Xiangsheng Chen
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Xiangsheng Chen has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Jun Shen
State Key Laboratory of Intelligent Geotechnics and Tunnelling, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China
3 shared publications - Xiaohua Bao
State Key Laboratory of Intelligent Geotechnics and Tunnelling, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen, China
3 shared publications - Hongzhi Cui
Guangdong Engineering and Technology Research Center for Low-Carbon and Energy-Saving Buildings, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen, China
2 shared publications - Shidong Wu
State Key Model of Intelligent Geotechnics and Tunnelling, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China
2 shared publications - Huaicen Yuan
College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China
1 shared publication - Xianlong Wu
College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China
1 shared publication
Latest Publications
- Open Access
- 24 July 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (15) , 6319
Integrated Assessment of Bearing Capacity and GHG Emissions for Foundation Treatment Piles Considering Stratum Variability
Foundation treatment piles are crucial for enhancing the bearing capacity and stability of weak foundations and are widely utilized in construction projects. However, owing to the complexity of geological conditions, traditional construction methods fail to meet the demand for low-carbon development. To address these challenges, this study introduced a comprehensive decision-making approach that considers the impact of stratum variability on greenhouse gas (GHG) emissions and pile bearing capacity from the design phase. During the design process, the GHG emissions and bearing capacities of deep cement mixing (DCM) and high-pressure jet grouting (HPJG) piles were quantitatively assessed by analyzing the environmental and performance impacts of foundation treatment piles related to materials, transportation, and equipment usage. The results suggest that the bearing capacity of piles in shallow strata is highly susceptible to stratum variability. Using piles with a diameter of 800 mm and a length of 20 m as an example, compared with DCM piles, HPJG piles demonstrated a superior bearing capacity; however, their total GHG emissions were 6.58% higher, primarily because of the extensive use of machinery during HPJG pile construction. The GHG emissions of foundation treatment piles in shallow strata were influenced more by geological variability than those in deep strata. Sensitivity analysis revealed that the pile diameter is a critical determinant of GHG emissions and bearing capacity. Based on the bearing capacity–GHG emission optimization framework, a foundation treatment strategy that integrates overlapping and spaced pile arrangements was introduced. This innovative construction method reduced the total GHG emissions by 22.7% compared with conventional methods. These research findings contribute to low-carbon design in the construction industry.
- 24 July 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (15) , 6319
Open AccessIntegrated Assessment of Bearing Capacity and GHG Emissions for Foundation Treatment Piles Considering Stratum Variability
Foundation treatment piles are crucial for enhancing the bearing capacity and stability of weak foundations and are widely utilized in construction projects. However, owing to the complexity of geological conditions, traditional construction methods fail to meet the demand for low-carbon development. To address these challenges, this study introduced a comprehensive decision-making approach that considers the impact of stratum variability on greenhouse gas (GHG) emissions and pile bearing capacity from the design phase. During the design process, the GHG emissions and bearing capacities of deep cement mixing (DCM) and high-pressure jet grouting (HPJG) piles were quantitatively assessed by analyzing the environmental and performance impacts of foundation treatment piles related to materials, transportation, and equipment usage. The results suggest that the bearing capacity of piles in shallow strata is highly susceptible to stratum variability. Using piles with a diameter of 800 mm and a length of 20 m as an example, compared with DCM piles, HPJG piles demonstrated a superior bearing capacity; however, their total GHG emissions were 6.58% higher, primarily because of the extensive use of machinery during HPJG pile construction. The GHG emissions of foundation treatment piles in shallow strata were influenced more by geological variability than those in deep strata. Sensitivity analysis revealed that the pile diameter is a critical determinant of GHG emissions and bearing capacity. Based on the bearing capacity–GHG emission optimization framework, a foundation treatment strategy that integrates overlapping and spaced pile arrangements was introduced. This innovative construction method reduced the total GHG emissions by 22.7% compared with conventional methods. These research findings contribute to low-carbon design in the construction industry.
- Open Access
- 13 November 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (22) , 12285
Study on the Performance of Twin Shield Tunnel Excavation below Existing Multi-Arch Culvert Bridge in Close Vicinity
Various adjacent construction projects are inevitably encountered during the large-scale construction of urban underground transportation. The case of a twin shield tunnel excavated below an existing multi-arch culvert bridge in close vicinity has not yet been thoroughly studied. A case of a shield tunnel excavation below an existing multi-arch culvert bridge in Foshan is presented. First, a fully coupled three-dimensional model incorporating fluid and solid interactions was established to simulate the twin shield tunnel excavation below the existing multi-arch culvert bridge in close vicinity. Subsequently, the numerical model was validated using the modified Peck empirical formula. Finally, the influence of different foundation reinforcement deformation moduli, tunnel excavation face support pressures and grouting pressures on ground deformation was discussed. The results indicate that the area most significantly affected by the excavation of the tunnel passing underneath is not within the section of the multi-arch culvert bridge after applying the foundation reinforcement design. The area most significantly impacted is concentrated as the shield tunnel commences excavation and advances beneath the location corresponding to the 1-hole of the steel corrugated pipe. The range of influence of the ground disturbance extends approximately 7 m in front of the excavation face before the tunnel passed through. The range of ground disturbance decreases to 4–6 m in front of the excavation face after the tunnel passed through. The excavation face support pressure and grouting pressure have a minor impact on the settlement of the multi-arch culvert bridge under this reinforcement design. The results provide useful references for the reinforcement design for tunnel excavation adjacent to existing structures.
