Patrick Johnson
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Patrick Johnson has a total of 35 co-authors. Here are the top co-authors by number of shared publications:
- Allen S. Lee
Virginia Commonwealth University Richmond Virginia USA
1 shared publication Andrew Mckay
Grumman aircraft corporation
1 shared publicationB Shogrin
Ball Aerospace & Technologies Corp. (USA)
1 shared publication- Beatriz Sánchez-Cano
School of Physics and Astronomy University of Leicester Leicester UK
1 shared publication Benjamin Gallagher
Ball Aerospace & Technologies Corp. (USA)
1 shared publicationBob Brown
Ball Aerospace & Technologies Corp. (USA)
1 shared publication
Latest Publications
- Open Access
- 14 November 2023
- Published by Qeios Ltd
Review of: "The Eden Complex: Transgression and Transformation in the Bible, Freud and Jung"
I very much enjoyed reading this article and its exploratory analysis concerning the role of transgression in Jung’s ‘Eden Complex’ for the purposes of individuation and personal growth. The author engages with myth, allegory, religious texts, and ps...
- 14 November 2023
- Published by Qeios Ltd
Open AccessReview of: "The Eden Complex: Transgression and Transformation in the Bible, Freud and Jung"
I very much enjoyed reading this article and its exploratory analysis concerning the role of transgression in Jung’s ‘Eden Complex’ for the purposes of individuation and personal growth. The author engages with myth, allegory, religious texts, and ps...
- Open Access
- 28 March 2022
- Published by Copernicus GmbH
Observations of Energetic Electron Substorm Injection Signatures by Cluster and BepiColumbo During an Earth Flyby
Observations of Energetic Electron Substorm Injection Signatures by Cluster and BepiColumbo During an Earth FlybyWe present an analysis of the energetic electron signatures observed by BepiColumbo and Cluster during the Bepi flyby of Earth on 10 April 2020, as well as other spacecraft. After closest approach, the SIXS instrument on Bepi observed two separate substorm injection fronts, while Cluster RAPID/IES also observed a sequence of energetic electron signatures. Bepi and Cluster were in a particularly favourable configuration during this event, with Bepi moving rapidly radially outward near the nightside equatorial plane while the four Cluster spacecraft cut the same region in a north/south direction in a string of pearls configuration. The coincidence of this favourable geometry with the substorm activity is highly fortuitous and appears to show a complicated sequence of spatially and temporally separated injections and drift echoes.
- 28 March 2022
- Published by Copernicus GmbH
Open AccessObservations of Energetic Electron Substorm Injection Signatures by Cluster and BepiColumbo During an Earth Flyby
Observations of Energetic Electron Substorm Injection Signatures by Cluster and BepiColumbo During an Earth FlybyWe present an analysis of the energetic electron signatures observed by BepiColumbo and Cluster during the Bepi flyby of Earth on 10 April 2020, as well as other spacecraft. After closest approach, the SIXS instrument on Bepi observed two separate substorm injection fronts, while Cluster RAPID/IES also observed a sequence of energetic electron signatures. Bepi and Cluster were in a particularly favourable configuration during this event, with Bepi moving rapidly radially outward near the nightside equatorial plane while the four Cluster spacecraft cut the same region in a north/south direction in a string of pearls configuration. The coincidence of this favourable geometry with the substorm activity is highly fortuitous and appears to show a complicated sequence of spatially and temporally separated injections and drift echoes.
- 8 September 2011
- Published by SPIE-Intl Soc Optical Eng
- Vol. 8146, 814607-814607-12
JWST mirror production status
The James Webb Space Telescope (JWST) is an on axis three mirror anastigmat telescope with a primary mirror, a secondary mirror, and a tertiary mirror. The JWST mirrors are constructed from lightweight beryllium substrates and the primary mirror consists of 18 hexagonal mirror segments each approximately 1.5 meters point to point. Ball Aerospace and Technologies Corporation leads the mirror manufacturing team and the team utilizes facilities at six locations across the United States. The fabrication process for each individual mirror assembly takes approximately six years due to limitations dealing with the number of segments and manufacturing & test facilities. The primary mirror Engineering Development Unit (EDU) recently completed the manufacturing process with the final cryogenic performance test of the mirror segment assembly. The 18 flight primary mirrors segments, the secondary mirror, and the tertiary mirror are all advanced in the mirror production process with many segments through the final polishing process, coating process, final assembly, vibration testing, and final acceptance testing. Presented here is a status of the progress through the manufacturing process for all of the flight mirrors.
- 8 September 2011
- Published by SPIE-Intl Soc Optical Eng
- Vol. 8146, 814607-814607-12
JWST mirror production status
The James Webb Space Telescope (JWST) is an on axis three mirror anastigmat telescope with a primary mirror, a secondary mirror, and a tertiary mirror. The JWST mirrors are constructed from lightweight beryllium substrates and the primary mirror consists of 18 hexagonal mirror segments each approximately 1.5 meters point to point. Ball Aerospace and Technologies Corporation leads the mirror manufacturing team and the team utilizes facilities at six locations across the United States. The fabrication process for each individual mirror assembly takes approximately six years due to limitations dealing with the number of segments and manufacturing & test facilities. The primary mirror Engineering Development Unit (EDU) recently completed the manufacturing process with the final cryogenic performance test of the mirror segment assembly. The 18 flight primary mirrors segments, the secondary mirror, and the tertiary mirror are all advanced in the mirror production process with many segments through the final polishing process, coating process, final assembly, vibration testing, and final acceptance testing. Presented here is a status of the progress through the manufacturing process for all of the flight mirrors.