Won Young Yun
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Won Young Yun has a total of 40 co-authors. Here are the top co-authors by number of shared publications:
Young Jin Han
Hyosung Corporation
4 shared publications- Alfonsus Julanto Endharta
Department of Industrial Engineering, Pusan National University, Busan, Korea
3 shared publications Ha Won Kim
Rolling Stock Department RAMS Team, DAWONSYS
3 shared publications- Jong Woon Kim
Technical Research Institute, Rotem Company, 80-10, Mabuk-Ri, Guseong-Eup, Yongin-Shi, Gyunggi-Do 449-910, South Korea
3 shared publications - Ruiyou Zhang
College of Information Science and Engineering, Northeastern University, Shenyang 110819, China
3 shared publications - Herbert Kopfer
Universität Bremen
2 shared publications
Latest Publications
- Open Access
- 4 September 2025
- Published by IOP Publishing in Journal of Reliability Science and Engineering
- Vol. 1 (3)
On Uniformly Staggered Testing Strategy for Redundant Safety Instrumented Systems
In redundant safety instrumented systems (SISs), staggered proof testing is more effective at reducing the system unavailability or the PFD (average probability of failure on demand) of a SIS than simultaneous proof testing. A method of computing the PFD for a SIS with a k-out-of-n structure is proposed and PFD formulas for uniformly staggered and simultaneous schemes in periodic proof testing are analyzed. The optimality of the uniformly staggered testing scheme is reviewed for a SIS with k-out-of-n structures in which redundant units have identical and different failure rates, respectively. In addition, this paper examines the staggered testing schemes for k-out-of-n structures with common cause failure (CCF) models used in International Electrotechnical Commission (IEC) 61508 and compares them with a numerical example.
- 4 September 2025
- Published by IOP Publishing in Journal of Reliability Science and Engineering
- Vol. 1 (3)
Open AccessOn Uniformly Staggered Testing Strategy for Redundant Safety Instrumented Systems
In redundant safety instrumented systems (SISs), staggered proof testing is more effective at reducing the system unavailability or the PFD (average probability of failure on demand) of a SIS than simultaneous proof testing. A method of computing the PFD for a SIS with a k-out-of-n structure is proposed and PFD formulas for uniformly staggered and simultaneous schemes in periodic proof testing are analyzed. The optimality of the uniformly staggered testing scheme is reviewed for a SIS with k-out-of-n structures in which redundant units have identical and different failure rates, respectively. In addition, this paper examines the staggered testing schemes for k-out-of-n structures with common cause failure (CCF) models used in International Electrotechnical Commission (IEC) 61508 and compares them with a numerical example.
- 17 January 2025
- Published by Springer Nature
- p. 329-344
Statistical Design of New Two-Stage Plans for Reliability Demonstration Testing
- 17 January 2025
- Published by Springer Nature
- p. 329-344
Statistical Design of New Two-Stage Plans for Reliability Demonstration Testing
- 26 September 2024
- Published by Springer Nature
- p. 265-280
A Location Problem in Sensor Systems Considering System Reliability
- 26 September 2024
- Published by Springer Nature
- p. 265-280
A Location Problem in Sensor Systems Considering System Reliability
- Open Access
- 9 April 2024
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 40 (5) , 2792-2821
Optimum maintenance units in multi‐indenture systems
- 9 April 2024
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 40 (5) , 2792-2821
Open AccessOptimum maintenance units in multi‐indenture systems
- Open Access
Gearbox Condition Monitoring and Diagnosis of Unlabeled Vibration Signals Using a Supervised Learning Classifier
Data-based equipment fault detection and diagnosis is an important research area in the smart factory era, which began with the Fourth Industrial Revolution. Steel manufacturing is a typical processing industry, and efficient equipment operation can improve product quality and cost. Steel production systems require precise control of the equipment, which is a complex process. A gearbox transmits power between shafts and is an essential piece of mechanical equipment. A gearbox malfunction can cause serious problems not only in production, quality, and delivery but in safety. Many researchers are developing methods for monitoring gearbox condition and for diagnosing failures in order to resolve problems. In most data-driven methods, the analysis data set is derived from a distribution of identical data with failure mode labels. Industrial sites, however, often collect data without information on the failure type or failure status due to varying operating conditions and periodic repair. Therefore, the data sets not only include frequent false alarms, but they cannot explain the causes of the alarms. In this paper, a framework called the Reduced Lagrange Method (R-LM) periodically assigns pseudolabels to vibration signals collected without labels and creates an input data set. In order to monitor the status of equipment and to diagnose failures, the input data set is fed into a supervised learning classifier. To verify the proposed method, we build a test rig using motors and gearboxes that are used on production sites in order to artificially simulate defects in the gears and to operate them to collect vibration data. Data features are extracted from the frequency domain and time domain, and pseudolabeling is applied. There were fewer false alarms when applying R-LM, and it was possible to explain which features were responsible for equipment status changes, which improved field applicability. It was possible to detect changes in equipment conditions before a catastrophic failure, thus providing meaningful alarm and warning information, as well as further promising research topics.
