Jinping Xie
Jinping Xie has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Dong Sheng
Hunan Water Resources and Hydropower Research Institute, 370 Shaoshan North, Changsha 410007, China
2 shared publications - Feifei Sun
China Water Resources Beifang Investigation, Design and Research Co., Ltd., 60 Dongting Road, Hexi District, Tianjin 300222, China
2 shared publications - Chao Sun
Yellow River Wanjiazhai Water Multi-Purpose Dam Project Co., Ltd., 89 Fudong Street, Taiyuan 030002, China
1 shared publication - Mingwei Yang
Hunan Water Resources and Hydropower Research Institute, 370 Shaoshan North, Changsha 410007, China
1 shared publication - Xinchuan Lu
Yellow River Wanjiazhai Water Multi-Purpose Dam Project Co., Ltd., 89 Fudong Street, Taiyuan 030002, China
1 shared publication - Yu Lou
Science and Technology Promotion Centre Ministry of Water Resources. P.R.C., Beijing 100038, China
1 shared publication
Latest Publications
- Open Access
A Forecast Heuristic of Back Propagation Neural Network and Particle Swarm Optimization for Annual Runoff Based on Sunspot Number
Runoff prediction is of great importance to water utilization and water-project regulation. Although sun activity has been considered an important factor in runoff, little modeling has been constructed. This study put forward a forecast heuristic combining back propagation neural network (BPNN) and particle swarm optimization (PSO) for annual runoff based on sunspot number and applied it to the Yellow River of China for the period 1956–2016 and assessed the contribution of the sunspot number by placing sole BPNN modeling on the time series as a contrast. First, the heuristic is made up of BPNN calibration and PSO optimization: (1) we use historical data to calibrate BPNN models and obtain a prediction of the sunspot number for training and testing stages; (2) we use the PSO to minimize the difference between the predicted runoff of both BPNN and a linear equation for forecasting stage. Second, the application offers interesting findings: (1) while BPNN calibration obtains first-class forecasting with the ratio >85% with <20% absolute error in training and testing stages, the PSO can achieve similar performance in the forecasting stage; (2) the heuristic can achieve better prediction in years with a lower sunspot number; (3) besides the influence of the sun activity, atmospheric circulation, water usage, and water-project regulation do play important roles on the measured or natural runoff to some extent. This study could provide useful insights into further forecasting of measured and natural runoff under this forecast heuristic in the world.
Open AccessA Forecast Heuristic of Back Propagation Neural Network and Particle Swarm Optimization for Annual Runoff Based on Sunspot Number
Runoff prediction is of great importance to water utilization and water-project regulation. Although sun activity has been considered an important factor in runoff, little modeling has been constructed. This study put forward a forecast heuristic combining back propagation neural network (BPNN) and particle swarm optimization (PSO) for annual runoff based on sunspot number and applied it to the Yellow River of China for the period 1956–2016 and assessed the contribution of the sunspot number by placing sole BPNN modeling on the time series as a contrast. First, the heuristic is made up of BPNN calibration and PSO optimization: (1) we use historical data to calibrate BPNN models and obtain a prediction of the sunspot number for training and testing stages; (2) we use the PSO to minimize the difference between the predicted runoff of both BPNN and a linear equation for forecasting stage. Second, the application offers interesting findings: (1) while BPNN calibration obtains first-class forecasting with the ratio >85% with <20% absolute error in training and testing stages, the PSO can achieve similar performance in the forecasting stage; (2) the heuristic can achieve better prediction in years with a lower sunspot number; (3) besides the influence of the sun activity, atmospheric circulation, water usage, and water-project regulation do play important roles on the measured or natural runoff to some extent. This study could provide useful insights into further forecasting of measured and natural runoff under this forecast heuristic in the world.
- Open Access
Reengineering and Its Reliability: An Analysis of Water Projects and Watershed Management under a Digital Twin Scheme in China
Water project and watershed management is currently being reengineered under digital twin schemes in China through pilot projects. An evaluation on pilot reengineering is important for its further implementation and improvement. This paper investigates national legislation and pilot projects’ implementations of a digital twin watershed and digital twin water project from the perspectives of design, policy, technology, investment, personnel, cyberspace security, co-construction, and sharing through interviews and expert review, and it uses a Bayesian network to study their reliability. First, the design of the digital twin watershed and digital twin water project is reasonable with regard to system architecture and business management. Second, although there are some national legislations on cyberspace security and geospatial data, they are incomplete for policy making and are probably infeasible for some technology. Third, there are insufficient mechanisms to sustainably support investment, personnel, and cyberspace security. Forth, co-construction and sharing are required for both inside and outside water departments. Fifth, the Bayesian network is useful for investigating the reliability of weak nodes, and it is helpful for the design and further implementation of the digital twin watershed and digital twin water project, as will be demonstrated with an anonymous example. This study could provide useful insights into the further reengineering of water projects and watershed management under a digital twin scheme in the world.
Open AccessReengineering and Its Reliability: An Analysis of Water Projects and Watershed Management under a Digital Twin Scheme in China
Water project and watershed management is currently being reengineered under digital twin schemes in China through pilot projects. An evaluation on pilot reengineering is important for its further implementation and improvement. This paper investigates national legislation and pilot projects’ implementations of a digital twin watershed and digital twin water project from the perspectives of design, policy, technology, investment, personnel, cyberspace security, co-construction, and sharing through interviews and expert review, and it uses a Bayesian network to study their reliability. First, the design of the digital twin watershed and digital twin water project is reasonable with regard to system architecture and business management. Second, although there are some national legislations on cyberspace security and geospatial data, they are incomplete for policy making and are probably infeasible for some technology. Third, there are insufficient mechanisms to sustainably support investment, personnel, and cyberspace security. Forth, co-construction and sharing are required for both inside and outside water departments. Fifth, the Bayesian network is useful for investigating the reliability of weak nodes, and it is helpful for the design and further implementation of the digital twin watershed and digital twin water project, as will be demonstrated with an anonymous example. This study could provide useful insights into the further reengineering of water projects and watershed management under a digital twin scheme in the world.