Anastasiia Abramova
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Anastasiia Abramova has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Azariy Abramovich Lapidus
Moscow State University of Civil Engineering
4 shared publications - Ivan Abramov
Moscow State University of Civil Engineering, 26 Yaroslavskoe shosse, Moscow, 129337, Russia
4 shared publications - Tatyana Kuzmina
Moscow State University of Civil Engineering
4 shared publications - Zaid Ali Kadhim AlZaidi
Roads and Transportation Engineering Department, College of Engineering, University of Al-Qadisiyah, Al-Diwaniyah 58001, Iraq
4 shared publications
Latest Publications
- Open Access
Sustainable Activity of Construction Companies under the Influence of Destabilizing Factors on the Duration of Implementation of Investment-Construction Projects
Failure to meet the deadlines for the implementation of investment-construction projects is a problem in all countries of the world and leads to unstable activity of construction companies. This article studies the most important destabilizing factors affecting the main indicator of sustainable activity of construction companies, i.e., the duration of the implementation of an investment-construction projects. To determine and assess the impact of destabilizing factors on the duration of implementation of selected investment-construction projects, a survey was conducted in which a number of customers, consultants, and contractors involved in construction projects took part. Questionnaires developed on the basis of a cluster sample were sent to respondents, and 84 responses were received in response to the assessment of destabilizing factors. To analyze the received and grouped information, structural equation modeling using the Smart-PLS program was used. As a result of modeling, a number of results were obtained, the most important of which was the identification of the main reasons that lead to an average (20–50%) increase in the duration of projects in the construction sector. The most significant was the lack of an appropriate procurement program for materials; inefficient scheduling by contractors and instability of construction production, poor-quality processing of incoming information, and untimely decision-making due to changes in projects during their implementation. Destabilizing factors contribute to an increase in the duration of construction sector projects, which leads to time overruns, cost overruns, and an increase in the negative impact on the overall use of resources. As a result of the study, a set of recommendations was formed, the most important of which is the use of possible compensatory measures that can allow construction companies to eliminate the risks of disrupting construction deadlines for sustainable activities. These compensatory measures include: 1. recommendations to customers of the construction project, 2. recommendations to contractors, and 3. recommendations to the consultant. Moreover, the control of destabilizing factors that can cause delays, the improvement of contracts, and the precise and clearer definition of all elements of the project can help to reduce the duration of construction, and will allow companies to maintain sustainable activities in the construction industry.
Open AccessSustainable Activity of Construction Companies under the Influence of Destabilizing Factors on the Duration of Implementation of Investment-Construction Projects
Failure to meet the deadlines for the implementation of investment-construction projects is a problem in all countries of the world and leads to unstable activity of construction companies. This article studies the most important destabilizing factors affecting the main indicator of sustainable activity of construction companies, i.e., the duration of the implementation of an investment-construction projects. To determine and assess the impact of destabilizing factors on the duration of implementation of selected investment-construction projects, a survey was conducted in which a number of customers, consultants, and contractors involved in construction projects took part. Questionnaires developed on the basis of a cluster sample were sent to respondents, and 84 responses were received in response to the assessment of destabilizing factors. To analyze the received and grouped information, structural equation modeling using the Smart-PLS program was used. As a result of modeling, a number of results were obtained, the most important of which was the identification of the main reasons that lead to an average (20–50%) increase in the duration of projects in the construction sector. The most significant was the lack of an appropriate procurement program for materials; inefficient scheduling by contractors and instability of construction production, poor-quality processing of incoming information, and untimely decision-making due to changes in projects during their implementation. Destabilizing factors contribute to an increase in the duration of construction sector projects, which leads to time overruns, cost overruns, and an increase in the negative impact on the overall use of resources. As a result of the study, a set of recommendations was formed, the most important of which is the use of possible compensatory measures that can allow construction companies to eliminate the risks of disrupting construction deadlines for sustainable activities. These compensatory measures include: 1. recommendations to customers of the construction project, 2. recommendations to contractors, and 3. recommendations to the consultant. Moreover, the control of destabilizing factors that can cause delays, the improvement of contracts, and the precise and clearer definition of all elements of the project can help to reduce the duration of construction, and will allow companies to maintain sustainable activities in the construction industry.
