Ruqaya Al-Sabah
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Ruqaya Al-Sabah has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Mohamed Tantawy
Department of Civil Engineering, Faculty of Engineering-Mataria, Helwan University, Cairo 11718, Egypt
5 shared publications - Salah Omar Said
Helwan Univ
4 shared publications - Mohamed Salem
Department of Civil Engineering, College of Engineering, Australian University of Kuwait, Safat 13015, Kuwait
3 shared publications - Ahmed Mahmoud Elganzory
Department of Civil Engineering, Faculty of Engineering-Mataria, Capital University, Cairo 11795, Egypt
2 shared publications - Ahmed Mohammed Abdelalim
Professor of Construction Management, Project Management and Sustainable Construction Program, PMSC Founder, Civil Engineering Department, Faculty of Engineering, Helwan University-Mataria Branch, P.O. Box 11718, Cairo, Egypt, Egypt
2 shared publications - Mohamed Ramadan Ezz Al Regal
Faculty of Engineering at Mataria, Helwan University, Cairo 11795, Egypt
2 shared publications
Latest Publications
- Open Access
An Integrated Computer Vision Framework for Construction Equipment Monitoring, Utilization Analytics, and Decision Support
Effective construction-equipment monitoring requires persistent equipment-level information linking visual observations to utilization and planning decisions. This study develops and evaluates an identity-centered framework integrating ten-class YOLOv8m detection, ByteTrack tracking, AprilTag-assisted Global ID reconciliation, scale-normalized motion-state estimation, utilization accounting, and rule-based reallocation support. The selected detector achieved 90.80% micro-F1 on the held-out ConstructionXC7C benchmark (757 images, eight annotated categories). In a matched comparison, selected-checkpoint micro-F1 reached 92.52%, exceeding the original checkpoint by 16.11 percentage points. Across 6000 experimental video frames, 5757 of 5992 annotated excavator observations were matched, with 99.81% adjacent camera–local ID consistency. A controlled 192-pair simulated-transition study associated all 144 same-object pairs using ideal deterministic identity tokens, compared with 99 using a tuned appearance-only baseline; regression tests verified preservation of accumulated equipment histories. In a separate matched analysis of 1040 observations, temporal activity modeling improved idle-state discrimination and reduced video-level sampled-utilization mean absolute error by 41.92 percentage points, achieving an error of 15.11 percentage points. Controlled verification further demonstrated state-service functionality and reviewable zone-reallocation advisories. These findings provide quantitative evidence of component-level performance and traceable monitoring-to-decision functionality, establishing a technical foundation for subsequent construction-site evaluation.
Open AccessAn Integrated Computer Vision Framework for Construction Equipment Monitoring, Utilization Analytics, and Decision Support
Effective construction-equipment monitoring requires persistent equipment-level information linking visual observations to utilization and planning decisions. This study develops and evaluates an identity-centered framework integrating ten-class YOLOv8m detection, ByteTrack tracking, AprilTag-assisted Global ID reconciliation, scale-normalized motion-state estimation, utilization accounting, and rule-based reallocation support. The selected detector achieved 90.80% micro-F1 on the held-out ConstructionXC7C benchmark (757 images, eight annotated categories). In a matched comparison, selected-checkpoint micro-F1 reached 92.52%, exceeding the original checkpoint by 16.11 percentage points. Across 6000 experimental video frames, 5757 of 5992 annotated excavator observations were matched, with 99.81% adjacent camera–local ID consistency. A controlled 192-pair simulated-transition study associated all 144 same-object pairs using ideal deterministic identity tokens, compared with 99 using a tuned appearance-only baseline; regression tests verified preservation of accumulated equipment histories. In a separate matched analysis of 1040 observations, temporal activity modeling improved idle-state discrimination and reduced video-level sampled-utilization mean absolute error by 41.92 percentage points, achieving an error of 15.11 percentage points. Controlled verification further demonstrated state-service functionality and reviewable zone-reallocation advisories. These findings provide quantitative evidence of component-level performance and traceable monitoring-to-decision functionality, establishing a technical foundation for subsequent construction-site evaluation.
