RLRusdi Usman Latief

Rusdi Usman Latief

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Rusdi Usman Latief has a total of 24 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Enhancing Constructability through Construction-Phase Design Adaptations: The Case Study of the Jenelata Dam Project

    by Muh Yusuf, M. Asad Abdurrahman, Rusdi Usman Latief

    This study explores how construction-phase design changes affect constructability performance in large-scale dam projects, using the Jenelata Dam Project in Indonesia as a case study. Three questions are tackled: (1) how design process factors relate to constructability, (2) how much these factors impact constructability performance, and (3) how design adaptations during construction influence time, cost, and constructability. A mixed-method approach was used, combining a survey of 32 project stakeholders (owners, consultants, and contractors), field observations, and document analysis. Quantitative analysis included Pearson correlation and multiple linear regression, with an R² of 0.786, showing strong explanatory power of design process variables. The results indicate that all design process factors are positively and significantly related to constructability, with Iterative and Adaptive Design being the most influential (β = 0.408). Qualitative validation shows that early and systematic design adaptations, such as replacing frame beams and hydroseeding with Geomat Type III for slope protection, and changing foundation treatment from vertical to rim grouting, led to significant improvements, including a 70% reduction in construction time and cost savings up to 61.3%. These findings provide empirical evidence that well-managed construction-phase design changes can improve constructability when coordinated and driven by data. The study offers practical insights for better integration of design and construction, and for managing design changes adaptively in complex dam projects.

  • Development of Knowledge Management Based on Safety Audit for Design-Build Contract in High-Rise Building Projects

    by R. Arifuddin, Y. Latief, M. A. Wibowo, D. B. Nugroho, R. U. Latief, S. Hamzah, A. A. I. Mawarni, M. R. Fadlillah

    Audits play a crucial role in construction safety management systems (CSMS) by identifying discrepancies and evaluating the effectiveness of safety implementation. Despite Indonesia’s rapid infrastructure development, audit practices remain insufficient to prevent construction accidents. This research aims to formulate a conceptual framework for maturing a knowledge management-based CSMS audit to enhance the effectiveness of safety management implementation in construction projects. The study employed a quantitative approach using the least square method to test the significance of safety audit indicators, supported by descriptive analysis involving expert evaluations on three different construction projects. The findings revealed that the most influential safety audit elements are construction safety operations, followed by mastery and contribution to construction safety, safety planning, safety performance evaluation, and safety support. Expert assessments confirmed a high level of applicability of the proposed framework. The novelty of this study lies in the integration of knowledge management principles into the CSMS audit process, offering a more mature and structured approach to improving safety performance. This framework provides a practical tool to strengthen audit effectiveness and support continuous improvement in construction safety management within the Indonesian infrastructure sector.

  • Open Access

    Analysis of the Criteria for Assessing Building Quality Damage Levels Using the AHP Method: A Case Study Based on Indonesian Building Regulations

    by Fatmawaty Rachim, Rusdi Usman Latief, Rosmariani Arifuddin

    Quality assessment is a critical part of a building's maintenance procedures, indicating its functionality. Measuring the level of damage in a building can be used as reference in decision making during repairs. The building's damage is influenced by structural, material, and environmental factors. However, the extent to which each criterion contributes to the damage is yet to be studied. This study analyzes the criteria that influence building quality damage by calculating their weight on the building's damage through the Analytic Hierarchy Process (AHP) method. Data were collected through in-depth interviews of experts in the field of building construction. The results reveal 6 main criteria and 33 sub-criteria that influence building quality damage. Further analysis indicated that the main structural criterion had the highest weight (0.4334) in determining the level of building quality deterioration, followed by the main architectural criterion (0.2074), electrical (0.1257), mechanical (0.0938), exterior layout (0.0708), and general building components (0.0690).


  • Open Access

    A Comparative Analysis of the Construction Methods between Foreign and State-Owned Contractor Enterprises on the Jenelata Dam Project: The Case Study of Excavator Breaker and Blasting

    by M. Asad Abdurrahman, Kasmiati, Rusdi Usman Latief

    Determining the appropriate method and evaluating the work can have a significant impact on construction. Jenelata Dam is being constructed by both foreign and State-Owned Enterprise (SOE) contractors. Rock excavation is typically carried out using an excavator breaker or the blasting method. This study was conducted to compare the construction methods and to identify and evaluate the factors affecting the time performance of each method. This research uses descriptive, qualitative, and quantitative methods. A productivity analysis tool was utilized to compare the performance of the two contractors, and an analytical hierarchy process was deployed to determine the significance of the factors. Based on the evaluation results of the rock excavation work of the excavator breaker method at Concrete Face Rockfill Dam (CFRD) Works (left-bank), the daily productivity of SOE contractors is 729.10 m3/day for four units of equipment, and the completion time is 155 days. The daily productivity at the foreign contractor spillway is more effective using the blasting method of 875.95 m3/day for one unit of equipment, done in 73 days. According to both contractors, design is the most significant factor affecting construction time performance.

