Bowen Mao
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Interests
Bowen Mao has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Chengbo Yu
School of Electrical and Electronic Engineering, Chongqing University of Technology, Chongqing 400054, China
1 shared publication - Dongfang Shang
College of Intelligence and Computing, Tianjin University, Tianjin 300072, China
1 shared publication - Wenjun Wang
College of Intelligence and Computing, Tianjin University, Tianjin 300350, China
1 shared publication - Wentao Wang
School of Electrical and Electronic Engineering, Chongqing University of Technology, Chongqing 400054, China
1 shared publication - Yanfei Liu
College of Intelligence and Computing, Tianjin University, Tianjin 300350, China
1 shared publication - Yucong Duan
School of Computer Science and Technology, Hainan University, Haikou, China
1 shared publication
Latest Publications
- Open Access
- 30 August 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (17) , 13083
Purpose-Driven Evaluation of Operation and Maintenance Efficiency and Safety Based on DIKWP
In large-scale public security equipment projects, long-term equipment operation often leads to equipment failures and other problems, so it is particularly important to choose the appropriate operation and maintenance (O&M) scheme based on the content of the equipment work orders. However, there are a variety of equipment models in the work orders; not only is the data complex, but also due to the long project cycle, there are often problems such as loss of content, which bring great challenges to the O&M work. This paper defines these problems as “3-No problems”: inconsistency, inaccuracy, and incompleteness. In this paper, an improved DIKWP model is proposed and combined with a random forest classifier to construct data graphs, information graphs, knowledge graphs, and wisdom graphs. Through the above model, the 3-No problem in equipment work orders can be solved, and the importance of each equipment model can be obtained. Eventually, combined with the purpose graph, the selection of models, the bid score calculation, and the selection of O&M schemes are carried out based on the obtained conclusion in a purpose-driven manner to achieve the evaluation of O&M efficiency and safety. Finally, an example is assumed to illustrate the application of the method in actual projects, which provides a certain reference value for the selection of an O&M scheme for large-scale equipment projects.
- 30 August 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (17) , 13083
Open AccessPurpose-Driven Evaluation of Operation and Maintenance Efficiency and Safety Based on DIKWP
In large-scale public security equipment projects, long-term equipment operation often leads to equipment failures and other problems, so it is particularly important to choose the appropriate operation and maintenance (O&M) scheme based on the content of the equipment work orders. However, there are a variety of equipment models in the work orders; not only is the data complex, but also due to the long project cycle, there are often problems such as loss of content, which bring great challenges to the O&M work. This paper defines these problems as “3-No problems”: inconsistency, inaccuracy, and incompleteness. In this paper, an improved DIKWP model is proposed and combined with a random forest classifier to construct data graphs, information graphs, knowledge graphs, and wisdom graphs. Through the above model, the 3-No problem in equipment work orders can be solved, and the importance of each equipment model can be obtained. Eventually, combined with the purpose graph, the selection of models, the bid score calculation, and the selection of O&M schemes are carried out based on the obtained conclusion in a purpose-driven manner to achieve the evaluation of O&M efficiency and safety. Finally, an example is assumed to illustrate the application of the method in actual projects, which provides a certain reference value for the selection of an O&M scheme for large-scale equipment projects.