,000 tons per year. The process utilizes an alumina–silicate catalyst in a multitube fixed-bed reactor operating at 300–350°C and 30 bar. Simulation results show a methanol conversion of 85% per pass, achieving a final DME purity exceeding 99.5%. The total capital investment (CAPEX) is estimated at USD 12.8 million, with annual operating costs (OPEX) of approximately USD 13 million. Economic indicators reveal a Net Present Value (NPV) of USD 5.2 million, an Internal Rate of Return (IRR) of 14.5%, a Return on Investment (ROI) between 15–17%, and a payback period of six years. The break-even point (BEP) is reached at 60–65% of design capacity. The findings indicate that the DME production process is technically feasible and economically attractive for industrial implementation, supporting Indonesia’s clean energy transition and reduction of LPG imports.
- 29 December 2025
- Published by Fakultas Teknik (FT) Universitas Jenderal Achmad Yani (Unjani) in Jurnal Teknik: Media Pengembangan Ilmu dan Aplikasi Teknik
- Vol. 24 (2) , 146-152
Open AccessTechno-Economic Assessment of Dimethyl Ether (DME)Production through Methanol Dehydration Process
Dimethyl Ether (DME) is a clean, colorless gas that serves as a potential alternative to liquefied petroleum gas (LPG). This study presents a comprehensive techno-economic assessment of DME production via methanol dehydration with a plant capacity of 20,000 tons per year. The process utilizes an alumina–silicate catalyst in a multitube fixed-bed reactor operating at 300–350°C and 30 bar. Simulation results show a methanol conversion of 85% per pass, achieving a final DME purity exceeding 99.5%. The total capital investment (CAPEX) is estimated at USD 12.8 million, with annual operating costs (OPEX) of approximately USD 13 million. Economic indicators reveal a Net Present Value (NPV) of USD 5.2 million, an Internal Rate of Return (IRR) of 14.5%, a Return on Investment (ROI) between 15–17%, and a payback period of six years. The break-even point (BEP) is reached at 60–65% of design capacity. The findings indicate that the DME production process is technically feasible and economically attractive for industrial implementation, supporting Indonesia’s clean energy transition and reduction of LPG imports.
- Open Access
- 25 July 2025
- Published by Fakultas Teknik, Universitas Negeri Makassar in Jurnal Media Elektrik
- Vol. 22 (3) , 211-220
RENEWABLE ENERGY SOLUTION: SOLAR PHOTOVOLTAIC SYSTEM DESIGN FOR SUPPLYING REMOTE TERMINAL UNIT PANELS IN THE KEDUNG PUTRI IRRIGATION SYSTEM
The Kedung Putri Dam Irrigation Area is situated in the Purworejo Regency, Central Java Province. It is an irrigation system employed for agricultural production, although it is significantly distant from grid electrical supplies. Photovoltaic (PV) power plants, utilizing renewable energy sources, exhibit an average solar energy potential of 5.041 kWh/m2/day. The PV system was designed in six steps, from data collecting to performance evaluation. The method started with location data, meteorological data (solar irradiation and temperature), and the Remote Terminal Unit (RTU) panel energy consumption. PVsyst 7.2 calculates daily load capacity, size, and number of solar panels depending on local irradiation. This simulation models system performance using environmental conditions and outputs technical specifications, estimated energy production, and solar fraction. Based on the calculations, PVSyst modelling, and this paper's analysis, the following conclusions were obtained to meet the objectives: RTU panels at B.Ks.1, B.Kd.1, B.Kd.3, and B.Kd.7.Tg must have a minimum PV capacity of 300 Wp and a maximum of 450 Wp with 375 Ah; 12 V battery operation. SCC unit with 20 A load current and 600 W nominal operational power (24 V battery) is installed. Preliminary PVsyst software simulations show that the four locations average 415.125 kWh/year. The four locations utilise 400.5 kWh/year and average 71.5% performance. Average solar fraction ratio of four places is 68.5%; energy lost is 184.23 kWh/year. A thorough review of the PV system's performance shows that 300 Wp has a higher PR value than 450 Wp. The PV capacity has an average annual SF value of 0.685 across the four locations, indicating that the solar power system can supply 68.5% of the RTU panels' power, while 31.5% requires other energy sources or more batteries.