- Open Access
- 14 September 2023
- Published by MDPI AG in Preprints.org
Sustainable Activity of Construction Companies under the Influence of Destabilizing Factors on the Duration of Implementation of Investment and Construction Projects
Failure to meet the deadlines for the implementation of investment and construction projects is a problem in all countries of the world, and leads to unstable activity of construction companies. The article studies the most important destabilizing factors affecting the main indicator of sustainable activity of construction companies-the duration of the implementation of an investment and construction projects. To determine and assess the impact of destabilizing factors on the duration of implementation of selected investment and construction projects, a survey was conducted, in which a number of customers, consultants and contractors involved in construction projects took part. Questionnaires developed on the basis of a cluster sample were sent to respondents, 48 responses were received in response to the assessment of destabilizing factors. To analyze the received and grouped information, structural equation modeling using the Smart-PLS program was used. As a result of modeling, a number of results were obtained, the most important of which are the identification of the main reasons that lead to an average (20% - 50%) increase in the duration of projects in the construction sector. The most significant were: the lack of an appropriate procurement program for materials; inefficient scheduling by contractors and instability of construction production; poor-quality processing of incoming information and untimely deci-sion-making due to changes in projects during their implementation. Destabilizing factors con-tribute to an increase in the duration of construction sector projects, which leads to time overruns, cost overruns, and an increase in the negative impact on the overall use of resources. As a result of the study, a set of recommendations was formed, the most important of which is the use of possible compensatory measures that can allow construction companies to eliminate the risks of disrupting construction deadlines for sustainable activities. These compensatory measures include: - recommendations to customers of the construction project; - recommendations to contractors; - recommendations to the consultant. Moreover, the control of destabilizing factors that can cause delays, the improvement of contracts and the precise and clearer definition of all elements of the project can help to reduce the duration of construction, and will allow companies to maintain sustainable activities in the construction industry.
- 14 September 2023
- Published by MDPI AG in Preprints.org
Open AccessSustainable Activity of Construction Companies under the Influence of Destabilizing Factors on the Duration of Implementation of Investment and Construction Projects
Failure to meet the deadlines for the implementation of investment and construction projects is a problem in all countries of the world, and leads to unstable activity of construction companies. The article studies the most important destabilizing factors affecting the main indicator of sustainable activity of construction companies-the duration of the implementation of an investment and construction projects. To determine and assess the impact of destabilizing factors on the duration of implementation of selected investment and construction projects, a survey was conducted, in which a number of customers, consultants and contractors involved in construction projects took part. Questionnaires developed on the basis of a cluster sample were sent to respondents, 48 responses were received in response to the assessment of destabilizing factors. To analyze the received and grouped information, structural equation modeling using the Smart-PLS program was used. As a result of modeling, a number of results were obtained, the most important of which are the identification of the main reasons that lead to an average (20% - 50%) increase in the duration of projects in the construction sector. The most significant were: the lack of an appropriate procurement program for materials; inefficient scheduling by contractors and instability of construction production; poor-quality processing of incoming information and untimely deci-sion-making due to changes in projects during their implementation. Destabilizing factors con-tribute to an increase in the duration of construction sector projects, which leads to time overruns, cost overruns, and an increase in the negative impact on the overall use of resources. As a result of the study, a set of recommendations was formed, the most important of which is the use of possible compensatory measures that can allow construction companies to eliminate the risks of disrupting construction deadlines for sustainable activities. These compensatory measures include: - recommendations to customers of the construction project; - recommendations to contractors; - recommendations to the consultant. Moreover, the control of destabilizing factors that can cause delays, the improvement of contracts and the precise and clearer definition of all elements of the project can help to reduce the duration of construction, and will allow companies to maintain sustainable activities in the construction industry.
- Open Access
Study of the Sustainable Functioning of Construction Companies in the Conditions of Risk Factors
The risk factors that arise during the implementation of investment and construction projects differ in nature, degree of influence, and other characteristics. Ignoring these factors and measures to manage them often leads to critical consequences in the form of disruptions in the timing of work. The article discusses the risk factors arising at the construction stage, their classification, as well as the measures and strategies necessary to manage these factors. A methodology has been developed that includes conducting a survey in the form of a questionnaire in order to collect information about risk factors that affect the implementation of investment and construction projects. The fuzzy TOPSIS technique was used to compare the sustainable functioning of three construction companies (alternatives) on the basis of its application of measures and strategies necessary to deal with risk factors (criteria). Experts with experience in the construction sector were involved in the survey. The results showed that financial, technical, legal, economic, managerial, and natural factors have the greatest impact on investment and construction projects. It is recommended to pay special attention to the listed factors when developing measures aimed at preventing risks and their consequences. The methodology described in the study can be used by construction companies in strategic planning. The analysis of the stability of construction companies, depending on their use of various ways to counteract risk factors, allowed us to develop a number of practical recommendations to reduce the impact of the studied factors on achieving the goals of investment and construction projects.