- Open Access
Construction Equipment Monitoring Research: A Bibliometric and Scientometric Analysis of Trends and Emerging Directions
Construction equipment monitoring has shifted from manual logbooks and early telematics toward intelligent digital systems, driven by the need to reduce delays in obtaining equipment data and improve decision-making on construction sites. This study examines research on construction equipment monitoring and tracking published between 2000 and 2026 to identify the evolution, major themes, and emerging directions in the field. A scientometric and bibliometric analysis was conducted on 1093 bibliographic records retrieved from Scopus and Web of Science on 20 May 2026. The annual publication trend was evaluated through 2025, the last complete publication year, while records indexed in 2026 were retained for the remaining corpus-level analyses. The datasets were preprocessed and analyzed using Bibliometrix, VOSviewer, and CiteSpace to examine publication trends, keyword networks, collaboration patterns, citation structures, and research clusters. The keyword network was interpreted through six major thematic clusters, which were synthesized into four broader knowledge streams covering operations and sensing, AI-based perception, safety monitoring, and BIM/digital-twin integration. The results show a substantial increase in the representation of AI- and perception-related research across the later publication periods, reflecting a transition from basic sensor-based approaches toward more intelligent and connected site systems. The study identifies leading contributors and comparatively underdeveloped research priorities, particularly real-time idle-state detection, multimodal data fusion, multi-site validation, and the integration of monitoring outputs with BIM and digital-twin decision-support environments.
Open AccessConstruction Equipment Monitoring Research: A Bibliometric and Scientometric Analysis of Trends and Emerging Directions
Construction equipment monitoring has shifted from manual logbooks and early telematics toward intelligent digital systems, driven by the need to reduce delays in obtaining equipment data and improve decision-making on construction sites. This study examines research on construction equipment monitoring and tracking published between 2000 and 2026 to identify the evolution, major themes, and emerging directions in the field. A scientometric and bibliometric analysis was conducted on 1093 bibliographic records retrieved from Scopus and Web of Science on 20 May 2026. The annual publication trend was evaluated through 2025, the last complete publication year, while records indexed in 2026 were retained for the remaining corpus-level analyses. The datasets were preprocessed and analyzed using Bibliometrix, VOSviewer, and CiteSpace to examine publication trends, keyword networks, collaboration patterns, citation structures, and research clusters. The keyword network was interpreted through six major thematic clusters, which were synthesized into four broader knowledge streams covering operations and sensing, AI-based perception, safety monitoring, and BIM/digital-twin integration. The results show a substantial increase in the representation of AI- and perception-related research across the later publication periods, reflecting a transition from basic sensor-based approaches toward more intelligent and connected site systems. The study identifies leading contributors and comparatively underdeveloped research priorities, particularly real-time idle-state detection, multimodal data fusion, multi-site validation, and the integration of monitoring outputs with BIM and digital-twin decision-support environments.
- Open Access
Critical Success Factors for the Widespread Adoption of Virtual Alternative Dispute Resolution (VADR) in the Construction Industry: A Structural Equation Modeling Analysis
This study explores the increasing adoption of virtual alternative dispute resolution (VADR) in the construction industry, enhancing efficiency and accessibility in dispute resolution. VADR is crucial for streamlining processes and reducing participation barriers. The study aims to investigate the critical success factors (CSFs) influencing the adoption of VADR in the construction sector. Given the rising importance of VADR technologies, understanding the key factors driving their acceptance is crucial. The background highlights the growing reliance on innovative technologies to boost operational efficiency and decision-making processes. The data for the study were collected using a cross-sectional design with online structured survey questionnaire (N = 97) from diversified construction industries. Using Smart PLS 4, structural equation modeling (SEM) was employed to test the validity, reliability, and proposed hypotheses of the study. The results showed that cost factors had the greatest impact on VADR acceptance, followed by user competence and training, procedural adaptability, and technological infrastructure. Logistical assistance and legal frameworks also had a considerable favorable impact. However, stakeholder buy-in had no significant influence on VADR implementation. The implications indicate that economic feasibility, logistical readiness, flexible procedures, supportive legal contexts, and user skills are significant factors for successful VADR integration. Governments and organizations should deploy VADR technologies to encourage innovation and operational improvement in the construction industry.
Open AccessCritical Success Factors for the Widespread Adoption of Virtual Alternative Dispute Resolution (VADR) in the Construction Industry: A Structural Equation Modeling Analysis
This study explores the increasing adoption of virtual alternative dispute resolution (VADR) in the construction industry, enhancing efficiency and accessibility in dispute resolution. VADR is crucial for streamlining processes and reducing participation barriers. The study aims to investigate the critical success factors (CSFs) influencing the adoption of VADR in the construction sector. Given the rising importance of VADR technologies, understanding the key factors driving their acceptance is crucial. The background highlights the growing reliance on innovative technologies to boost operational efficiency and decision-making processes. The data for the study were collected using a cross-sectional design with online structured survey questionnaire (N = 97) from diversified construction industries. Using Smart PLS 4, structural equation modeling (SEM) was employed to test the validity, reliability, and proposed hypotheses of the study. The results showed that cost factors had the greatest impact on VADR acceptance, followed by user competence and training, procedural adaptability, and technological infrastructure. Logistical assistance and legal frameworks also had a considerable favorable impact. However, stakeholder buy-in had no significant influence on VADR implementation. The implications indicate that economic feasibility, logistical readiness, flexible procedures, supportive legal contexts, and user skills are significant factors for successful VADR integration. Governments and organizations should deploy VADR technologies to encourage innovation and operational improvement in the construction industry.
