Yunrui Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Yunrui Wang has a total of 32 co-authors. Here are the top co-authors by number of shared publications:
Wenzhe Ren
School of Mechanical Engineering, Xi’an University of Science and Technology, Xi’an, CHINA
4 shared publications- Haoning Wang
School of Mechanical Engineering, Xi’an University of Science and Technology, Xi’an 710054, China
3 shared publications Zhaoyang Zheng
3 shared publicationsZiqiang Jiang
School of Mechanical Engineering, Xi’an University of Science and Technology, Xi’an, CHINA
3 shared publicationsChuanwei Zhang
School of Mechanical Engineering, Xi’an University of Science and Technology, Xi’an, Shaanxi, China
2 shared publicationsJuan Li
School of Mechanical Engineering, Xi’an University of Science and T echnology, Xi’an, China
2 shared publications
Latest Publications
- Open Access
- 22 October 2026
- Published by Elsevier in SSRN Electronic Journal
Sequential maintenance optimization for coal shearer faults: knowledge-graph-enhanced deep reinforcement learning with risk-adaptive reward weighting
Translating coal shearer fault-diagnosis results into executable maintenance decisions requires not only identifying fault conditions but also selecting appropriate maintenance actions as the fault state evolves. However, conventional reinforcement-learning formulations often rely on numerical state features and fixed reward weights, limiting their ability to represent relational maintenance knowledge and adapt objective preferences to changes in fault risk. This study proposes a knowledge-graph-enhanced dueling double deep Q-network with risk-adaptive reward weighting (KG-AR-D3QN) for sequential maintenance optimization. A domain-prior relational graph attention network encodes a state-specific local maintenance subgraph to capture complex relational knowledge associated with the current fault scenario. In parallel, an adaptive weighting network generates a three-dimensional objective-weight vector for maintenance success, cost, and duration according to equipment-hierarchy criticality and decision-state severity. The subgraph representation, reward weights, and candidate action features are integrated into the action-value network to estimate the long-term values of feasible maintenance actions and support sequential action selection. On the test set, compared with the baseline D3QN, KG-AR-D3QN increased mean discounted return by 20.12% and first-action success rate from 73.33% to 79.92%, while reducing mean repair steps by 6.52% and the oracle optimality gap by 41.49%. These results indicate that incorporating structured maintenance knowledge and risk-adaptive reward weighting improves sequential maintenance decision performance for coal shearer faults.
- 22 October 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessSequential maintenance optimization for coal shearer faults: knowledge-graph-enhanced deep reinforcement learning with risk-adaptive reward weighting
Translating coal shearer fault-diagnosis results into executable maintenance decisions requires not only identifying fault conditions but also selecting appropriate maintenance actions as the fault state evolves. However, conventional reinforcement-learning formulations often rely on numerical state features and fixed reward weights, limiting their ability to represent relational maintenance knowledge and adapt objective preferences to changes in fault risk. This study proposes a knowledge-graph-enhanced dueling double deep Q-network with risk-adaptive reward weighting (KG-AR-D3QN) for sequential maintenance optimization. A domain-prior relational graph attention network encodes a state-specific local maintenance subgraph to capture complex relational knowledge associated with the current fault scenario. In parallel, an adaptive weighting network generates a three-dimensional objective-weight vector for maintenance success, cost, and duration according to equipment-hierarchy criticality and decision-state severity. The subgraph representation, reward weights, and candidate action features are integrated into the action-value network to estimate the long-term values of feasible maintenance actions and support sequential action selection. On the test set, compared with the baseline D3QN, KG-AR-D3QN increased mean discounted return by 20.12% and first-action success rate from 73.33% to 79.92%, while reducing mean repair steps by 6.52% and the oracle optimality gap by 41.49%. These results indicate that incorporating structured maintenance knowledge and risk-adaptive reward weighting improves sequential maintenance decision performance for coal shearer faults.
