Kai-Tung Ma
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Kai-Tung Ma has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
- Glib Ivanov
Department of Engineering Science and Ocean Engineering, National Taiwan University, Taiwan
8 shared publications - I Jen Hsu
National Taiwan University
3 shared publications - Amir Noorizadegan
Civil Engineering, National Taiwan University, Taipei 10617, Taiwan
2 shared publications - Ding Peng Liu
Dept. of Civil, Arch., and Environmental Engineering The University of Texas at Austin Texas USA
2 shared publications - Gwo-An Chang
American Bureau of Shipping, 1701 City Plaza Drive, Spring, TX 77389, USA
2 shared publications Ding-Peng Liu
1 shared publication
Latest Publications
- Open Access
- 16 August 2026
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 14 (16) , 1515
Full-Field Hull Fatigue Mapping Across Environmental Bins for a Semi-Submersible Floating Offshore Wind Turbine
Fatigue assessment of floating offshore wind turbines (FOWTs) remains challenging because fatigue-sensitive regions may occur outside conventional predefined hotspots. This study applies a previously numerically verified full-field fatigue-screening workflow combining Unit Load Response, submodeling, and Virtual Test Rig concepts to the TaidaFloat semi-submersible FOWT under Taiwan Strait environmental conditions. Reconstructed nodal stress histories are used to map hull fatigue and evaluate occurrence-weighted contributions from 182 environmental bins, including operational and typhoon conditions. The results identify fatigue-sensitive regions not only at conventional column–bracing and column–pontoon connections but also in the upper main column and along the turbine–hull load path. Upper column fatigue is mainly associated with turbine-induced bending, whereas lower column and waterline-adjacent regions are more sensitive to wave-induced global hull bending. Frequently occurring near-rated operational conditions dominate the occurrence-weighted hull fatigue contribution, while selected typhoon conditions produce high short-term damage but limited long-term contributions within the four-year dataset. Approximately 94.6% of hull fatigue damage is captured by 28% of the bins, and a common hull–mooring set captures 97.0% of both contributions using 62% of the bins. These findings support hotspot screening and environmental-bin prioritization rather than detailed or certification-level fatigue life prediction.
- 16 August 2026
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 14 (16) , 1515
Open AccessFull-Field Hull Fatigue Mapping Across Environmental Bins for a Semi-Submersible Floating Offshore Wind Turbine
Fatigue assessment of floating offshore wind turbines (FOWTs) remains challenging because fatigue-sensitive regions may occur outside conventional predefined hotspots. This study applies a previously numerically verified full-field fatigue-screening workflow combining Unit Load Response, submodeling, and Virtual Test Rig concepts to the TaidaFloat semi-submersible FOWT under Taiwan Strait environmental conditions. Reconstructed nodal stress histories are used to map hull fatigue and evaluate occurrence-weighted contributions from 182 environmental bins, including operational and typhoon conditions. The results identify fatigue-sensitive regions not only at conventional column–bracing and column–pontoon connections but also in the upper main column and along the turbine–hull load path. Upper column fatigue is mainly associated with turbine-induced bending, whereas lower column and waterline-adjacent regions are more sensitive to wave-induced global hull bending. Frequently occurring near-rated operational conditions dominate the occurrence-weighted hull fatigue contribution, while selected typhoon conditions produce high short-term damage but limited long-term contributions within the four-year dataset. Approximately 94.6% of hull fatigue damage is captured by 28% of the bins, and a common hull–mooring set captures 97.0% of both contributions using 62% of the bins. These findings support hotspot screening and environmental-bin prioritization rather than detailed or certification-level fatigue life prediction.
