Rui Kang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Rui Kang has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Genda Chen
Department of Civil, Architectural and Environmental Engineering, Missouri University of Science and Technology, Rolla, MO 65401, USA
1 shared publication Hao Long
M.S. Student, Dept. of Bridge Engineering, School of Civil Engineering, Southwest Jiaotong Univ., 111 Section of the Northbound 1, Second Ring Rd., Chengdu, Sichuan 610031, China
1 shared publication- Hongye Gou
Department of Bridge Engineering, School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
1 shared publication - Qianhui Pu
School of Civil Engineering, Southwest Jiaotong University, Chengdu, China
1 shared publication - Yi Bao
Department of Civil, Environmental and Ocean Engineering, Stevens Institute of Technology, Hoboken, USA
1 shared publication
Latest Publications
- 1 July 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Bridge Engineering
- Vol. 23 (7)
Stress Distributions in Girder-Arch-Pier Connections of Long-Span Continuous Rigid Frame Arch Railway Bridges
Because of their large stiffness and spanning capability, continuous rigid frame arch bridges are attracting increasing interest in the development of high-speed railway networks in China. The internal loadings are associated with both the continuous rigid frame and arch substructural systems. Thus, the bridges are subjected to complex stresses, in particular, at the girder-arch-pier connections. The evaluation of the mechanical performance and understanding of the stress distribution of the girder-arch-pier connection are critical for ensuring the effective design and condition assessment of the bridges. This paper investigates the stress distributions in the girder-arch-pier connections of the world’s longest continuous rigid frame arch railway bridge, the Yichang Yangtze River Bridge. Two models with a length scale of 1/10 were prepared and tested for the side-span and midspan girder-arch-pier connections, respectively. Detailed stress distributions in the connection models were measured, and three-dimensional finite-element models were established to help understand the measured stress distributions. The side-span and midspan connections are primarily in compression and have similar stress distributions.
- 1 July 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Bridge Engineering
- Vol. 23 (7)
Stress Distributions in Girder-Arch-Pier Connections of Long-Span Continuous Rigid Frame Arch Railway Bridges
Because of their large stiffness and spanning capability, continuous rigid frame arch bridges are attracting increasing interest in the development of high-speed railway networks in China. The internal loadings are associated with both the continuous rigid frame and arch substructural systems. Thus, the bridges are subjected to complex stresses, in particular, at the girder-arch-pier connections. The evaluation of the mechanical performance and understanding of the stress distribution of the girder-arch-pier connection are critical for ensuring the effective design and condition assessment of the bridges. This paper investigates the stress distributions in the girder-arch-pier connections of the world’s longest continuous rigid frame arch railway bridge, the Yichang Yangtze River Bridge. Two models with a length scale of 1/10 were prepared and tested for the side-span and midspan girder-arch-pier connections, respectively. Detailed stress distributions in the connection models were measured, and three-dimensional finite-element models were established to help understand the measured stress distributions. The side-span and midspan connections are primarily in compression and have similar stress distributions.