- Open Access
- 16 July 2026
- Published by Polskie Naukowo-Techniczne Towarzystwo Eksploatacyjne in Eksploatacja i Niezawodność – Maintenance and Reliability
- Vol. 29 (1)
Dynamic Pricing Strategy for Maintenance Services Based on Equipment Degradation and Game Theory
In equipment maintenance, traditional methods often fail to characterize the equipment status, complicating service valuation. This study proposes a dynamic pricing strategy that integrates Gamma degradation modeling with Stackelberg game theory. Focusing on a single piece of equipment, the Gamma process is used to model its stochastic degradation, while preventive maintenance, replacement, and corrective maintenance strategies are combined to form a state-dependent dynamic maintenance rule. Using the Stackelberg game framework, key indicators like expected maintenance frequency and cost are embedded into the pricing model, creating the maintenance-decision pricing mechanism. Monte Carlo simulation solves the game equilibrium for the optimal inspection interval and price. Results show that an 11-day inspection interval achieves system equilibrium, with an optimal price of CNY 1.261 million. This strategy significantly improves the pricing scheme’s adaptability to the actual equipment conditions and enhances its industrial practicality.
- 16 July 2026
- Published by Polskie Naukowo-Techniczne Towarzystwo Eksploatacyjne in Eksploatacja i Niezawodność – Maintenance and Reliability
- Vol. 29 (1)
Open AccessDynamic Pricing Strategy for Maintenance Services Based on Equipment Degradation and Game Theory
In equipment maintenance, traditional methods often fail to characterize the equipment status, complicating service valuation. This study proposes a dynamic pricing strategy that integrates Gamma degradation modeling with Stackelberg game theory. Focusing on a single piece of equipment, the Gamma process is used to model its stochastic degradation, while preventive maintenance, replacement, and corrective maintenance strategies are combined to form a state-dependent dynamic maintenance rule. Using the Stackelberg game framework, key indicators like expected maintenance frequency and cost are embedded into the pricing model, creating the maintenance-decision pricing mechanism. Monte Carlo simulation solves the game equilibrium for the optimal inspection interval and price. Results show that an 11-day inspection interval achieves system equilibrium, with an optimal price of CNY 1.261 million. This strategy significantly improves the pricing scheme’s adaptability to the actual equipment conditions and enhances its industrial practicality.
- Open Access
- 14 June 2026
- Published by Springer Nature in Scientific Reports
- Vol. 16 (1)
Named entity recognition for coal mining machine assembly based on domain large language model
The assembly process of a coal mining machine generates complex unstructured textual data, which makes it difficult for workers to quickly understand and reason with during the assembly stage, thereby reducing operational efficiency. Traditional BERT-based Named Entity Recognition methods exhibit poor performance when faced with scarce and highly specialized datasets. To address this issue, this paper proposes a domain-specific large language model-based method for Named Entity Recognition. Firstly, foundational large language models are comparatively analyzed to select the one that best adapts to the coal mining machine domain data, enabling effective handling of the complex assembly data. Secondly, by applying the QLoRA fine-tuning method, the training parameters of the large language model are adjusted, which reduces the computational resource demands for building a domain-specific model while maintaining performance. Finally, the model is fine-tuned and evaluated on a real-world coal mining machine assembly dataset. Experimental results demonstrate that the QLoRA fine-tuning leads to a significant performance improvement: the BLEU-4 score increases from 6.1225 to 65.8013, and the F1-Score for the NER task reaches 0.893. The proposed method improves the accuracy for the NER task in coal mining machine assembly and is of significant importance for assisting workers in understanding assembly information.