- Open Access
- 17 March 2026
- Published by Elsevier in Ocean Engineering
- Vol. 355
Fatigue assessment for mooring chain of floating offshore wind turbines in monsoon and typhoon regions
- 17 March 2026
- Published by Elsevier in Ocean Engineering
- Vol. 355
Open AccessFatigue assessment for mooring chain of floating offshore wind turbines in monsoon and typhoon regions
- Open Access
- 3 December 2025
- Published by MDPI AG in Preprints.org
Accelerating Time-Domain Fatigue Screening of Offshore Structures with an Integrated Unit Load Response and Submodelling Workflow
Time-domain fatigue analysis of floating offshore wind turbines (FOWTs) is accurate but often prohibitive for early-stage design. The Unit Load Response (ULR) method, based on linear superposition, offers an efficient alternative, but its application to large, shell-based structures with complex distributed loads remains a challenge. We propose a workflow that integrates ULRs with force-based submodelling to enable whole-structure fatigue screening at design cost. Two key innovations make it practical: (i) A "Virtual Test Rig" is used to create a computationally fast, stiffness-equivalent simplified global model for extracting boundary loads. (ii) A ULR catalogue is generated for a detailed local submodel, which includes a trilinear interpolation scheme (with water height, pitch, roll) to efficiently handle complex, wave pressure fields. The workflow is first verified on a canonical portal frame and then applied to a full-scale semisubmersible FOWT. Across 14 critical locations, the reconstructed stress time histories match the submodel with a median bias ≈ of approximately −3.8% to −4.9%, and the stress and fatigue rankings are preserved, with Kendall’s τ-a ≥ 0.7 at stress concentrations and τ-a ≥ 0.8 overall. Compared to classic step-by-step submodelling, the method achieves ~13-29 times lower wall-clock effort and produces outputs that are otherwise impractical at scale (e.g., full-hull damage maps), enabling earlier, more informed fatigue-driven design decisions.
- 3 December 2025
- Published by MDPI AG in Preprints.org
Open AccessAccelerating Time-Domain Fatigue Screening of Offshore Structures with an Integrated Unit Load Response and Submodelling Workflow
Time-domain fatigue analysis of floating offshore wind turbines (FOWTs) is accurate but often prohibitive for early-stage design. The Unit Load Response (ULR) method, based on linear superposition, offers an efficient alternative, but its application to large, shell-based structures with complex distributed loads remains a challenge. We propose a workflow that integrates ULRs with force-based submodelling to enable whole-structure fatigue screening at design cost. Two key innovations make it practical: (i) A "Virtual Test Rig" is used to create a computationally fast, stiffness-equivalent simplified global model for extracting boundary loads. (ii) A ULR catalogue is generated for a detailed local submodel, which includes a trilinear interpolation scheme (with water height, pitch, roll) to efficiently handle complex, wave pressure fields. The workflow is first verified on a canonical portal frame and then applied to a full-scale semisubmersible FOWT. Across 14 critical locations, the reconstructed stress time histories match the submodel with a median bias ≈ of approximately −3.8% to −4.9%, and the stress and fatigue rankings are preserved, with Kendall’s τ-a ≥ 0.7 at stress concentrations and τ-a ≥ 0.8 overall. Compared to classic step-by-step submodelling, the method achieves ~13-29 times lower wall-clock effort and produces outputs that are otherwise impractical at scale (e.g., full-hull damage maps), enabling earlier, more informed fatigue-driven design decisions.
- Open Access
- 28 March 2025
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 13 (4) , 687
Wind Farm Design with 15 MW Floating Offshore Wind Turbines in Typhoon Regions
Floating Offshore Wind Turbines (FOWTs) are gaining traction as a solution for harnessing wind energy in deepwater regions where traditional fixed-bottom turbines may not be viable due to water depth. This paper investigates the feasibility and optimization of a floating wind farm in a tropical cyclone (typhoon) region, using the IEA 15 MW turbine and semi-submersible floaters. Because of the extreme environment, the FOWT’s mooring system requires nine catenary chains in a 3 × 3 pattern, which has a large footprint. One challenge in the wind farm design is fitting the FOWTs in a limited area and minimizing wake effects. This research compares a linear layout and an offset grid layout, focusing on the effects of spacing and wake dynamics. The results show that while the linear layout maintains optimal power generation without energy loss, the offset grid layout, although resulting in 2% energy loss, offers greater spatial efficiency for larger-scale projects. The findings highlight the importance of balancing energy efficiency with spatial optimization, particularly for large offshore wind farms. This study explores the use of the Gauss–Curl hybrid model in wake modeling, and the methodology employed provides insights into FOWT placement and mooring system arrangement. The result concludes that a wind farm containing twelve (12) units of 15 MW wind turbines can achieve the 7.0 MW/km2 power generation density required by a regulatory government agency. It proves the technical feasibility of a wind farm congested with large mooring systems in a tropical cyclone region.
