RNRonny Durrotun Nasihien

Ronny Durrotun Nasihien

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Ronny Durrotun Nasihien has a total of 29 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Performance evaluation of a continuous modular electrocoagulation–filtration system for batik wastewater treatment

    by Danayanti Azmi Dewi Nusantara, Erina Rahmadyanti, Ronny Durrotun Nasihien, Dimas Nur Prakoso, Sugeng Rifqi Mubaroq

    Batik wastewater from small-scale industries contains high concentrations of organic matter, suspended solids, and persistent synthetic dyes that pose significant environmental risks if discharged without adequate treatment. This study designed and evaluated the performance of a continuous...

  • Open Access

    Kinetic Modelling, Faraday-Based Continuous-Flow Projection, and Techno-Economic Assessment of Electrocoagulation-Filtration for Batik Wastewater

    by Erina Rahmadyanti, Danayanti Azmi Dewi Nusantara, Ronny Durrotun Nasihien, Dimas Nur Prakoso, Sugeng Rifqi Mubaroq

    Wastewater from stamped batik (batik cap) — the block-printing method that dominates micro, small, and medium enterprise (MSME) production across Southeast Asia — is commonly discharged without a transferable design basis for continuous-flow scale. This study links batch-scale electrocoagulation-filtration (EC-F) kinetics to operational current-density projections for a 1 m3/day wastewater treatment plant, complemented by techno-economic and carbon footprint assessments. A 2 × 3 factorial batch experiment with aluminium electrodes was conducted on real batik cap effluent. Six candidate kinetic forms — exponential saturation, pseudo-first-order, pseudo-second-order, Langmuir-hyperbolic, Gompertz, and logistic — were compared via AIC; sigmoidal forms (Gompertz at 4 cm gap; logistic at 2 cm gap) provided substantially better description of the η versus Faraday aluminium-dose data than the exponential baseline (ΔAIC = 5–38). The spacing factor was retained after controlling for total charge as a covariate (ANCOVA p < 10-4 for all three parameters), confirming a genuine geometric-mass-transfer effect beyond the coulombic load. The laboratory optimum yielded chemical oxygen demand, biochemical oxygen demand, and total suspended solids removals above 92% at a specific energy demand of 4.5-10.5 kWh kg-1 pollutant. The continuous-flow projection — explicitly framed as a predictive scale-up framework rather than a validated solution — recommends an operational current density of ≈1.4 mA cm-2 (parameter-wise medians 1.28-1.36 mA cm-2; combined safety value 1.4), one order of magnitude below the batch range, with projected effluent compliant with national discharge standards. Operational cost of USD 1.05-1.75 m-3 (correlated Monte Carlo, n = 20,000) is most sensitive to the kinetic rate constant and the aluminium plate price; the carbon footprint is dominated by primary aluminium production (89% of 10.4 kg CO2 m-3) and can be reduced to 0.99 kg CO2 m-3 by combining recycled-aluminium electrodes with photovoltaic power. A trade-off analysis between removal efficiency and sludge generation is also reported. The framework provides an auditable, MSME-relevant design basis for EC scale-up in the Southeast Asian batik sector.

  • Open Access

    Pemodelan 3D Tekla Structure Pada Konstruksi Baja Project Warehouse Finish Good Dalam Proses BIM (Building Information Modeling)

    by David Prasdiansyah, Ronny Durrotun Nasihien, Julistyana Tistogondo

    The construction of the warehouse finish good uses steel construction, for accuracy and acceleration in fabrication of steel requires accuracy in the section of steel pieces, connections, accessories and bolt hole point spacing. Based on reviews in the field, all project parties need 3d results and building planning, which can estimate problems and determine what methods will be used in the implementation in the field. In this Warehouse Finish Good project, development planning uses 2 BIM-based software for steel structures using the Tekla Structure program and for planning earthquake-resistant steel buildings using the SAP 2000 program. The purpose of this research is to study BIM (Building Information Modeling) based technology with the Tekla structure implementation method, the results obtained from the implementation can be 3d modeling and can find out the material requirements that will be used where BIM (Building Information Modeling) is very useful for the field implementation process and can also be a discussion material for all project-related teams to determine the work methods to be used.