Open AccessGearbox Condition Monitoring and Diagnosis of Unlabeled Vibration Signals Using a Supervised Learning Classifier
Data-based equipment fault detection and diagnosis is an important research area in the smart factory era, which began with the Fourth Industrial Revolution. Steel manufacturing is a typical processing industry, and efficient equipment operation can improve product quality and cost. Steel production systems require precise control of the equipment, which is a complex process. A gearbox transmits power between shafts and is an essential piece of mechanical equipment. A gearbox malfunction can cause serious problems not only in production, quality, and delivery but in safety. Many researchers are developing methods for monitoring gearbox condition and for diagnosing failures in order to resolve problems. In most data-driven methods, the analysis data set is derived from a distribution of identical data with failure mode labels. Industrial sites, however, often collect data without information on the failure type or failure status due to varying operating conditions and periodic repair. Therefore, the data sets not only include frequent false alarms, but they cannot explain the causes of the alarms. In this paper, a framework called the Reduced Lagrange Method (R-LM) periodically assigns pseudolabels to vibration signals collected without labels and creates an input data set. In order to monitor the status of equipment and to diagnose failures, the input data set is fed into a supervised learning classifier. To verify the proposed method, we build a test rig using motors and gearboxes that are used on production sites in order to artificially simulate defects in the gears and to operate them to collect vibration data. Data features are extracted from the frequency domain and time domain, and pseudolabeling is applied. There were fewer false alarms when applying R-LM, and it was possible to explain which features were responsible for equipment status changes, which improved field applicability. It was possible to detect changes in equipment conditions before a catastrophic failure, thus providing meaningful alarm and warning information, as well as further promising research topics.
- Open Access
- 4 January 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (1) , 450
Hot Strip Mill Gearbox Monitoring and Diagnosis Based on Convolutional Neural Networks Using the Pseudo-Labeling Method
The steel industry is typical process manufacturing, and the quality and cost of the products can be improved by efficient operation of equipment. This paper proposes an efficient diagnosis and monitoring method for the gearbox, which is a key piece of mechanical equipment in steel manufacturing. In particular, an equipment maintenance plan for stable operation is essential. Therefore, equipment monitoring and diagnosis to prevent unplanned plant shutdowns are important to operate the equipment efficiently and economically. Most plant data collected on-site have no precise information about equipment malfunctions. Therefore, it is difficult to directly apply supervised learning algorithms to diagnose and monitor the equipment with the operational data collected. The purpose of this paper is to propose a pseudo-label method to enable supervised learning for equipment data without labels. Pseudo-normal (PN) and pseudo-abnormal (PA) vibration datasets are defined and labeled to apply classification analysis algorithms to unlabeled equipment data. To find an anomalous state in the equipment based on vibration data, the initial PN vibration dataset is compared with a PA vibration dataset collected over time, and the equipment is monitored for potential failure. Continuous wavelet transform (CWT) is applied to the vibration signals collected to obtain an image dataset, which is then entered into a convolutional neural network (an image classifier) to determine classification accuracy and detect equipment abnormalities. As a result of Steps 1 to 4, abnormal signals have already been detected in the dataset, and alarms and warnings have already been generated. The classification accuracy was over 0.95 at , confirming quantitatively that the status of the equipment had changed significantly. In this way, a catastrophic failure can be avoided by performing a detailed equipment inspection in advance. Lastly, a catastrophic failure occurred in Step 9, and the classification accuracy ranged from 0.95 to 1.0. It was possible to prevent secondary equipment damage, such as motors connected to gearboxes, by identifying catastrophic failures promptly. This case study shows that the proposed procedure gives good results in detecting operation abnormalities of key unit equipment. In the conclusion, further promising topics are discussed.- 4 January 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (1) , 450
Open AccessHot Strip Mill Gearbox Monitoring and Diagnosis Based on Convolutional Neural Networks Using the Pseudo-Labeling Method