- 25 July 2025
- Published by Fakultas Teknik, Universitas Negeri Makassar in Jurnal Media Elektrik
- Vol. 22 (3) , 211-220
Open AccessRENEWABLE ENERGY SOLUTION: SOLAR PHOTOVOLTAIC SYSTEM DESIGN FOR SUPPLYING REMOTE TERMINAL UNIT PANELS IN THE KEDUNG PUTRI IRRIGATION SYSTEM
The Kedung Putri Dam Irrigation Area is situated in the Purworejo Regency, Central Java Province. It is an irrigation system employed for agricultural production, although it is significantly distant from grid electrical supplies. Photovoltaic (PV) power plants, utilizing renewable energy sources, exhibit an average solar energy potential of 5.041 kWh/m2/day. The PV system was designed in six steps, from data collecting to performance evaluation. The method started with location data, meteorological data (solar irradiation and temperature), and the Remote Terminal Unit (RTU) panel energy consumption. PVsyst 7.2 calculates daily load capacity, size, and number of solar panels depending on local irradiation. This simulation models system performance using environmental conditions and outputs technical specifications, estimated energy production, and solar fraction. Based on the calculations, PVSyst modelling, and this paper's analysis, the following conclusions were obtained to meet the objectives: RTU panels at B.Ks.1, B.Kd.1, B.Kd.3, and B.Kd.7.Tg must have a minimum PV capacity of 300 Wp and a maximum of 450 Wp with 375 Ah; 12 V battery operation. SCC unit with 20 A load current and 600 W nominal operational power (24 V battery) is installed. Preliminary PVsyst software simulations show that the four locations average 415.125 kWh/year. The four locations utilise 400.5 kWh/year and average 71.5% performance. Average solar fraction ratio of four places is 68.5%; energy lost is 184.23 kWh/year. A thorough review of the PV system's performance shows that 300 Wp has a higher PR value than 450 Wp. The PV capacity has an average annual SF value of 0.685 across the four locations, indicating that the solar power system can supply 68.5% of the RTU panels' power, while 31.5% requires other energy sources or more batteries.
- Open Access
- 2 June 2025
- Published by Fakultas Teknik (FT) Universitas Jenderal Achmad Yani (Unjani) in Jurnal Teknik: Media Pengembangan Ilmu dan Aplikasi Teknik
- Vol. 24 (1) , 84-93
A Review: Reliability Assessment of Isolated Phase Busduct Through FMEA and RCFA Methodologies
This research discuss the reliability of the Isolated Phase Busduct (IPB) geothermal generating unit still needs to be improved because the same disturbances still occur, where in the 2018-2023 period these disturbances have contributed to a Loss Production Opportunity of around 65 billion rupiah. Therefore, this research will provide suggestions or suggestions for what factors need to be improved so that the reliability of IPB in each geothermal power plant unit increases. The methods used in this research are failure mode and effect analysis (FMEA) and the Root Cause Failure Analysis (RCFA) method, where FMEA helps in identifying potential failures and determining mitigation priorities and determining the value of the Risk Priority Number (RPN), Root Cause Failure Analysis (RCFA) reveals the main causes of failures that have occurred, from these two methods it is known that the disturbances that occur can actually be identified earlier by 91.2% as well as factors such as manufacture design, aging equipment, improper installation, Lack of Quality Control, and inappropriate mobilization must be eliminated in an effort to increase IPB's reliability where these factors must be considered from the project phase to the operational phase.