- 14 June 2026
- Published by Springer Nature in Scientific Reports
- Vol. 16 (1)
Open AccessNamed entity recognition for coal mining machine assembly based on domain large language model
The assembly process of a coal mining machine generates complex unstructured textual data, which makes it difficult for workers to quickly understand and reason with during the assembly stage, thereby reducing operational efficiency. Traditional BERT-based Named Entity Recognition methods exhibit poor performance when faced with scarce and highly specialized datasets. To address this issue, this paper proposes a domain-specific large language model-based method for Named Entity Recognition. Firstly, foundational large language models are comparatively analyzed to select the one that best adapts to the coal mining machine domain data, enabling effective handling of the complex assembly data. Secondly, by applying the QLoRA fine-tuning method, the training parameters of the large language model are adjusted, which reduces the computational resource demands for building a domain-specific model while maintaining performance. Finally, the model is fine-tuned and evaluated on a real-world coal mining machine assembly dataset. Experimental results demonstrate that the QLoRA fine-tuning leads to a significant performance improvement: the BLEU-4 score increases from 6.1225 to 65.8013, and the F1-Score for the NER task reaches 0.893. The proposed method improves the accuracy for the NER task in coal mining machine assembly and is of significant importance for assisting workers in understanding assembly information.
- Open Access
- 15 February 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (4) , 1943
Entity Recognition for Coal Mine Hydraulic Support Installation Process Driven by LLM LoRA Fine-Tuning
Hydraulic supports, being the pivotal equipment in coal mining face operations, exhibit complex installation procedure knowledge that impedes efficient knowledge extraction and utilization, thereby hindering the provision of scientifically grounded installation guidance and ultimately affecting equipment installation efficiency. This study proposes the development of a domain-specific large-scale model utilizing named entity recognition (NER) for knowledge extraction to enhance the efficiency of hydraulic shield installation. Initially, a few-shot data augmentation method is introduced to enrich hydraulic shield assembly process data, thereby providing a robust dataset for fine-tuning the large language model (LLM). Subsequently, Low-Rank Adaptation (LoRA) fine-tuning techniques are leveraged to optimize large-scale model adaptation. Comparative analysis of the model’s performance post-fine-tuning was conducted using multiple evaluation metrics, revealing that the fine-tuned Deepseek-R1-7b-Distill model exhibited the most superior performance indicators. Ultimately, the fine-tuned Deepseek-R1-7b-Distill model was selected as the domain-specific LLM for NER in hydraulic support installation processes. The experimental results demonstrate that the entity recognition F1 score across all entity types reached 0.8887, validating the efficacy of the methodology. This provides technical support for enhancing the installation efficiency of hydraulic supports.
- 15 February 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (4) , 1943
Open AccessEntity Recognition for Coal Mine Hydraulic Support Installation Process Driven by LLM LoRA Fine-Tuning
Hydraulic supports, being the pivotal equipment in coal mining face operations, exhibit complex installation procedure knowledge that impedes efficient knowledge extraction and utilization, thereby hindering the provision of scientifically grounded installation guidance and ultimately affecting equipment installation efficiency. This study proposes the development of a domain-specific large-scale model utilizing named entity recognition (NER) for knowledge extraction to enhance the efficiency of hydraulic shield installation. Initially, a few-shot data augmentation method is introduced to enrich hydraulic shield assembly process data, thereby providing a robust dataset for fine-tuning the large language model (LLM). Subsequently, Low-Rank Adaptation (LoRA) fine-tuning techniques are leveraged to optimize large-scale model adaptation. Comparative analysis of the model’s performance post-fine-tuning was conducted using multiple evaluation metrics, revealing that the fine-tuned Deepseek-R1-7b-Distill model exhibited the most superior performance indicators. Ultimately, the fine-tuned Deepseek-R1-7b-Distill model was selected as the domain-specific LLM for NER in hydraulic support installation processes. The experimental results demonstrate that the entity recognition F1 score across all entity types reached 0.8887, validating the efficacy of the methodology. This provides technical support for enhancing the installation efficiency of hydraulic supports.