The steel industry is typical process manufacturing, and the quality and cost of the products can be improved by efficient operation of equipment. This paper proposes an efficient diagnosis and monitoring method for the gearbox, which is a key piece of mechanical equipment in steel manufacturing. In particular, an equipment maintenance plan for stable operation is essential. Therefore, equipment monitoring and diagnosis to prevent unplanned plant shutdowns are important to operate the equipment efficiently and economically. Most plant data collected on-site have no precise information about equipment malfunctions. Therefore, it is difficult to directly apply supervised learning algorithms to diagnose and monitor the equipment with the operational data collected. The purpose of this paper is to propose a pseudo-label method to enable supervised learning for equipment data without labels. Pseudo-normal (PN) and pseudo-abnormal (PA) vibration datasets are defined and labeled to apply classification analysis algorithms to unlabeled equipment data. To find an anomalous state in the equipment based on vibration data, the initial PN vibration dataset is compared with a PA vibration dataset collected over time, and the equipment is monitored for potential failure. Continuous wavelet transform (CWT) is applied to the vibration signals collected to obtain an image dataset, which is then entered into a convolutional neural network (an image classifier) to determine classification accuracy and detect equipment abnormalities. As a result of Steps 1 to 4, abnormal signals have already been detected in the dataset, and alarms and warnings have already been generated. The classification accuracy was over 0.95 at , confirming quantitatively that the status of the equipment had changed significantly. In this way, a catastrophic failure can be avoided by performing a detailed equipment inspection in advance. Lastly, a catastrophic failure occurred in Step 9, and the classification accuracy ranged from 0.95 to 1.0. It was possible to prevent secondary equipment damage, such as motors connected to gearboxes, by identifying catastrophic failures promptly. This case study shows that the proposed procedure gives good results in detecting operation abnormalities of key unit equipment. In the conclusion, further promising topics are discussed. - 21 August 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Reliability
- Vol. 73 (1) , 290-303
Reliability Computing Methods of Probabilistic Location Set Covering Problem Considering Wireless Network Applications
This article analyzes a network of servers that cover mobile phone calls in a given convex service area. All servers work with the same reliability, and can cover all call requests within a circle of the same given radius. When working servers cover the whole area, the network system is working. System reliability is the probability that working servers can cover the whole area. Without loss of generality, we assume that each server's location, coverage radius, and reliability are known. Monte Carlo and Voronoi diagram methods are used to check the system state, and a binary search method is proposed to obtain the system reliability. Also, a simulation method is used to evaluate system reliability in special cases. Finally, numerical examples are studied to investigate the effects of the model parameters on system reliability.
- 21 August 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Reliability
- Vol. 73 (1) , 290-303
Reliability Computing Methods of Probabilistic Location Set Covering Problem Considering Wireless Network Applications
This article analyzes a network of servers that cover mobile phone calls in a given convex service area. All servers work with the same reliability, and can cover all call requests within a circle of the same given radius. When working servers cover the whole area, the network system is working. System reliability is the probability that working servers can cover the whole area. Without loss of generality, we assume that each server's location, coverage radius, and reliability are known. Monte Carlo and Voronoi diagram methods are used to check the system state, and a binary search method is proposed to obtain the system reliability. Also, a simulation method is used to evaluate system reliability in special cases. Finally, numerical examples are studied to investigate the effects of the model parameters on system reliability.
- 3 June 2023
- Published by Springer Nature
- p. 355-383
A Summary of Inspection Policies of One Shot Systems
- 3 June 2023
- Published by Springer Nature
- p. 355-383
A Summary of Inspection Policies of One Shot Systems
- Open Access
- 30 September 2022
- Published by The Korean Society for Quality Management in Journal of the Korean society for quality management
- Vol. 50 (3) , 473-490
Development of a New Index to Assess the Process Stability
Purpose: The purpose of this study is to propose a new useful suggestion to monitor the stability of process by developing a stability ratio or index related to investigating how well the process is controlled or operated to the specified target.Methods: The proposed method to monitor the stability of process is building up a new measure index which is making up for the weakness of the existing index in terms of short or long term period of production. This new index is a combined one considering both stability and capability of process to the specification limits. We suppose that both process mean and process variation(or deviation) are changing on time period.Results: The results of this study are as follows: regarding the stability of process as well as capability of process, it was shown that two indices, called SI(stability index) and PI(performance index), can be expressed in two-dimensional X-Y graph simultaneously. This graph is categorized as 4 separated partitions, which are characterized by its numerical value intervals of SI and PI which are evaluated by test statistics.Conclusion: The new revised index is more robust than the existing one in investigating the stability of process in terms of short and long period of production, even in case both process mean and variation are changing.