- 2 June 2025
- Published by Fakultas Teknik (FT) Universitas Jenderal Achmad Yani (Unjani) in Jurnal Teknik: Media Pengembangan Ilmu dan Aplikasi Teknik
- Vol. 24 (1) , 84-93
Open AccessA Review: Reliability Assessment of Isolated Phase Busduct Through FMEA and RCFA Methodologies
This research discuss the reliability of the Isolated Phase Busduct (IPB) geothermal generating unit still needs to be improved because the same disturbances still occur, where in the 2018-2023 period these disturbances have contributed to a Loss Production Opportunity of around 65 billion rupiah. Therefore, this research will provide suggestions or suggestions for what factors need to be improved so that the reliability of IPB in each geothermal power plant unit increases. The methods used in this research are failure mode and effect analysis (FMEA) and the Root Cause Failure Analysis (RCFA) method, where FMEA helps in identifying potential failures and determining mitigation priorities and determining the value of the Risk Priority Number (RPN), Root Cause Failure Analysis (RCFA) reveals the main causes of failures that have occurred, from these two methods it is known that the disturbances that occur can actually be identified earlier by 91.2% as well as factors such as manufacture design, aging equipment, improper installation, Lack of Quality Control, and inappropriate mobilization must be eliminated in an effort to increase IPB's reliability where these factors must be considered from the project phase to the operational phase.
- Open Access
- 5 May 2025
- Published by LPPM Universitas Khairun in PROtek : Jurnal Ilmiah Teknik Elektro
- Vol. 12 (2) , 89-98
Charging Station for Two-wheelers Electric Vehicle Powered by Photovoltaic System
Indonesia has significant solar energy potential, ranging from 4.88-5.78 kWh/m2 /day with a production of 444 GWh by 2022, which is supported by various government initiatives and research projects focused on renewable energy-based two-wheeled electric vehicles. The increasing prevalence of electric vehicles in Indonesia necessitates the adaptation of photovoltaic (PV)-based renewable energy infrastructure to provide power sources for battery-operated two-wheeled electric vehicle charging stations. This paper presents proposals for the implementation of two-wheeled electric vehicles, utilizing various battery technologies combined with PV-based renewable energy systems, incorporated into various plans and schemes. The research methodology was developed by evaluating the electric vehicle battery requirements and system component capacities, while the charging cycle describes the relationship between the battery capacity and the capacity of 200 Wp, 400 Wp, and 500 Wp photovoltaic panels. The calculation results show that the charging system uses various PV panel capacities. The 200 Wp PV panel requires the longest charging duration. The 400 Wp photovoltaic panel serves as an intermediate charging station. The 500 Wp photovoltaic panel shows the fastest charging duration among the three types of panels, ranging from 1 to 3.7 hours, depending on the battery load rating of the electric wheeled vehicle. In addition, the proposed PV charging system provides various battery capacity options with consideration of autonomous time (1-4 days) where the charging time of 4 days for electric vehicle battery capacity 2000 Wh will be in line with the battery demand in the charging station.
- 5 May 2025
- Published by LPPM Universitas Khairun in PROtek : Jurnal Ilmiah Teknik Elektro
- Vol. 12 (2) , 89-98
Open AccessCharging Station for Two-wheelers Electric Vehicle Powered by Photovoltaic System
Indonesia has significant solar energy potential, ranging from 4.88-5.78 kWh/m2 /day with a production of 444 GWh by 2022, which is supported by various government initiatives and research projects focused on renewable energy-based two-wheeled electric vehicles. The increasing prevalence of electric vehicles in Indonesia necessitates the adaptation of photovoltaic (PV)-based renewable energy infrastructure to provide power sources for battery-operated two-wheeled electric vehicle charging stations. This paper presents proposals for the implementation of two-wheeled electric vehicles, utilizing various battery technologies combined with PV-based renewable energy systems, incorporated into various plans and schemes. The research methodology was developed by evaluating the electric vehicle battery requirements and system component capacities, while the charging cycle describes the relationship between the battery capacity and the capacity of 200 Wp, 400 Wp, and 500 Wp photovoltaic panels. The calculation results show that the charging system uses various PV panel capacities. The 200 Wp PV panel requires the longest charging duration. The 400 Wp photovoltaic panel serves as an intermediate charging station. The 500 Wp photovoltaic panel shows the fastest charging duration among the three types of panels, ranging from 1 to 3.7 hours, depending on the battery load rating of the electric wheeled vehicle. In addition, the proposed PV charging system provides various battery capacity options with consideration of autonomous time (1-4 days) where the charging time of 4 days for electric vehicle battery capacity 2000 Wh will be in line with the battery demand in the charging station.