Open AccessStudy of the Sustainable Functioning of Construction Companies in the Conditions of Risk Factors
The risk factors that arise during the implementation of investment and construction projects differ in nature, degree of influence, and other characteristics. Ignoring these factors and measures to manage them often leads to critical consequences in the form of disruptions in the timing of work. The article discusses the risk factors arising at the construction stage, their classification, as well as the measures and strategies necessary to manage these factors. A methodology has been developed that includes conducting a survey in the form of a questionnaire in order to collect information about risk factors that affect the implementation of investment and construction projects. The fuzzy TOPSIS technique was used to compare the sustainable functioning of three construction companies (alternatives) on the basis of its application of measures and strategies necessary to deal with risk factors (criteria). Experts with experience in the construction sector were involved in the survey. The results showed that financial, technical, legal, economic, managerial, and natural factors have the greatest impact on investment and construction projects. It is recommended to pay special attention to the listed factors when developing measures aimed at preventing risks and their consequences. The methodology described in the study can be used by construction companies in strategic planning. The analysis of the stability of construction companies, depending on their use of various ways to counteract risk factors, allowed us to develop a number of practical recommendations to reduce the impact of the studied factors on achieving the goals of investment and construction projects.
- Open Access
- 28 July 2023
- Published by MDPI AG in Preprints.org
Study of the Sustainable Functioning of Construction Companies in the Conditions of Risk Factors
Sustainability is a characteristic manifested in the ability to maintain the necessary level of performance for construction companies when risk factors arise during the implementation of investment and construction projects. The risk factors that arise during the implementation of in-vestment and construction projects differ in nature, degree of influence, and other characteristics. Ignoring these factors and measures to manage them often leads to critical consequences in the form of disruptions in the timing of work. Risk is a combination of the probability and consequences of the occurrence of adverse events. The article considers the concept of risk as a potential possibility of occurrence of adverse situations and related consequences when exposed to these factors. Risk factors are characterized by surprise, discreteness of changes, the presence of threshold values, upon reaching which a transition to a different mode of operation is required. The article discusses the risk factors arising at the construction stage, their classification. A methodology has been developed that includes conducting a survey in the form of a questionnaire in order to collect information about risk factors that affect the implementation of investment and construction projects. Experts with experience in the construction sector were involved in the survey. The processing of the survey results made it possible to assess the significance of various risk factors in investment and construction projects. Thus, statistical and expert methods were used in the study. The results showed that financial, technical, legal, economic, managerial and natural factors have the greatest impact on investment and construction projects. It is recommended to pay special attention to the listed factors when developing measures aimed at preventing risks and their consequences. The methodology described in the study can be used by construction companies in strategic planning. The analysis of the stability of construction companies, depending on their use of various ways to counteract risk factors, allowed us to develop a number of practical recommendations to reduce the impact of the studied factors on achieving the goals of investment and construction projects.
- 28 July 2023
- Published by MDPI AG in Preprints.org
Open AccessStudy of the Sustainable Functioning of Construction Companies in the Conditions of Risk Factors
Sustainability is a characteristic manifested in the ability to maintain the necessary level of performance for construction companies when risk factors arise during the implementation of investment and construction projects. The risk factors that arise during the implementation of in-vestment and construction projects differ in nature, degree of influence, and other characteristics. Ignoring these factors and measures to manage them often leads to critical consequences in the form of disruptions in the timing of work. Risk is a combination of the probability and consequences of the occurrence of adverse events. The article considers the concept of risk as a potential possibility of occurrence of adverse situations and related consequences when exposed to these factors. Risk factors are characterized by surprise, discreteness of changes, the presence of threshold values, upon reaching which a transition to a different mode of operation is required. The article discusses the risk factors arising at the construction stage, their classification. A methodology has been developed that includes conducting a survey in the form of a questionnaire in order to collect information about risk factors that affect the implementation of investment and construction projects. Experts with experience in the construction sector were involved in the survey. The processing of the survey results made it possible to assess the significance of various risk factors in investment and construction projects. Thus, statistical and expert methods were used in the study. The results showed that financial, technical, legal, economic, managerial and natural factors have the greatest impact on investment and construction projects. It is recommended to pay special attention to the listed factors when developing measures aimed at preventing risks and their consequences. The methodology described in the study can be used by construction companies in strategic planning. The analysis of the stability of construction companies, depending on their use of various ways to counteract risk factors, allowed us to develop a number of practical recommendations to reduce the impact of the studied factors on achieving the goals of investment and construction projects.