F. J. Cantero
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
F. J. Cantero has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- C. Casas
Departamento de Ingeniería Química y Tecnología del Medio Ambiente, Universidad de Valladolid, Spain;;;;;
1 shared publication - D. del Barrio
Departamento de Ingeniería Química y Tecnología del Medio Ambiente, Universidad de Valladolid, Spain;;;;;
1 shared publication - Fernando Fernandez-Polanco
Department of Chemical Engineering and Environmental Technology, University of Valladolid, Valladolid, Spain
1 shared publication - J. Serrat
SOREA – Aguas de Barcelona, Torre Agbar. Av. Diagonal 211, 080118, Barcelona, Spain;;
1 shared publication - L. Panizo
SOREA – Aguas de Barcelona, Torre Agbar. Av. Diagonal 211, 080118, Barcelona, Spain;;
1 shared publication - Maria Fernandez-Polanco
Department of Chemical Engineering and Environmental Technology, University of Valladolid, 47013 Valladolid, Spain
1 shared publication
Latest Publications
- 1 April 2008
- Published by IWA Publishing in Water Science & Technology
- Vol. 57 (8) , 1221-1226
Continuous thermal hydrolysis and energy integration in sludge anaerobic digestion plants
A thermal hydrolysis pilot plant with direct steam injection heating was designed and constructed. In a first period the equipment was operated in batch to verify the effect of sludge type, pressure and temperature, residence time and solids concentration. Optimal operation conditions were reached for secondary sludge at 170°C, 7 bar and 30 minutes residence time, obtaining a disintegration factor higher than 10, methane production increase by 50% and easy centrifugation In a second period the pilot plant was operated working with continuous feed, testing the efficiency by using two continuous anaerobic digester operating in the mesophilic and thermophilic range. Working at 12 days residence time, biogas production increases by 40–50%. Integrating the energy transfer it is possible to design a self-sufficient system that takes advantage of this methane increase to produce 40% more electric energy.
- 1 April 2008
- Published by IWA Publishing in Water Science & Technology
- Vol. 57 (8) , 1221-1226
Continuous thermal hydrolysis and energy integration in sludge anaerobic digestion plants
A thermal hydrolysis pilot plant with direct steam injection heating was designed and constructed. In a first period the equipment was operated in batch to verify the effect of sludge type, pressure and temperature, residence time and solids concentration. Optimal operation conditions were reached for secondary sludge at 170°C, 7 bar and 30 minutes residence time, obtaining a disintegration factor higher than 10, methane production increase by 50% and easy centrifugation In a second period the pilot plant was operated working with continuous feed, testing the efficiency by using two continuous anaerobic digester operating in the mesophilic and thermophilic range. Working at 12 days residence time, biogas production increases by 40–50%. Integrating the energy transfer it is possible to design a self-sufficient system that takes advantage of this methane increase to produce 40% more electric energy.