- Open Access
- 22 August 2024
- Published by Yayasan Banu Samsudin in Join: Journal of Social Science
- Vol. 1 (5) , 144-154
Modelling of A Hybrid Photovoltaic-Grid Source on Public Electric Vehicle Charging Station (PEVCS)
His study presents a comprehensive model of a hybrid photovoltaic (PV)-grid system implemented in a Public Electric Vehicle Charging Station (PEVCS). As the demand for electric vehicles (EVs) continues to rise, the integration of renewable energy sources such as photovoltaic systems into charging infrastructure becomes increasingly important. The proposed model aims to optimize energy usage by combining solar energy with grid electricity, reducing dependency on the conventional power grid while ensuring the reliability of the charging station. A detailed simulation of the hybrid system is conducted to analyze its performance under various conditions, including different solar irradiance levels and grid availability. The results demonstrate that the hybrid PV-grid system can effectively reduce operational costs and environmental impact while providing stable and efficient energy supply to EVs. Additionally, the study explores the potential challenges and solutions related to the implementation of such systems in urban settings. This research contributes to the development of sustainable charging infrastructures and supports the broader adoption of electric vehicles.
- 22 August 2024
- Published by Yayasan Banu Samsudin in Join: Journal of Social Science
- Vol. 1 (5) , 144-154
Open AccessModelling of A Hybrid Photovoltaic-Grid Source on Public Electric Vehicle Charging Station (PEVCS)
His study presents a comprehensive model of a hybrid photovoltaic (PV)-grid system implemented in a Public Electric Vehicle Charging Station (PEVCS). As the demand for electric vehicles (EVs) continues to rise, the integration of renewable energy sources such as photovoltaic systems into charging infrastructure becomes increasingly important. The proposed model aims to optimize energy usage by combining solar energy with grid electricity, reducing dependency on the conventional power grid while ensuring the reliability of the charging station. A detailed simulation of the hybrid system is conducted to analyze its performance under various conditions, including different solar irradiance levels and grid availability. The results demonstrate that the hybrid PV-grid system can effectively reduce operational costs and environmental impact while providing stable and efficient energy supply to EVs. Additionally, the study explores the potential challenges and solutions related to the implementation of such systems in urban settings. This research contributes to the development of sustainable charging infrastructures and supports the broader adoption of electric vehicles.
- Open Access
- 21 December 2023
- Published by Politeknik Negeri Padang in Elektron : Jurnal Ilmiah
- p. 27-35
Feasibility and Design of Grid-connected Floating PVs in West Java, Indonesia
Elektron Jurnal Ilmiah (EJI) is a peer-reviewed journal which is published by Department of Electrical Engineering, Politeknik Negeri Padang. The ISSN number is 2085-6989. EJI published the first edit
- 21 December 2023
- Published by Politeknik Negeri Padang in Elektron : Jurnal Ilmiah
- p. 27-35
Open AccessFeasibility and Design of Grid-connected Floating PVs in West Java, Indonesia
Elektron Jurnal Ilmiah (EJI) is a peer-reviewed journal which is published by Department of Electrical Engineering, Politeknik Negeri Padang. The ISSN number is 2085-6989. EJI published the first edit
- Open Access
- 9 December 2023
- Published by Universitas Mercu Buana in SINERGI
- Vol. 28 (1) , 1-12
Modelling and analysis of rooftop PV as an energy optimization of flat roof and gable roof mounting system
Photovoltaic (PV) systems are designed for both communal and self-installation. PV systems are intended for both communal and standalone installations. Installation is required not only in industry and commerce, but also in the growth of energy potential at Universitas Jenderal Achmad Yani. The focus of this research is rooftop PV modelling and analysis at Universitas Jenderal Achmad Yani. Because the ground mounting system could not be done due to limited land, a rooftop solar power-producing system was created. Data gathering is done as part of unique research that takes into account numerous technological criteria for efficiency. System analysis conducted by modelling and simulation, which will make use of a variety of tools linked to this PV system. Data was gathered from similar studies while accounting for numerous technological variables such as modelling and efficiency. K2Base system was used to model flat roofs with concrete roof types and gable roofs with tile roof types. The mounting type, wind load, truss load, and ballast were all taken into account in the design. This article also calculates PV panel configurations and component capacities. There are many different panels that can be constructed from each model. With a maximum roof area of 837.52 m2, 33 to 350 PV panels may be used. The number of inverters is changed to provide outputs of 10 kW, 25 kW, and 50 kW based on the calculations' findings. With differences in autonomous days, the number of batteries obtained has an average of more than 200 batteries.