- Open Access
Variations and Claims in International Construction Projects in the MENA Region from the Last Decade
This study delves into the dynamics of ‘Variations’ and ‘Claims’ in construction projects. This study aims to identify, categorize, and devise mitigation strategies for critical types of variations and claims that are aligned with the contract’s FIDIC conditions. The research draws on input from construction industry professionals, including contract administrators and project managers, and focuses on the MENA region. The region’s extensive adoption of FIDIC standards and the rapidly growing construction sector drive this choice. Data collection encompassed a questionnaire distributed to 80 industry experts, predominantly through interviews focused on countries such as Saudi Arabia, the UAE, Kuwait, and Egypt. Utilizing SPSS-V.25 for statistical analysis, this study uncovers the most prevalent and impactful causes of variations and claims, highlighting the critical need for managerial intervention. A key feature is the integration of scientometric analysis into a quantitative finding. Implementing a k-means clustering analysis is a significant addition to the methodology. The survey had high internal consistency with a Cronbach’s alpha of 0.97, and the respondents reported frequent and significant claims such as delayed drawings, ambiguous documents, and client changes. The results showed that effective claims management requires clear communication and balanced contracts, while poor design and contract documentation cause variations and claims. The correlation analysis showed strong positive correlations between claim types and causes. To reduce claims and address these factors, most respondents said the survey could predict and reduce claims.
Open AccessVariations and Claims in International Construction Projects in the MENA Region from the Last Decade
This study delves into the dynamics of ‘Variations’ and ‘Claims’ in construction projects. This study aims to identify, categorize, and devise mitigation strategies for critical types of variations and claims that are aligned with the contract’s FIDIC conditions. The research draws on input from construction industry professionals, including contract administrators and project managers, and focuses on the MENA region. The region’s extensive adoption of FIDIC standards and the rapidly growing construction sector drive this choice. Data collection encompassed a questionnaire distributed to 80 industry experts, predominantly through interviews focused on countries such as Saudi Arabia, the UAE, Kuwait, and Egypt. Utilizing SPSS-V.25 for statistical analysis, this study uncovers the most prevalent and impactful causes of variations and claims, highlighting the critical need for managerial intervention. A key feature is the integration of scientometric analysis into a quantitative finding. Implementing a k-means clustering analysis is a significant addition to the methodology. The survey had high internal consistency with a Cronbach’s alpha of 0.97, and the respondents reported frequent and significant claims such as delayed drawings, ambiguous documents, and client changes. The results showed that effective claims management requires clear communication and balanced contracts, while poor design and contract documentation cause variations and claims. The correlation analysis showed strong positive correlations between claim types and causes. To reduce claims and address these factors, most respondents said the survey could predict and reduce claims.
- Open Access
- 17 July 2024
- Published by MDPI AG in Preprints.org
Variations and Claims in International Construction Projects in the MENA Region from Last Decade
This study delves into the dynamics of 'Variations' and 'Claims' within construction projects, specifically under the FIDIC-Red Book 1999 framework. The study aims to identify, categorize, and devise mitigation strategies for key types of variations and claims aligning with the FIDIC conditions of contract. The research is drawing on inputs from construction industry professionals including contract administrators and project managers, focusing on the MENA region. This choice is driven by the region's extensive adoption of FIDIC standards and its rapidly growing construction sector. Data collection encompassed a questionnaire distributed to 80 industry experts predominantly through interviews that focused on countries like Saudi Arabia, UAE, Kuwait, and Egypt. These locations were chosen to reflect diverse construction practices and the involvement of international firms. Utilizing SPSS-V.25 for statistical analysis, the study uncovers the most prevalent and impactful causes of variations and claims, highlighting the critical need for managerial intervention. A key feature is the integration of scientometric analysis for a quantitative finding. A significant addition to the methodology is the implementation of a k-means clustering analysis. The survey had high internal consistency with a Cronbach's alpha of 0.97, and respondents reported frequent and significant claims like delayed drawings, ambiguous documents, and client changes. The results showed that effective claims management requires clear communication and balanced contracts, while poor design and contract documentation cause variations and claims. Spearman's correlation showed strong positive relationships between certain claim types and causes, emphasizing the importance of dealing with these factors to reduce claims. Most respondents said the survey could predict and reduce claims.