- 28 March 2025
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 13 (4) , 687
Open AccessWind Farm Design with 15 MW Floating Offshore Wind Turbines in Typhoon Regions
Floating Offshore Wind Turbines (FOWTs) are gaining traction as a solution for harnessing wind energy in deepwater regions where traditional fixed-bottom turbines may not be viable due to water depth. This paper investigates the feasibility and optimization of a floating wind farm in a tropical cyclone (typhoon) region, using the IEA 15 MW turbine and semi-submersible floaters. Because of the extreme environment, the FOWT’s mooring system requires nine catenary chains in a 3 × 3 pattern, which has a large footprint. One challenge in the wind farm design is fitting the FOWTs in a limited area and minimizing wake effects. This research compares a linear layout and an offset grid layout, focusing on the effects of spacing and wake dynamics. The results show that while the linear layout maintains optimal power generation without energy loss, the offset grid layout, although resulting in 2% energy loss, offers greater spatial efficiency for larger-scale projects. The findings highlight the importance of balancing energy efficiency with spatial optimization, particularly for large offshore wind farms. This study explores the use of the Gauss–Curl hybrid model in wake modeling, and the methodology employed provides insights into FOWT placement and mooring system arrangement. The result concludes that a wind farm containing twelve (12) units of 15 MW wind turbines can achieve the 7.0 MW/km2 power generation density required by a regulatory government agency. It proves the technical feasibility of a wind farm congested with large mooring systems in a tropical cyclone region.
- Open Access
Floater Assembly and Turbine Integration Strategy for Floating Offshore Wind Energy: Considerations and Recommendations
The increasing demand for cost-effective floating offshore wind turbines (FOWTs) necessitates streamlined mass production and efficient assembly strategies. This research investigates the assembly and integration of 15 MW FOWT floaters, utilising a semi-submersible floater equipped with a 15 MW wind turbine. The infrastructure and existing port facilities of Taiwan are used as an example. The effectiveness of various assembly and integration strategies has been evaluated. The study outlines equipment and infrastructure requirements for on-quay floater and turbine assembly, comparing on-quay assembly to construction at remote locations and subsequent towing. Detailed analyses of port operations, crane specifications, and assembly procedures are presented, emphasising the critical role of crane selection and configuration. The findings indicate that on-quay assembly at one major port is feasible and cost-effective, provided that port infrastructure and operational logistics are optimised. This research offers insights and recommendations for implementing large-scale FOWT projects, contributing to advancing offshore wind energy deployment.
Open AccessFloater Assembly and Turbine Integration Strategy for Floating Offshore Wind Energy: Considerations and Recommendations
The increasing demand for cost-effective floating offshore wind turbines (FOWTs) necessitates streamlined mass production and efficient assembly strategies. This research investigates the assembly and integration of 15 MW FOWT floaters, utilising a semi-submersible floater equipped with a 15 MW wind turbine. The infrastructure and existing port facilities of Taiwan are used as an example. The effectiveness of various assembly and integration strategies has been evaluated. The study outlines equipment and infrastructure requirements for on-quay floater and turbine assembly, comparing on-quay assembly to construction at remote locations and subsequent towing. Detailed analyses of port operations, crane specifications, and assembly procedures are presented, emphasising the critical role of crane selection and configuration. The findings indicate that on-quay assembly at one major port is feasible and cost-effective, provided that port infrastructure and operational logistics are optimised. This research offers insights and recommendations for implementing large-scale FOWT projects, contributing to advancing offshore wind energy deployment.