- 9 December 2023
- Published by Universitas Mercu Buana in SINERGI
- Vol. 28 (1) , 1-12
Open AccessModelling and analysis of rooftop PV as an energy optimization of flat roof and gable roof mounting system
Photovoltaic (PV) systems are designed for both communal and self-installation. PV systems are intended for both communal and standalone installations. Installation is required not only in industry and commerce, but also in the growth of energy potential at Universitas Jenderal Achmad Yani. The focus of this research is rooftop PV modelling and analysis at Universitas Jenderal Achmad Yani. Because the ground mounting system could not be done due to limited land, a rooftop solar power-producing system was created. Data gathering is done as part of unique research that takes into account numerous technological criteria for efficiency. System analysis conducted by modelling and simulation, which will make use of a variety of tools linked to this PV system. Data was gathered from similar studies while accounting for numerous technological variables such as modelling and efficiency. K2Base system was used to model flat roofs with concrete roof types and gable roofs with tile roof types. The mounting type, wind load, truss load, and ballast were all taken into account in the design. This article also calculates PV panel configurations and component capacities. There are many different panels that can be constructed from each model. With a maximum roof area of 837.52 m2, 33 to 350 PV panels may be used. The number of inverters is changed to provide outputs of 10 kW, 25 kW, and 50 kW based on the calculations' findings. With differences in autonomous days, the number of batteries obtained has an average of more than 200 batteries.
- Open Access
- 30 November 2023
- Published by Universitas Bangka Belitung in ELECTRON : Jurnal Ilmiah Teknik Elektro
- Vol. 4 (2) , 78-88
Techno-economic Analysis and Optimization of Renewable Energy Forecasting at Universitas Jenderal Achmad Yani
Ketersediaan energi listrik merupakan jaminan sebagai sumber keberlanjutan operasional di kehidupan sehari-hari salah satunya di lingkungan pendidikan. Potensi instalasi energi terbarukan yang semakin mudah mendorong tujuan peningkatan instalasi menjadi murah. Universitas Jenderal Achmad Yani salah satu kampus yang berpotensi memanfaatkan energi terbarukan dan memiliki peranan dalam wawasan lingkungan sehingga sesuai dengan visi universitas di masa yang akan datang. Latarbelakang tersebut suatu desain pembangkit hibrida meliputi photovoltaic (PV), Diesel, Baterai diusulkan sebagai pembangkit listrik alternatif sebagai penunjang sumber energi konvensional. Namun perlu dilihat estimasi modal dan keuntungan yang perlu dipertimbangkan dalam jangka panjang. Dalam makalah ini, suatu pembangkit hibrida menggunakan dua skenario yaitu terhubung grid dan tanpa terhubung grid. Pemodelan dan simulasi dibuat dengan harga Net Present Cost (NPC) berdasarkan panduan perencanaan instalasi PV atap Kementrian Energi dan Sumber Daya Mineral (ESDM) dan estimasi inflasi dari kementrian keuangan republik Indonesia. Selain itu produksi dan konsumsi energi listrik yang dibutuhkan untuk contoh gedung yang dipilih dihasilkan hingga kontribusi energi yang dihasilkan dalam simulasi tersebut dipaparkan. Pemodelan pembangkit Hibrida pada gedung Fakultas Ilmu dan Teknologi Kesehatan dan gedung Rektorat Universitas Jenderal Achmad Yani telah dilakukan. Hasil simulasi menunjukkan biaya NPC untuk 25 tahun mendatang diperkirakan Rp 1.047.534.000, dengan total produksi energi listrik 729.807 kWh/tahun dengan kontribusi energi terbarukan mencapai >91.4%. Lebih lanjut pandangan dari segi teknis dan ekonomis, secara efektif, dan efisien sistem pembangkit hibrida terhubung jaringan PT. PLN (Persero) direkomendasikan