- Open Access
- 1 January 2026
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 22 (4) , 2070-2091
A digital twin-driven installation resource dynamic scheduling method of fully mechanized mining faces
Existing resource scheduling methods for fully mechanized mining face installation fail to account for variations in resource demand during the installation process, resulting in resource shortages or redundancies that cause delays and disrupt normal production continuity. Here, we propose a digital twin-driven dynamic installation resource scheduling approach, integrating digital twin technology, neural network-based demand forecasting, and multi-objective optimization. A hierarchical digital twin system was constructed, comprising the twin model layer, data layer, and physical entity layer, which collaboratively facilitated real-time, adaptive scheduling of installation resources. The mechanism was elucidated through two phases: Pre-installation resource configuration and in-process dynamic scheduling, achieving closed-loop optimization of the installation resource management. Additionally, a real-time mapped twin model layer was developed to reflect the current state of the physical installation environment. The demand forecasting model employed an Adam-LSTM neural network to quantify installation resource requirements, generating demand predictions. The dynamic scheduling model utilized multi-objective optimization to balance physical constraints and operational goals, integrating demand forecasts to simulate the physical resource allocation process and derive optimal scheduling schemes. Application of this methodology to actual installation operations demonstrated that, compared to traditional approaches, the dynamic scheduling scheme reduced total costs by 75.66%, potential revenue loss by 73.35%, and inventory holding costs by 93.58%, offering a novel solution for rapid relocation of fully mechanized mining faces.
- 1 January 2026
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 22 (4) , 2070-2091
Open AccessA digital twin-driven installation resource dynamic scheduling method of fully mechanized mining faces
Existing resource scheduling methods for fully mechanized mining face installation fail to account for variations in resource demand during the installation process, resulting in resource shortages or redundancies that cause delays and disrupt normal production continuity. Here, we propose a digital twin-driven dynamic installation resource scheduling approach, integrating digital twin technology, neural network-based demand forecasting, and multi-objective optimization. A hierarchical digital twin system was constructed, comprising the twin model layer, data layer, and physical entity layer, which collaboratively facilitated real-time, adaptive scheduling of installation resources. The mechanism was elucidated through two phases: Pre-installation resource configuration and in-process dynamic scheduling, achieving closed-loop optimization of the installation resource management. Additionally, a real-time mapped twin model layer was developed to reflect the current state of the physical installation environment. The demand forecasting model employed an Adam-LSTM neural network to quantify installation resource requirements, generating demand predictions. The dynamic scheduling model utilized multi-objective optimization to balance physical constraints and operational goals, integrating demand forecasts to simulate the physical resource allocation process and derive optimal scheduling schemes. Application of this methodology to actual installation operations demonstrated that, compared to traditional approaches, the dynamic scheduling scheme reduced total costs by 75.66%, potential revenue loss by 73.35%, and inventory holding costs by 93.58%, offering a novel solution for rapid relocation of fully mechanized mining faces.
- Open Access
- 28 November 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (23) , 11101
Data-Driven and Model-Driven Integration Approach for Optimizing Equipment Safety Investment in Digital Twin Coal Mining Enterprises
In coal mining companies, investment in equipment safety plays a crucial role in improving equipment safety and ensuring worker safety. To address issues such as subjective and uncertain equipment safety investment methods leading to irrational resource allocation and poor safety and economic outcomes in coal mining enterprises, a data- and model-driven approach based on digital twin technology is proposed for optimizing safety investment and predicting accident losses in coal mine equipment. The effectiveness of the investment optimization plan is validated by predicting accident losses post-implementation, ensuring maximized safety and economic benefits of the investment plan. Finally, using S company’s equipment safety investment as a case study, the proposed method is validated. Experimental results demonstrate that the optimized investment plan reduces accident losses by 11.73% compared to traditional coal mine equipment safety investment schemes. Furthermore, in accident loss prediction, the IPSO-BP model (R2 = 0.99) outperforms traditional PSO-BP (R2 = 0.96) and BP (R2 = 0.93) models, showing higher accuracy and suitability for accident loss prediction.