- Open Access
- 30 September 2024
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 12 (10) , 1721
A Study on Offshore Anchor Selection with a Focus on Torpedo Anchor Stability and Performance
The global pursuit of renewable energy has significantly accelerated offshore wind energy development. Floating offshore wind turbines (FOWTs) are increasingly in the spotlight as they offer superior capabilities for harnessing abundant wind resources in deep-water areas, outperforming traditional fixed-bottom turbines. The deployment and station-keeping of these floating structures are critically dependent on robust mooring systems and the precise selection of anchoring solutions. This paper provides an overview of various anchors, including driven and suction caissons, torpedo, and drag anchors, and their applications in real-world projects. These commonly used anchors were discussed in relation to mooring types, soil conditions, and expected bearing capacities. Torpedo anchor installation failures have been reported in cases where excessive tilt angles occur during deployment. This motivates us to present an in-depth study on the importance of directional stability during installation of torpedo anchors. The study will utilize computational fluid dynamics Star-CCM+ 2402 to analyze and assess the impact of the center of gravity configuration on stabilization. Additionally, theoretical formulas will be used to estimate the holding capacity that the torpedo anchor can provide. These insights are designed to assist wind energy developers in making informed and effective anchoring decisions for floating wind turbine projects.
- 30 September 2024
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 12 (10) , 1721
Open AccessA Study on Offshore Anchor Selection with a Focus on Torpedo Anchor Stability and Performance
The global pursuit of renewable energy has significantly accelerated offshore wind energy development. Floating offshore wind turbines (FOWTs) are increasingly in the spotlight as they offer superior capabilities for harnessing abundant wind resources in deep-water areas, outperforming traditional fixed-bottom turbines. The deployment and station-keeping of these floating structures are critically dependent on robust mooring systems and the precise selection of anchoring solutions. This paper provides an overview of various anchors, including driven and suction caissons, torpedo, and drag anchors, and their applications in real-world projects. These commonly used anchors were discussed in relation to mooring types, soil conditions, and expected bearing capacities. Torpedo anchor installation failures have been reported in cases where excessive tilt angles occur during deployment. This motivates us to present an in-depth study on the importance of directional stability during installation of torpedo anchors. The study will utilize computational fluid dynamics Star-CCM+ 2402 to analyze and assess the impact of the center of gravity configuration on stabilization. Additionally, theoretical formulas will be used to estimate the holding capacity that the torpedo anchor can provide. These insights are designed to assist wind energy developers in making informed and effective anchoring decisions for floating wind turbine projects.
- Open Access
- 24 September 2024
- Published by MDPI AG in Preprints.org
Floater Assembly and Turbine Integration Strategy for Floating Offshore Wind Energy: Considerations and Recommendations
The increasing demand for cost-effective floating offshore wind turbines (FOWT) necessitates streamlined mass production and efficient assembly strategies. This research investigates the assembly and integration of 15 MW FOWT floaters, utilising a semi-submersible floater equipped with a 15 MW wind turbine. The infrastructure and existing port facilities of Taiwan are used as an example. The effectiveness of various assembly and integration strategies has been evaluated. The study outlines equipment and infrastructure requirements for on-quay floater and turbine assembly, comparing on-quay assembly versus construction at remote locations and subsequent towing. Detailed analyses of port operations, crane specifications, and assembly procedures are presented, emphasizing the critical role of crane selection and configuration. The findings indicate that on-quay assembly at one major port is feasible and cost-effective, provided that port infrastructure and operational logistics are optimised. This research offers insights and recommendations for implementing large-scale FOWT projects, contributing to advancing offshore wind energy deployment.