- 30 November 2023
- Published by Universitas Bangka Belitung in ELECTRON : Jurnal Ilmiah Teknik Elektro
- Vol. 4 (2) , 78-88
Open AccessTechno-economic Analysis and Optimization of Renewable Energy Forecasting at Universitas Jenderal Achmad Yani
Ketersediaan energi listrik merupakan jaminan sebagai sumber keberlanjutan operasional di kehidupan sehari-hari salah satunya di lingkungan pendidikan. Potensi instalasi energi terbarukan yang semakin mudah mendorong tujuan peningkatan instalasi menjadi murah. Universitas Jenderal Achmad Yani salah satu kampus yang berpotensi memanfaatkan energi terbarukan dan memiliki peranan dalam wawasan lingkungan sehingga sesuai dengan visi universitas di masa yang akan datang. Latarbelakang tersebut suatu desain pembangkit hibrida meliputi photovoltaic (PV), Diesel, Baterai diusulkan sebagai pembangkit listrik alternatif sebagai penunjang sumber energi konvensional. Namun perlu dilihat estimasi modal dan keuntungan yang perlu dipertimbangkan dalam jangka panjang. Dalam makalah ini, suatu pembangkit hibrida menggunakan dua skenario yaitu terhubung grid dan tanpa terhubung grid. Pemodelan dan simulasi dibuat dengan harga Net Present Cost (NPC) berdasarkan panduan perencanaan instalasi PV atap Kementrian Energi dan Sumber Daya Mineral (ESDM) dan estimasi inflasi dari kementrian keuangan republik Indonesia. Selain itu produksi dan konsumsi energi listrik yang dibutuhkan untuk contoh gedung yang dipilih dihasilkan hingga kontribusi energi yang dihasilkan dalam simulasi tersebut dipaparkan. Pemodelan pembangkit Hibrida pada gedung Fakultas Ilmu dan Teknologi Kesehatan dan gedung Rektorat Universitas Jenderal Achmad Yani telah dilakukan. Hasil simulasi menunjukkan biaya NPC untuk 25 tahun mendatang diperkirakan Rp 1.047.534.000, dengan total produksi energi listrik 729.807 kWh/tahun dengan kontribusi energi terbarukan mencapai >91.4%. Lebih lanjut pandangan dari segi teknis dan ekonomis, secara efektif, dan efisien sistem pembangkit hibrida terhubung jaringan PT. PLN (Persero) direkomendasikan
- Open Access
- 13 September 2023
- Published by Politeknik Negeri Bandung in JITEL (Jurnal Ilmiah Telekomunikasi, Elektronika, dan Listrik Tenaga)
- Vol. 3 (3) , 181-190
Overcurrent and ground fault relay protection settings at tranformator-1 150kV/20kV Braga substation
The occurrence of a malfunction at the substation results in power outages and losses in the electrical energy distribution system to consumers. Many tests are carried out to see the performance of the protection system, including the parameters of the over current relay (OCR) and ground fault relay (GFR) in the electrical energy distribution system. This research aims to analyze OCR and GFR values, analyze OCR setting, drop-off, and pick-up values, and analyze OCR time characteristics using DigSilent Power Factory 15.1 software based on existing equipment specification data at the Braga substation. The results show an OCR accuracy level of around 94% on the 20 kV and 150 kV sides. Meanwhile, 92.39% on the 20 kV GFR side and 94.87% on the 150 kV side. The setting value for the pick-up current is 0.92 A on the 20 kV side of the GFR and the drop-off current is 0.85 A on the 150 kV side with a pick-up current of 0.39 A and a drop-up current of 0.37 A. Setting a value on the 20kV side is greater than on the 150 kV side due to the difference in current transformer ratio values. The simulation results show that the OCR and GFR characteristic curves on both sides meet the criteria for a protection system with good performance.