- 30 September 2022
- Published by The Korean Society for Quality Management in Journal of the Korean society for quality management
- Vol. 50 (3) , 473-490
Open AccessDevelopment of a New Index to Assess the Process Stability
Purpose: The purpose of this study is to propose a new useful suggestion to monitor the stability of process by developing a stability ratio or index related to investigating how well the process is controlled or operated to the specified target.Methods: The proposed method to monitor the stability of process is building up a new measure index which is making up for the weakness of the existing index in terms of short or long term period of production. This new index is a combined one considering both stability and capability of process to the specification limits. We suppose that both process mean and process variation(or deviation) are changing on time period.Results: The results of this study are as follows: regarding the stability of process as well as capability of process, it was shown that two indices, called SI(stability index) and PI(performance index), can be expressed in two-dimensional X-Y graph simultaneously. This graph is categorized as 4 separated partitions, which are characterized by its numerical value intervals of SI and PI which are evaluated by test statistics.Conclusion: The new revised index is more robust than the existing one in investigating the stability of process in terms of short and long period of production, even in case both process mean and variation are changing.
- Open Access
- 30 September 2021
- Published by The Korean Society for Quality Management in Journal of the Korean society for quality management
- Vol. 49 (3) , 341-358
Economic Design of A Zero-Failure Reliability Demonstration Test Considering Capacity Limitation of Test Equipment
Purpose: After product development, a Reliability Demonstration Test(RDT) is performed to confirm that the target life has been achieved. In the RDT, there are cases where the test equipment cannot accommodate all samples. Therefore, this study considers a test method to most economically demonstrate the target life of the product at a certain confidence level when the sample size is larger than the capacity of the test equipment.Methods: If the sample size is larger than the capacity of the test equipment, test equipments may be added or the test time of individual samples may be increased. So the test method is designed to cover this situation with limited capacity. A zero-failure test method is applied as a test method to RDT. To minimize the cost, the test cost is defined and the cost function is obtained. Finally, we obtain the optimal test plan.Results: A zero-failure test method is designed when the sample size is larger than the capacity of the test equipment, and the expected total cost is derived. In addition, the process of calculating the appropriate sample size, test time, and number of test equipment is illustrated through an example, and the effects of model parameters to the optimal solutions are investigated numerically.Conclusion: In this paper, we study a zero-failure RDT with test equipment that has limited capacity. The expected total cost is derived and the optimal sample size, test time, and number of test equipment are determined to minimize the expected total cost. We also studied numerical examples and for further studies, we can relax some restrictions in the test model and optimize the test method.
- 30 September 2021
- Published by The Korean Society for Quality Management in Journal of the Korean society for quality management
- Vol. 49 (3) , 341-358
Open AccessEconomic Design of A Zero-Failure Reliability Demonstration Test Considering Capacity Limitation of Test Equipment
Purpose: After product development, a Reliability Demonstration Test(RDT) is performed to confirm that the target life has been achieved. In the RDT, there are cases where the test equipment cannot accommodate all samples. Therefore, this study considers a test method to most economically demonstrate the target life of the product at a certain confidence level when the sample size is larger than the capacity of the test equipment.Methods: If the sample size is larger than the capacity of the test equipment, test equipments may be added or the test time of individual samples may be increased. So the test method is designed to cover this situation with limited capacity. A zero-failure test method is applied as a test method to RDT. To minimize the cost, the test cost is defined and the cost function is obtained. Finally, we obtain the optimal test plan.Results: A zero-failure test method is designed when the sample size is larger than the capacity of the test equipment, and the expected total cost is derived. In addition, the process of calculating the appropriate sample size, test time, and number of test equipment is illustrated through an example, and the effects of model parameters to the optimal solutions are investigated numerically.Conclusion: In this paper, we study a zero-failure RDT with test equipment that has limited capacity. The expected total cost is derived and the optimal sample size, test time, and number of test equipment are determined to minimize the expected total cost. We also studied numerical examples and for further studies, we can relax some restrictions in the test model and optimize the test method.