- 24 September 2024
- Published by MDPI AG in Preprints.org
Open AccessFloater Assembly and Turbine Integration Strategy for Floating Offshore Wind Energy: Considerations and Recommendations
The increasing demand for cost-effective floating offshore wind turbines (FOWT) necessitates streamlined mass production and efficient assembly strategies. This research investigates the assembly and integration of 15 MW FOWT floaters, utilising a semi-submersible floater equipped with a 15 MW wind turbine. The infrastructure and existing port facilities of Taiwan are used as an example. The effectiveness of various assembly and integration strategies has been evaluated. The study outlines equipment and infrastructure requirements for on-quay floater and turbine assembly, comparing on-quay assembly versus construction at remote locations and subsequent towing. Detailed analyses of port operations, crane specifications, and assembly procedures are presented, emphasizing the critical role of crane selection and configuration. The findings indicate that on-quay assembly at one major port is feasible and cost-effective, provided that port infrastructure and operational logistics are optimised. This research offers insights and recommendations for implementing large-scale FOWT projects, contributing to advancing offshore wind energy deployment.
- 30 June 2024
- Published by Springer Nature
- p. 751-769
Overview of FOWT Demo Projects Cost and Analyses of Hull Design Features
- 30 June 2024
- Published by Springer Nature
- p. 751-769
Overview of FOWT Demo Projects Cost and Analyses of Hull Design Features
- Open Access
- 24 August 2023
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 11 (9) , 1663
Design Considerations on Semi-Submersible Columns, Bracings and Pontoons for Floating Wind
Floating offshore wind turbine (FOWT) is an innovative technology with little industry guidance for its hull design. Various FOWT floaters with different hull shapes claim to support the same turbines. Structural integrity and material expense analyses of different pontoon shapes were conducted, and it was found that some configurations, such as those with every two columns connected by both pontoon and bracing, have advantages over others. However, it is important to note that the choice of pontoon shape should be based on the wave loading conditions the floater will be exposed to. While a T-shaped pontoon provides a cost-effective solution under certain wave loading scenarios, it may not be the best option for all conditions. Specifically, ring pontoon designs with full bracing were found to be necessary for withstanding certain wave loads. Therefore, it is important to consider different Dominant Load Parameters (DLP) and ensure that a FOWT floater can withstand all applicable DLPs. An uneven hexahedral column shape, which combines the best attributes of square and round shapes, is proposed as a better alternative to cylindrical columns. It offers ease of manufacture and reasonably low drag. Bracing is found to be necessary for withstanding the wind turbine’s incurred moment and forces. The conclusion is that platform design should prioritize manufacturing costs and strength over maximizing hydrodynamic performance.
- 24 August 2023
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 11 (9) , 1663
Open AccessDesign Considerations on Semi-Submersible Columns, Bracings and Pontoons for Floating Wind
Floating offshore wind turbine (FOWT) is an innovative technology with little industry guidance for its hull design. Various FOWT floaters with different hull shapes claim to support the same turbines. Structural integrity and material expense analyses of different pontoon shapes were conducted, and it was found that some configurations, such as those with every two columns connected by both pontoon and bracing, have advantages over others. However, it is important to note that the choice of pontoon shape should be based on the wave loading conditions the floater will be exposed to. While a T-shaped pontoon provides a cost-effective solution under certain wave loading scenarios, it may not be the best option for all conditions. Specifically, ring pontoon designs with full bracing were found to be necessary for withstanding certain wave loads. Therefore, it is important to consider different Dominant Load Parameters (DLP) and ensure that a FOWT floater can withstand all applicable DLPs. An uneven hexahedral column shape, which combines the best attributes of square and round shapes, is proposed as a better alternative to cylindrical columns. It offers ease of manufacture and reasonably low drag. Bracing is found to be necessary for withstanding the wind turbine’s incurred moment and forces. The conclusion is that platform design should prioritize manufacturing costs and strength over maximizing hydrodynamic performance.