- 13 September 2023
- Published by Politeknik Negeri Bandung in JITEL (Jurnal Ilmiah Telekomunikasi, Elektronika, dan Listrik Tenaga)
- Vol. 3 (3) , 181-190
Open AccessOvercurrent and ground fault relay protection settings at tranformator-1 150kV/20kV Braga substation
The occurrence of a malfunction at the substation results in power outages and losses in the electrical energy distribution system to consumers. Many tests are carried out to see the performance of the protection system, including the parameters of the over current relay (OCR) and ground fault relay (GFR) in the electrical energy distribution system. This research aims to analyze OCR and GFR values, analyze OCR setting, drop-off, and pick-up values, and analyze OCR time characteristics using DigSilent Power Factory 15.1 software based on existing equipment specification data at the Braga substation. The results show an OCR accuracy level of around 94% on the 20 kV and 150 kV sides. Meanwhile, 92.39% on the 20 kV GFR side and 94.87% on the 150 kV side. The setting value for the pick-up current is 0.92 A on the 20 kV side of the GFR and the drop-off current is 0.85 A on the 150 kV side with a pick-up current of 0.39 A and a drop-up current of 0.37 A. Setting a value on the 20kV side is greater than on the 150 kV side due to the difference in current transformer ratio values. The simulation results show that the OCR and GFR characteristic curves on both sides meet the criteria for a protection system with good performance.
- Open Access
- 7 August 2023
- Published by Universitas Negeri Padang in JTEIN: Jurnal Teknik Elektro Indonesia
- Vol. 4 (2) , 829-840
Renewable Energy Contribution Based on Microgrid Using Photovoltaic and Wind Turbine Scenario
Indonesia's renewable energy mix offers an alternative to conventional fossil fuels. Indonesia has made a significant commitment to the role of exploiting this new energy in accordance with the Paris Agreement. This paper proposes the design of a microgrid architecture for a solar and wind hybrid power plant with grid-connected configuration and micro-scale power plant modeling in Ciheras Village, Cipatujah District, Tasikmalaya Regency, West Java. This architecture is divided into three scenarios in order to determine the best design qualities. The first scenario involves 50% photovoltaic (PV) and 50% wind turbine (WT), the second 60% PV and 40% WT, and the third 70% PV and 30% WT. The findings of the grid-connected microgrid were compared using supporting software, HOMER Pro. The various scenarios yielded performance analysis and renewable energy contribution. Modeling, calculation, simulation, and analysis demonstrate that the first scenario's potential energy output produces 25,655 kWh/year with an 88.2% Renewable Fraction (RF). The second scenario generates 26,194 kWh of energy per year, with a renewable fraction of 87.8%. The third scenario is the best based on the participation and role of distributed energy (PV-WT), with a higher amount of energy output of 30,691 kWh/year and a higher renewable proportion of 89%.
- 7 August 2023
- Published by Universitas Negeri Padang in JTEIN: Jurnal Teknik Elektro Indonesia
- Vol. 4 (2) , 829-840
Open AccessRenewable Energy Contribution Based on Microgrid Using Photovoltaic and Wind Turbine Scenario
Indonesia's renewable energy mix offers an alternative to conventional fossil fuels. Indonesia has made a significant commitment to the role of exploiting this new energy in accordance with the Paris Agreement. This paper proposes the design of a microgrid architecture for a solar and wind hybrid power plant with grid-connected configuration and micro-scale power plant modeling in Ciheras Village, Cipatujah District, Tasikmalaya Regency, West Java. This architecture is divided into three scenarios in order to determine the best design qualities. The first scenario involves 50% photovoltaic (PV) and 50% wind turbine (WT), the second 60% PV and 40% WT, and the third 70% PV and 30% WT. The findings of the grid-connected microgrid were compared using supporting software, HOMER Pro. The various scenarios yielded performance analysis and renewable energy contribution. Modeling, calculation, simulation, and analysis demonstrate that the first scenario's potential energy output produces 25,655 kWh/year with an 88.2% Renewable Fraction (RF). The second scenario generates 26,194 kWh of energy per year, with a renewable fraction of 87.8%. The third scenario is the best based on the participation and role of distributed energy (PV-WT), with a higher amount of energy output of 30,691 kWh/year and a higher renewable proportion of 89%.