  • Open Access

    A Review of Factors Causing Contractor Failure in the Tender Process on Government Construction Projects

    by Rusdi Usman Latief, Ismira Justy Ohorella, Rosmariani Arifuddin, Muh Rifan Fadlillah

    The implementation of e-tenders in the construction industry in the era of globalization faces several challenges in many countries, including Indonesia. Maluku Island, one of Indonesia's main islands, is experiencing growth in the construction sector. However, it faces challenges, especially in improving the quality of contractor companies in implementing tenders. This research attempts to examine the issue of tender failure more comprehensively. This study aims to identify and analyze the dominant factors that can affect contractor failure in the tender process. The research methodology includes a literature study developed through relative importance index analysis to determine the dominant factors. The results showed that 36 factors affected contractor failure in the tender process for government construction projects in Maluku province. Factors affecting contractor failure in tendering for government projects are divided into four main categories: administrative document evaluation with an RII value of 0.65, qualification with an RII value of 0.71, technical with an RII value of 0.73, and price with an RII value of 0.73. Technical and price evaluation are the most crucial factors. This research is expected to help contractors prepare better strategies in the tender process, especially in terms of technical and price documents.

  • Open Access

    A Model for the Economic Feasibility Assessment of Urban Road Development in Agglomeration Areas based on Land Value Changes

    by Muhammad Idris, Muhammad Isran Ramli, Rusdi Usman Latief, Sumarni Hamid Aly

    This study develops a model to evaluate the economic feasibility of urban road network development by incorporating land value changes as a key component of the evaluation process. The model addresses the limitations of conventional approaches that focus solely on transportation efficiency by integrating transportation benefits, such as Vehicle Operating Cost (VOC) savings and Value of Time (VoT), with long-term fiscal benefits derived from increases in Taxable Value of Objects (TVO) and Land and Building Tax (LBT). The methodology includes Cost-Benefit Analysis (CBA), traffic simulation using PTV Visum, and a log-linear regression model to quantify the impact of improved accessibility on land value. The model is applied and validated through a case study of the Mamminasata bypass road project in South Sulawesi, Indonesia. The project shows a Benefit-Cost Ratio (BCR) of 2.86, a Net Present Value (NPV) of 7,329.47 million IDR, and an Internal Rate of Return (IRR) of 12.05%, with full payback of the investment within 12 years. This model provides a more integrated, sustainable, and forward-looking approach to assessing the economic viability of road infrastructure development by linking transport efficiency with land value dynamics.


  • Open Access

    Size Identify Local Culture for Developing Sustainability Construction in SEZ Likupang

    by Rusdi Usman Latief, Daisy Pangemanan

    In the development of modern construction, the sustainable construction approach has grown in importance. Economic, environmental, and social factors have been identified as influencing its implementation. The use of the sustainable construction method is affected by several additional factors. This study aimed to determine how the Likupang SEZ’s local cultural factors affected sustainable construction methods. The method used is a quantitative study with a sample of the Likupang SEZ in North Sulawesi. The results of this study indicate an influence of local cultural factors of 0.264 on the implementation of the sustainable construction approach in the Likupang SEZ. The results of this study also indicate that local cultural factors are important to consider in implementing sustainable construction. Things that focus on local culture in planting trees as materials for construction, local heritage, Work Culture, and the migrant community environment should be of particular concern in implementing a sustainable construction approach in the Likupang SEZ area. Cultural factors have an important role in ensuring development with this sustainable construction approach considering environmental, social, and economic factors as well as cultural factors as new factors identified as having an influence. This study concludes that it is very important to pay attention to local cultural factors that influence the implementation of a sustainable construction approach in the Likupang SEZ project in North Minahasa Regency, North Sulawesi, Indonesia.


  • Open Access

    Labor Productivity Study in Construction Projects Viewed from Influence Factors

    by Rusdi U. Latief, N. M. Anditiaman, I. R. Rahim, R. Arifuddin, M. Tumpu

    Productivity is one of the fundamental factors affecting competitiveness in the construction industry. Construction and productivity are two things that are interrelated. This study aims to identify the factors and model relationship these factors that affect labor productivity using the Structural Equation Modelling (SEM) in road construction projects in Indonesia as seen from each side area I, II, and III, respectively. The results obtained the factors that influence labor productivity in road construction projects in Indonesia, namely field conditions, time, financial factors, and internal labor. The study's findings indicate that internal labor is one of the elements influencing labor productivity in Indonesian construction projects, particularly road maintenance work. Labor productivity research in Indonesia is conducted by comparing planned and realized labor productivity calculations, which are conducted by collecting project data and making firsthand observations of work in the field. Labor productivity is measured using characteristics other than the variables used in the research, as well as a larger population and sample coverage. The findings of this study can be utilized as input for government agencies in determining the ability of specialists to carry out work in the field connected to the preservation of non-structural flood handling roads on Indonesian territory. Doi: 10.28991/CEJ-2023-09-03-07 Full Text: PDF