ZBZhizao Bao

Zhizao Bao

*This is an algorithmically generated author record based on publicly available information.

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Zhizao Bao has a total of 16 co-authors. Here are the top co-authors by number of shared publications:

  • Xiaohua Bao

    State Key Laboratory of Intelligent Geotechnics and Tunnelling, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen, China

    5 shared publications
  • Jun Shen

    State Key Laboratory of Intelligent Geotechnics and Tunnelling, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China

    3 shared publications
  • Xianlong Wu

    College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China

    3 shared publications
  • Hongzhi Cui

    Guangdong Engineering and Technology Research Center for Low-Carbon and Energy-Saving Buildings, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen, China

    2 shared publications
  • Lijuan Li

    State Key Laboratory of Intelligent Geotechnics and Tunnelling, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China

    2 shared publications
  • Xiangsheng Chen

    State Key Laboratory of Intelligent Geotechnics and Tunnelling, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China

    2 shared publications

Latest Publications

  • Open Access

    Seismic Resilience Evolution of Shield Tunnel with Structure Degradation

    by Hongzhi Cui, Ran Tao, Xiaohua Bao, Xianlong Wu, Tong Qiu, Jun Shen, Zhen Han, Xiangsheng Chen

    The structural performance of shield tunnel structures is highly susceptible to degradation under complex environmental loads, with the most common manifestation being bolt preload loss. In this study, a shield tunnel numerical simulation model was established to analyze the seismic response of shield tunnels with varying degrees of bolt preload loss. Firstly, the deformation patterns of shield tunnel structures under seismic loads were analyzed. Subsequently, ellipticity and joint opening were selected as seismic resilience assessment indicators based on the mechanical response. A seismic resilience assessment model was then established, including three states: normal state, affected state, and recovered state. The results show a direct relationship between the recovery capacity of tunnel structures and the initial performance of the lining structure, as well as the magnitude of the load. The lower the degree of structure degradation, the greater the structural recovery capacity. Additionally, there is a positive correlation between residual deformation and the initial performance loss of shield tunnel structures, as well as the intensity of seismic loads. This study contributes to enriching the theoretical framework for the seismic resilience assessment of shield tunnels, which have significant implications and provide valuable references for engineering safety.


  • Open Access

    Study on the Performance of Twin Shield Tunnel Excavation below Existing Multi-Arch Culvert Bridge in Close Vicinity

    by Xiaohua Bao, Zhizao Bao, Jun Shen, Shidong Wu, Shuming Yang, Xiangsheng Chen

    Various adjacent construction projects are inevitably encountered during the large-scale construction of urban underground transportation. The case of a twin shield tunnel excavated below an existing multi-arch culvert bridge in close vicinity has not yet been thoroughly studied. A case of a shield tunnel excavation below an existing multi-arch culvert bridge in Foshan is presented. First, a fully coupled three-dimensional model incorporating fluid and solid interactions was established to simulate the twin shield tunnel excavation below the existing multi-arch culvert bridge in close vicinity. Subsequently, the numerical model was validated using the modified Peck empirical formula. Finally, the influence of different foundation reinforcement deformation moduli, tunnel excavation face support pressures and grouting pressures on ground deformation was discussed. The results indicate that the area most significantly affected by the excavation of the tunnel passing underneath is not within the section of the multi-arch culvert bridge after applying the foundation reinforcement design. The area most significantly impacted is concentrated as the shield tunnel commences excavation and advances beneath the location corresponding to the 1-hole of the steel corrugated pipe. The range of influence of the ground disturbance extends approximately 7 m in front of the excavation face before the tunnel passed through. The range of ground disturbance decreases to 4–6 m in front of the excavation face after the tunnel passed through. The excavation face support pressure and grouting pressure have a minor impact on the settlement of the multi-arch culvert bridge under this reinforcement design. The results provide useful references for the reinforcement design for tunnel excavation adjacent to existing structures.