  • Open Access

    Model Sebaran Dan Pemetaan Pembangunan Infrastruktur Kabel Fiber Optik Bawah Tanah Dengan Pendekatan SIG Di Kota Surabaya

    by M.FErry Suryazain, Ronny Durrotun Nasihien, Julistyana Tistogondo

    Surabaya City has an area of 33,306.30 Hectares and is divided into 31 sub-districts 154 villages and other government work units, known as SKPD (Satuan Kerja Perangkat Daerah). Regional devices provide services to the community, in order to support this, an internet network and supporting devices are needed which are connected to the network infrastructure between SKPD or public areas. This network infrastructure is managed and built by DINKOMINFO (Dinas Komunikasi dan Informatika) Surabaya City. The Surabaya City Government until 2022, has a total length of fiber optic cable installed in Surabaya reaching 285,932.74 meters as well as thousands of supporting devices such as CCTV and network device boxes. However, manual mapping and data collection methods have limitations in efficiency and accuracy. For this reason, a digital map using Geographic Information System (GIS) with ArcGIS application is required. Digital mapping enables more detailed and accurate geographic data collection, storage and analysis. Genteng sub-district will be the object of research because it has the highest density of fiber optic lines, with a total of 119 cable lines with a length of 21,383.7 meters or 21.4 kilometers, 74 access points, 31 handhole points and 127 CCTV points. This research produces a distribution map with the nearest neighbor method including an access point distribution map with a value of 1.0 which means a random distribution model, a handhole distribution map with a value of 1.6 uniform distribution models and, a CCTV point distribution map with a value of 0.7 group distribution models. The results of this research are expected to help in understanding the importance of digital map creation in network infrastructure development.

  • Open Access

    University Analysis on Digital Construction Program: Implementation & Impact of Mbkm Internship in Construction & Infrastructure Industry at Narotama University

    by Julistyana Tistogondo, Muhammad Ikhsan Setiawan, Farida Hardaningrum, Sri Wiwoho Mudjanarko, Diah Ayu Restuti Wulandari, Ronny Durrotun Nasihien, Hendro Sutowijoyo, Adi Prawito, Achmad Muchayan, Tubagus Purworusmiardi, et al.

    The Merdeka Learning-Merdeka Campus (MBKM) policy triggers Narotama University Surabaya to carry out innovative and creative teaching and learning activities. All parties involved, ranging from students, lecturers, and universities in general, enthusiastically welcomed the offers of new programs, one of which was the internship program. It is a way in the construction sector to finish all jobs with the help of digital tools and software. This study aims to describe the implementation of construction internships in the construction and infrastructure industry's digital era. It is seen from the point of view of university assessments in general. Crosstab analysis is used to see whether there is a relationship between effectiveness and the resulting benefits to the policies and processes of apprenticeship activities. The results prove that the Civil Engineering Study Program has run it well. Other study programs have also understood the concept of digital internships to improve soft skills.


  • Open Access

    Lecturer Analysis on the Implementation of MBKM Internship in the Construction & Infrastructure Industry at Faculty of Engineering and Computer Science of Narotama University

    by Julistyana Tistogondo, Ati Wahyuni, Muhammad Ikhsan Setiawan, Sri Wiwoho Mudjanarko, Ronny Durrotun Nasihien, Cholil Hasyim, Kuswanto Kuswanto

    The COVID-19 pandemic has affected the education sector. Nevertheless, the enthusiasm of students, teaching staff, and the public are great in welcoming creative, adaptive, and innovative programs from the government to support sustainable development. One of them that received a positive response is the Independent Learning Independent Campus (MBKM) internship program. This study aims to describe the implementation of MBKM internships from FTIK Narotama University students in the Construction and Infrastructure Industry based on Lecturer Assessment. Crosstab analysis is used to see the relationship between effectiveness and benefits resulting from the policy and apprenticeship. The results indicate that there is a relationship between these variables. So, it can be concluded that the Civil Engineering Study Program has run the program well, where the experience of six months in the field improves students' soft skills.

  • Open Access

    Solar Village: Mbkm Village Community Service Program, Narotama University, Surabaya, Indonesia, Student Program and After Studies

    by Muhammad Ikhsan Setiawan, Sri Wiwoho Mudjanarko, Ati Wahyuni, Ronny Durrotun Nasihien, Rizal Bahaswan, Agus Sukoco, Tubagus Purworusmiardi, Arasy Alimudin, Cholil Hasyim, Kuswanto Kuswanto, et al.