- 17 July 2024
- Published by MDPI AG in Preprints.org
Open AccessVariations and Claims in International Construction Projects in the MENA Region from Last Decade
This study delves into the dynamics of 'Variations' and 'Claims' within construction projects, specifically under the FIDIC-Red Book 1999 framework. The study aims to identify, categorize, and devise mitigation strategies for key types of variations and claims aligning with the FIDIC conditions of contract. The research is drawing on inputs from construction industry professionals including contract administrators and project managers, focusing on the MENA region. This choice is driven by the region's extensive adoption of FIDIC standards and its rapidly growing construction sector. Data collection encompassed a questionnaire distributed to 80 industry experts predominantly through interviews that focused on countries like Saudi Arabia, UAE, Kuwait, and Egypt. These locations were chosen to reflect diverse construction practices and the involvement of international firms. Utilizing SPSS-V.25 for statistical analysis, the study uncovers the most prevalent and impactful causes of variations and claims, highlighting the critical need for managerial intervention. A key feature is the integration of scientometric analysis for a quantitative finding. A significant addition to the methodology is the implementation of a k-means clustering analysis. The survey had high internal consistency with a Cronbach's alpha of 0.97, and respondents reported frequent and significant claims like delayed drawings, ambiguous documents, and client changes. The results showed that effective claims management requires clear communication and balanced contracts, while poor design and contract documentation cause variations and claims. Spearman's correlation showed strong positive relationships between certain claim types and causes, emphasizing the importance of dealing with these factors to reduce claims. Most respondents said the survey could predict and reduce claims.
- Open Access
- 4 November 2023
- Published by Elsevier in Journal of Engineering Research
- Vol. 12 (1) , 86-99
Exploring the rate of adoption and implementation depth of building information modeling (BIM): A case of Kuwait
- 4 November 2023
- Published by Elsevier in Journal of Engineering Research
- Vol. 12 (1) , 86-99
Open AccessExploring the rate of adoption and implementation depth of building information modeling (BIM): A case of Kuwait
- 1 January 2022
- Published by Hamad bin Khalifa University Press (HBKU Press) in QScience Connect
- Vol. 2022 (1) , 1
Process Pattern Recognition for Building Information Models:A Case Study
Background: The fourth dimension of building information modeling (BIM) plays a significant role in construction planning by linking the construction schedule to the existing building information model. However, a difficulty may arise concerning the ease with which a link can be made and modified. Pattern-based techniques that search for recurring processes can help eliminate this drawback by producing predefined process templates . Methods: This paper critically examines the applicability of generating pre-defined process templates for BIM-based schedules using process pattern recognition techniques to reduce the effort of defining the construction schedules and integrating the templates into the BIM data. The technique estimates the level of recurrence of certain tasks within a schedule by applying several metrics. A real-life construction schedule from a housing project in the State of Kuwait was decomposed into numerous sub-schedules based on a set criterion to estimate the level of recurrence, the sub-schedules were compared based on structural and contextual similarities. Results and Discussion: The generated process templates produced demonstrated that the approach is ideal for projects with repetitive processes and that by utilizing the templates, linking building elements to tasks in 4D modeling can be greatly facilitated, thereby reducing the planning time. Conclusion: This study corroborates the results of previous literature, which found that the improvement in the efficiency of construction planning could be achieved by applying reusable process templates. The generated templates should enable the idea of storing the process templates in data banks for detecting undesired regularities in previous schedules in preparation for future use.
- 1 January 2022
- Published by Hamad bin Khalifa University Press (HBKU Press) in QScience Connect
- Vol. 2022 (1) , 1
Process Pattern Recognition for Building Information Models:A Case Study
Background: The fourth dimension of building information modeling (BIM) plays a significant role in construction planning by linking the construction schedule to the existing building information model. However, a difficulty may arise concerning the ease with which a link can be made and modified. Pattern-based techniques that search for recurring processes can help eliminate this drawback by producing predefined process templates . Methods: This paper critically examines the applicability of generating pre-defined process templates for BIM-based schedules using process pattern recognition techniques to reduce the effort of defining the construction schedules and integrating the templates into the BIM data. The technique estimates the level of recurrence of certain tasks within a schedule by applying several metrics. A real-life construction schedule from a housing project in the State of Kuwait was decomposed into numerous sub-schedules based on a set criterion to estimate the level of recurrence, the sub-schedules were compared based on structural and contextual similarities. Results and Discussion: The generated process templates produced demonstrated that the approach is ideal for projects with repetitive processes and that by utilizing the templates, linking building elements to tasks in 4D modeling can be greatly facilitated, thereby reducing the planning time. Conclusion: This study corroborates the results of previous literature, which found that the improvement in the efficiency of construction planning could be achieved by applying reusable process templates. The generated templates should enable the idea of storing the process templates in data banks for detecting undesired regularities in previous schedules in preparation for future use.