- 28 November 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (23) , 11101
Open AccessData-Driven and Model-Driven Integration Approach for Optimizing Equipment Safety Investment in Digital Twin Coal Mining Enterprises
In coal mining companies, investment in equipment safety plays a crucial role in improving equipment safety and ensuring worker safety. To address issues such as subjective and uncertain equipment safety investment methods leading to irrational resource allocation and poor safety and economic outcomes in coal mining enterprises, a data- and model-driven approach based on digital twin technology is proposed for optimizing safety investment and predicting accident losses in coal mine equipment. The effectiveness of the investment optimization plan is validated by predicting accident losses post-implementation, ensuring maximized safety and economic benefits of the investment plan. Finally, using S company’s equipment safety investment as a case study, the proposed method is validated. Experimental results demonstrate that the optimized investment plan reduces accident losses by 11.73% compared to traditional coal mine equipment safety investment schemes. Furthermore, in accident loss prediction, the IPSO-BP model (R2 = 0.99) outperforms traditional PSO-BP (R2 = 0.96) and BP (R2 = 0.93) models, showing higher accuracy and suitability for accident loss prediction.
- Open Access
- 11 September 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (18) , 8178
A Multi-Customer Vehicle Scheduling Optimization Method for Coal Intelligent Loading System
Intelligent loading systems are extensively employed in coal enterprises. Nevertheless, pre-loading customer vehicle scheduling predominantly depends on manual expertise. This frequently results in extended vehicle waiting periods, elevated carbon emissions, and reduced customer satisfaction, particularly in multi-customer scenarios. Therefore, this study introduces a multi-customer vehicle scheduling optimization approach for an intelligent coal loading system. Customer priorities are first identified to enhance satisfaction. Considering various customers and enterprise factors, the multi-customer vehicle scheduling model is established to minimize the total cost. The optimal vehicle scheduling scheme is obtained by using the enhanced sparrow search algorithm. The validity of the proposed approach is demonstrated through a case study of a coal mining enterprise. The results show that the total cost of the optimized plan was 79% lower than the traditional plan, which means a significant reduction in vehicle waiting time, and an improvement in customer satisfaction.
- 11 September 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (18) , 8178
Open AccessA Multi-Customer Vehicle Scheduling Optimization Method for Coal Intelligent Loading System
Intelligent loading systems are extensively employed in coal enterprises. Nevertheless, pre-loading customer vehicle scheduling predominantly depends on manual expertise. This frequently results in extended vehicle waiting periods, elevated carbon emissions, and reduced customer satisfaction, particularly in multi-customer scenarios. Therefore, this study introduces a multi-customer vehicle scheduling optimization approach for an intelligent coal loading system. Customer priorities are first identified to enhance satisfaction. Considering various customers and enterprise factors, the multi-customer vehicle scheduling model is established to minimize the total cost. The optimal vehicle scheduling scheme is obtained by using the enhanced sparrow search algorithm. The validity of the proposed approach is demonstrated through a case study of a coal mining enterprise. The results show that the total cost of the optimized plan was 79% lower than the traditional plan, which means a significant reduction in vehicle waiting time, and an improvement in customer satisfaction.
- 4 January 2024
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 130 (7-8) , 3469-3480
Knowledge driven multiview bill of material reconfiguration for complex products in the digital twin workshop
- 4 January 2024
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 130 (7-8) , 3469-3480
Knowledge driven multiview bill of material reconfiguration for complex products in the digital twin workshop
- 14 September 2023
- Published by Taylor & Francis in International Journal of Computer Integrated Manufacturing
- Vol. 37 (1-2) , 149-164
Research on dynamic scheduling and perception method of assembly resources based on digital twin
- 14 September 2023
- Published by Taylor & Francis in International Journal of Computer Integrated Manufacturing
- Vol. 37 (1-2) , 149-164
Research on dynamic scheduling and perception method of assembly resources based on digital twin