  • Open Access

    Laboratory Tests and Numerical Simulation of the Thermal–Mechanical Response of a Fiber-Reinforced Phase Change Concrete Pile

    by Xiaohua Bao, Jiaxin Shi, Guancong Chen, Yingpeng Li, Jinxin Hu, Hongzhi Cui

    The critical problem restricting the development and application of phase change energy piles is that adding phase change materials to concrete generally reduces its thermal conductivity. Therefore, exploring a scheme to improve the heat transfer performance of phase change energy piles is necessary. In this study, steel fibers were added to energy piles to enhance the heat exchange capacity between the pile and the surrounding soil. The model tests were conducted on two types of energy piles: a fiber-reinforced pile and a fiber-reinforced phase change pile. Based on laboratory tests, a three-dimensional thermo–hydro–mechanical coupled finite-element model was established to characterize the phase transformation process of FRPC piles accurately. Then, the thermal parameters of the phase change concrete pile were optimized and analyzed to explore the feasibility of improving the application of the phase change pile. The results reveal that the cooling condition where the initial ground temperature was higher than the phase change temperature was more suitable for the FRPC pile. When the flow rate was increased by 50%, the peak heat power of the FRPC pile increased by 25.7%. There is an optimal economic flow rate to balance the system’s energy consumption and heat power in different conditions. Increasing thermal conductivity and specific heat capacity are effective solutions to improve the heat transfer capacity of concrete piles. The energy pile that was enhanced with the high-thermal-conductivity PCM is a good choice to improve long-term operation performance.


  • Open Access

    Investigation of the Water-Retention Characteristics and Mechanical Behavior of Fibre-Reinforced Unsaturated Sand

    by Xiaohua Bao, Zhizao Bao, Lijuan Li, Yingpeng Li, Peng Peng, Xiangsheng Chen

    The introduction of fibres into soil can effectively improve its engineering properties. Systematically understanding the unsaturated mechanical properties of fibre-reinforced soil is highly significant. Moreover, there is currently no suitable model for describing the water-retention characteristics of unsaturated fibre-reinforced soil. The purpose of this study is to propose a model for the soil–water characteristic curve (SWCC) that can accurately describe unsaturated fibre-reinforced soil. The research focuses on unsaturated sand reinforced with PP fibres. A series of compression and direct shear tests were performed to investigate the mechanical behaviour. In addition, the SWCC was measured using the axis-translation technique. Based on the van Genuchten (VG) model, a modified model considering fibre reinforcement (VG-CFR) is developed for quantitatively analysing the influence of fibre content on the SWCC. The results showed that the established VG-CFR model can reflect the water-retention characteristics of fibre-reinforced sand.


  • Open Access

    Deformation Characteristics of Pipelines Due to Adjacent Excavation in Riprap Reclamation Strata

    by Xiaohua Bao, Chunxun Liu, Lijuan Li, Jun Shen, Jihao Pan, Qijun Dong, Xiangsheng Chen

    The Shenzhen Ma Wan area has special geotechnical conditions, with more than 50% of the area being reclaimed rock formations. Riprap reclamation strata are particularly susceptible to significant deformation upon stress release. To comprehensively comprehend the reaction of existing pipelines to the excavation of an adjacent deep foundation pit within the riprap reclamation strata, an interaction of the soil–pipeline was conducted by encompassing both scaled model tests and numerical simulations based on a cross-sea channel project. Firstly, scaled model tests were performed on a soil–pipeline interaction caused by excavation. Subsequently, the numerical model was verified by comparing the numerical simulation results with the scaled model test results. Then, the internal force, strain of the pipeline, and soil surface deformation under the conditions of a soil layer with riprap were analyzed, and the results were compared with the case without riprap. Finally, the influence of the support structures was analyzed. The results indicated that the presence of the riprap in strata led to a 19% increase in vertical displacement of the ground surface and a 35% increase in the pipeline bending moment compared with the case without riprap in the same strata. The maximum internal force and strain occurred at an inclined angle of 45° in the pipeline section. Furthermore, it was found that the first lateral support after excavation played a pivotal role in controlling the overall deformation of the foundation pit. The changes in stiffness in the lateral support were more sensitive to the horizontal displacement than the vertical displacement of the pipeline. The results provide valuable insights for the design and safety evaluation of engineering projects in riprap reclamation strata.