    MBKM KKN solar village is a program to encourage renewable energy in villages, thereby reducing dependence on conventional electricity by using solar cell-based electricity. Trending solar village articles on scopus.com. document by year, article title solar village, results of 102 documents, range of years to analyze: 2011 to 2021, only 1 (one) Indonesia affiliation, Universitas Gadjah Mada with 2 research article "solar village", Indonesia has 6 (six) research article "solar village". Analysis data using Crosstab, provides input or insight into the nature of the relationship because adding one or more variables to a two-way cross-qualification analysis is the same as keeping each variable constant. The research population is all students of Narotama University, 1633 students. The best Study Program for implementing MBKM KKN Village, are Civil Engineering (MBKM ranked 2) and Law (MBKM ranked 2), will improve especially MBKM KKN solar village.

  • Open Access

    MODEL INTEGRATION (BIM) FOR MAINTENANCE BUILDING AS INFORMATION AND ACTION PLAN IN LAUNDRY LABORATORY AND KITCHEN LABORATORY OF PETRA SURABAYA CHRISTIAN UNIVERSITY

    by Ary Sunantiyo, Ronny Durrotun Nasihien

    Maintenance of each building along with every component and its facilities is needed to provide smooth and comfortable activities in the building. Often the building maintenance process/activity has not been able to run properly due to a lot of information such as maintenance records, work drawings (as-built drawings), types of assets, specifications, repair, and maintenance history that have not been recorded or stored properly. Most building maintenance systems currently only focus on existing information or records. The proposed information system is to utilize 3D modeling techniques namely BIM (Building Information Modeling), which through this BIM will be able to capture relevant information according to the data in the building. The technology used is the BIM (Building Information Modeling) technology using the SketchUp program. This method is by making a model of the building and its facilities. Modeling is done by giving visual data in 3D (three dimensions) to resemble the original object. The benefit of 3D (three-dimensional) modeling is that it provides clearer information because the visualization displayed is the same as the original object at the location, so just looking at the 3D model is quite the same as seeing the original object at the location. This research resulted in an information system in the form of three-dimensional visual model images that can be accessed easily. This concludes that an integrated Building Information Modeling (BIM) based system can provide useful functions in building maintenance quickly and accurately.

  • Open Access

    Pemetaan Topografi Teristris Berbasis Sistem Informasi Geografis Menggunakan “Gps Handheld” Sebagai Acuan Pencarian Koordinat Awal (Studi Kasus: “Masterplan Sport Centre” Di Muntok, Bangka Belitung)

    by Aris Rahman, Ronny Durrotun Nasihien, Farida Hardaningrum

    Sports activity today is very significant growth. The spirit to welcome the 2018 Asian Games, which was originally held in Jakarta and Palembang, made the West Bangka district government plan to build a Sport Center as a medium to foster youth activities and especially in sports. The selected location is in Air Belo Village, Muntok District, West Bangka Regency with 13 hectares area.The research of planning of Masterplan Sport Center by using Topographical Mapping Method Based on Geographic Information System (GIS) with initial coordinate reference using GPS Handheld is expected to produce accurate design that can meet the needs of sports facilities and tourism sector in West Bangka Regency.The result of the Topography Teristris measurement in the form of Contour Map integrated with Rambut Bumi Indonesia (RBI) resulted in the location oriented Thematic map. For position correction using Google Earth, the result must meet Gross coordinate position error fault

  • Open Access

    Project Development Evaluation Towards Construction Waste Management Green Building Concept Oriented

    by Muhammad Rudiansyah, F Edy Rooslan Santoso, Ronny Durrotun Nasihien

    Surabaya as one of the metropolitan cities in Indonesia, has a high level of project development and an attraction for the community. This is predicted to provide potential changes in environmental quality such as decreased road performance, wastewater and increased volume of waste generation, increased noise and the emergence of community perceptions and concerns about the planned activity. The construction of construction projects will always produce a considerable amount of waste, so that if management is not carried out, the construction waste can become a serious problem for the environment. The waste management model is basically carried out through the stages of avoid, reduce, recycle, and dispoal. This study aims to determine the material that has the greatest potential to produce construction waste. The method used in this study is first to use the Pareto method, the first step that must be done is to rank using Trading Consumable Materials (TCM) based on the total price so that a large price is obtained into the first order, then using the Pareto method to determine the material to be investigated in determining the most construction waste. Furthermore, the second one uses the waste level calculation to determine the waste volume from the results of the Pareto analysis that has been obtained. Furthermore, the third is the calculation of the waste index to determine the volume of residual construction waste in the project in m2 in each day, and the last is the calculation of waste cost to determine whether a large waste volume will produce a large waste as well.