- 13 November 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (22) , 12285
Open AccessStudy on the Performance of Twin Shield Tunnel Excavation below Existing Multi-Arch Culvert Bridge in Close Vicinity
Various adjacent construction projects are inevitably encountered during the large-scale construction of urban underground transportation. The case of a twin shield tunnel excavated below an existing multi-arch culvert bridge in close vicinity has not yet been thoroughly studied. A case of a shield tunnel excavation below an existing multi-arch culvert bridge in Foshan is presented. First, a fully coupled three-dimensional model incorporating fluid and solid interactions was established to simulate the twin shield tunnel excavation below the existing multi-arch culvert bridge in close vicinity. Subsequently, the numerical model was validated using the modified Peck empirical formula. Finally, the influence of different foundation reinforcement deformation moduli, tunnel excavation face support pressures and grouting pressures on ground deformation was discussed. The results indicate that the area most significantly affected by the excavation of the tunnel passing underneath is not within the section of the multi-arch culvert bridge after applying the foundation reinforcement design. The area most significantly impacted is concentrated as the shield tunnel commences excavation and advances beneath the location corresponding to the 1-hole of the steel corrugated pipe. The range of influence of the ground disturbance extends approximately 7 m in front of the excavation face before the tunnel passed through. The range of ground disturbance decreases to 4–6 m in front of the excavation face after the tunnel passed through. The excavation face support pressure and grouting pressure have a minor impact on the settlement of the multi-arch culvert bridge under this reinforcement design. The results provide useful references for the reinforcement design for tunnel excavation adjacent to existing structures.
- Open Access
- 21 August 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (16) , 9441
Performance Analysis of Multiple Steel Corrugated Pipe Arch Culvert under Construction and Periodic Vehicle Load
The arrangement of multiple culverts has gradually increased in road engineering. However, the arrangement will face a series of risks in both the construction and operation stages. A numerical model was established to analyze the construction and operation safety of multiple steel corrugated pipe arch culverts by using a fully fluid–solid coupling two-dimensional (2D) model of a highway project. The sensitivity of factors affecting the settlement of the composite foundation such as modulus and depth of ground reinforcement was discussed. Based on the results of the 2D model, a fully fluid–solid coupling three-dimensional (3D) model was established to study the influence of dynamic cyclic vehicle load on the mechanical properties of multiple steel corrugated pipe arch culverts. The ground deformation, soil stress and pore pressure, structure stress, and deformation were analyzed. The results show that the maximum settlement of the soil in the arch culvert area is at the junction of the two different arch culverts after construction. The maximum vertical deformation of the structure appears at the vault, and the arch waist is prone to stress concentration. Under cyclic vehicle dynamic load, the ground deformation, structural stress, and arch culvert subgrade deformation showed a rapid growth stage, and then tended to be stable. The weak points in the structure during the construction and operation stages were revealed, which can provide a useful reference for the design and construction of multiple steel corrugated pipe arch culverts.
- 21 August 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (16) , 9441
Open AccessPerformance Analysis of Multiple Steel Corrugated Pipe Arch Culvert under Construction and Periodic Vehicle Load
The arrangement of multiple culverts has gradually increased in road engineering. However, the arrangement will face a series of risks in both the construction and operation stages. A numerical model was established to analyze the construction and operation safety of multiple steel corrugated pipe arch culverts by using a fully fluid–solid coupling two-dimensional (2D) model of a highway project. The sensitivity of factors affecting the settlement of the composite foundation such as modulus and depth of ground reinforcement was discussed. Based on the results of the 2D model, a fully fluid–solid coupling three-dimensional (3D) model was established to study the influence of dynamic cyclic vehicle load on the mechanical properties of multiple steel corrugated pipe arch culverts. The ground deformation, soil stress and pore pressure, structure stress, and deformation were analyzed. The results show that the maximum settlement of the soil in the arch culvert area is at the junction of the two different arch culverts after construction. The maximum vertical deformation of the structure appears at the vault, and the arch waist is prone to stress concentration. Under cyclic vehicle dynamic load, the ground deformation, structural stress, and arch culvert subgrade deformation showed a rapid growth stage, and then tended to be stable. The weak points in the structure during the construction and operation stages were revealed, which can provide a useful reference for the design and construction of multiple steel corrugated pipe arch culverts.