Zhaohong Li
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Zhaohong Li has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Guangxing Xu
State Key Laboratory of Mechanical Behavior and System Safety of Traffic Engineering Structures, Shijiazhuang Tiedao University, Shijiazhuang 050043, P. R. China
2 shared publications - Feifan Zhang
State Key Laboratory of Mechanical Behavior and System Safety of Traffic Engineering Structures, School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang, China
1 shared publication - Mingyang Li
State Key Laboratory of Mechanical Behavior and System Safety of Traffic Engineering Structures, School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang, China
1 shared publication - Zhixuan Liu
State Key Laboratory of Mechanical Behavior and System Safety of Traffic Engineering Structures, Shijiazhuang Tiedao University, Shijiazhuang 050043, P. R. China
1 shared publication
Latest Publications
- 1 April 2025
- Published by World Scientific Pub Co Pte Ltd in International Journal of Structural Stability and Dynamics
- Vol. 25 (24)
Conversion from Temporary to Permanent Rush-Repair Girder and Vehicle–Bridge Interaction Vibrations
A technical scheme for rush-repair girder is proposed to address expedited repairs following damage to the bridge structure of high-speed railways. This scheme incorporates prestressing tendons between the segments of the rush-repair girder, which are interconnected using steel pin-shear keys, allowing for a transition from a temporary to a permanent repair girder. The mechanical properties and vehicle–bridge coupling dynamic response of the rush-repair girder were studied and analyzed, and the results showed that the tensioning of longitudinal prestressing tendons can significantly improve the stiffness of the temporary rush-repair girder. After the conversion of the temporary rush-repair girder into the permanent rush-repair girder, the vertical stiffness was increased by 2.4 times, and the transverse stiffness was increased by 4 times, and the conversion of the system effectively improved the load carrying capacity of the rush-repair girder. The Temporary rush-repair girder allows vehicles to pass the maximum speed of 140[ ]km/h, and the permanent rush-repair girder will enable vehicles to pass the speed of 350[ ]km/h, with the increase in vehicle speed. The three safety indicators of the vehicle continue to increase, of which the wheel load shedding rate is the critical factor in controlling the vehicle operating speed. Since the track is not smooth with the superimposed effect of the rush-repair girder, it will lead to the vehicle’s wheel load shedding rate of the peak value.
- 1 April 2025
- Published by World Scientific Pub Co Pte Ltd in International Journal of Structural Stability and Dynamics
- Vol. 25 (24)
Conversion from Temporary to Permanent Rush-Repair Girder and Vehicle–Bridge Interaction Vibrations
A technical scheme for rush-repair girder is proposed to address expedited repairs following damage to the bridge structure of high-speed railways. This scheme incorporates prestressing tendons between the segments of the rush-repair girder, which are interconnected using steel pin-shear keys, allowing for a transition from a temporary to a permanent repair girder. The mechanical properties and vehicle–bridge coupling dynamic response of the rush-repair girder were studied and analyzed, and the results showed that the tensioning of longitudinal prestressing tendons can significantly improve the stiffness of the temporary rush-repair girder. After the conversion of the temporary rush-repair girder into the permanent rush-repair girder, the vertical stiffness was increased by 2.4 times, and the transverse stiffness was increased by 4 times, and the conversion of the system effectively improved the load carrying capacity of the rush-repair girder. The Temporary rush-repair girder allows vehicles to pass the maximum speed of 140[ ]km/h, and the permanent rush-repair girder will enable vehicles to pass the speed of 350[ ]km/h, with the increase in vehicle speed. The three safety indicators of the vehicle continue to increase, of which the wheel load shedding rate is the critical factor in controlling the vehicle operating speed. Since the track is not smooth with the superimposed effect of the rush-repair girder, it will lead to the vehicle’s wheel load shedding rate of the peak value.
- Open Access
- 11 August 2023
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 27 (10) , 4332-4351
Vehicle-bridge Interaction Analysis and Maximum Allowable Speed of a Deployable Emergency Repair Beam
- 11 August 2023
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 27 (10) , 4332-4351
Open AccessVehicle-bridge Interaction Analysis and Maximum Allowable Speed of a Deployable Emergency Repair Beam