Miaotong Luo
Research Subjects
Research Interests
Miaotong Luo has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Junzhou Zhu
College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China
1 shared publication - Ning Liang
College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China
1 shared publication - Qi Lv1 shared publication
- Shun Wang1 shared publication
- Xiaolong Zhang
Guangdong Hualu Transport Technology Co., Ltd., Guangzhou 510420, China
1 shared publication - Yanbin Fu
College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China
1 shared publication
Latest Publications
- Open Access
- 16 October 2023
- Published by MDPI AG in Preprints.org
Synchronous Grouting Analysis of Shield Tunneling through High Water Pressure Fault Fracture Zone
Using numerical software to establish a three-dimensional geological model of shield tunneling through fault fracture zones, considering the synchronous grouting effect at the shield tail, the disturbance of various geotechnical structures in the fault fracture zone under deep burial and high water pressure conditions is studied. According to the comparison between the numerical model analysis results and the on-site inspection results of the entire process of Shiziyang B3 section, synchronous grouting at the shield tail is the main reason for the changes in soil and water pressure in the fault fracture zone area. The soil and water pressure changes strongly during shield tunneling, and the maximum excess pore pressure value occurs when the shield tail passes. When the shield tunneling machine is far away, the soil and water stress shows a downward trend. The impact of synchronous grouting decreases with the increase of tunneling distance. Due to the difference in permeability, the variation law of pore pressure in the fault fracture zone is significantly different from the original rock, leading to a faster increase in pore pressure in the fracture zone area and a wider range of influence.
- 16 October 2023
- Published by MDPI AG in Preprints.org
Open AccessSynchronous Grouting Analysis of Shield Tunneling through High Water Pressure Fault Fracture Zone
Using numerical software to establish a three-dimensional geological model of shield tunneling through fault fracture zones, considering the synchronous grouting effect at the shield tail, the disturbance of various geotechnical structures in the fault fracture zone under deep burial and high water pressure conditions is studied. According to the comparison between the numerical model analysis results and the on-site inspection results of the entire process of Shiziyang B3 section, synchronous grouting at the shield tail is the main reason for the changes in soil and water pressure in the fault fracture zone area. The soil and water pressure changes strongly during shield tunneling, and the maximum excess pore pressure value occurs when the shield tail passes. When the shield tunneling machine is far away, the soil and water stress shows a downward trend. The impact of synchronous grouting decreases with the increase of tunneling distance. Due to the difference in permeability, the variation law of pore pressure in the fault fracture zone is significantly different from the original rock, leading to a faster increase in pore pressure in the fracture zone area and a wider range of influence.