Xiang Gao
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Xiang Gao has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Bing Wang
College of Energy and Electrical Engineering Hohai University Nanjing China
1 shared publication H. X. Hu
Hohai Univ, Coll Comp & Informat, Nanjing 211100, Jiangsu, Peoples R China
1 shared publicationW. X. Lei
Hohai Univ, Sch Publ Adm, Nanjing 211100, Jiangsu, Peoples R China
1 shared publication- Weiyang Liu
College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
1 shared publication - Xianhui Chen
College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
1 shared publication - Ye Zhang
Tohoku university, Sendai city Japan
1 shared publication
Latest Publications
- Open Access
- 16 April 2019
- Published by MDPI AG in Sustainability
- Vol. 11 (8) , 2290
Distributed Control Strategy of the Leader-Follower for Offshore Wind Farms under Fault Conditions
Because of the complexity and severity of the marine environment, the probability of failure of offshore wind farms is much higher than that of onshore wind farms. The original control might fail under a single-machine and the network communication faults of wind turbines. In this study, centralized control is replaced with distributed control, the leader-follower distributed control strategy under two types of fault conditions is proposed to reduce the adverse effect of failure on the system and improve the tolerance of the system. First, the single-machine system is expanded into a wind turbine cluster system model based on Hamiltonian energy theory. Then, a leader-follower distributed control strategy is proposed to ensure the stable operation of wind turbines under a single-machine fault of the leader or follower unit. Next, considering communication failure, the leader-follower control strategy in the weakly connected topology is designed to make the system and the active power output stable. Finally, the simulation results confirm that the leader-follower control strategy system can enhance the stability and reliability of the system in the case of a unit shut down and network communication faults.
- 16 April 2019
- Published by MDPI AG in Sustainability
- Vol. 11 (8) , 2290
Open AccessDistributed Control Strategy of the Leader-Follower for Offshore Wind Farms under Fault Conditions
Because of the complexity and severity of the marine environment, the probability of failure of offshore wind farms is much higher than that of onshore wind farms. The original control might fail under a single-machine and the network communication faults of wind turbines. In this study, centralized control is replaced with distributed control, the leader-follower distributed control strategy under two types of fault conditions is proposed to reduce the adverse effect of failure on the system and improve the tolerance of the system. First, the single-machine system is expanded into a wind turbine cluster system model based on Hamiltonian energy theory. Then, a leader-follower distributed control strategy is proposed to ensure the stable operation of wind turbines under a single-machine fault of the leader or follower unit. Next, considering communication failure, the leader-follower control strategy in the weakly connected topology is designed to make the system and the active power output stable. Finally, the simulation results confirm that the leader-follower control strategy system can enhance the stability and reliability of the system in the case of a unit shut down and network communication faults.
- 1 June 2018
- Published by DAAAM International in International Journal of Simulation Modelling
- Vol. 17 (2) , 337-346
JOB-SHOP SCHEDULING PROBLEM BASED ON IMPROVED CUCKOO SEARCH ALGORITHM
- 1 June 2018
- Published by DAAAM International in International Journal of Simulation Modelling
- Vol. 17 (2) , 337-346
JOB-SHOP SCHEDULING PROBLEM BASED ON IMPROVED CUCKOO SEARCH ALGORITHM