Hangtian Guo
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Hangtian Guo has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Chengguo Su
School of Hydraulic Science and Engineering, Zhengzhou University, Zhengzhou 450001, China
2 shared publications - Biao Feng
School of Water Conservancy and Transportation, Zhengzhou University, Zhengzhou 450001, China
1 shared publication - Peilin Wang
School of Water Conservancy and Transportation, Zhengzhou University, Zhengzhou 450001, China
1 shared publication - Qizhuan Shao
Yunnan Power Grid Co., Ltd., 73# Tuodong Road, Kunming 650011, China
1 shared publication - Shengqi Jian
College of Water Conservancy and Transportation, Zhengzhou University, Zhengzhou, China
1 shared publication - Shuangquan Liu
System Operation Department, Yunnan Power Grid Co., Ltd., Kunming 650011, China
1 shared publication
Latest Publications
- Open Access
Information Gap Decision-Making Theory-Based Medium- and Long-Term Optimal Dispatching of Hydropower-Dominated Power Grids in a Market Environment
In the high-proportion hydropower market, the fairness of the execution of traded electricity and clean energy consumption are two issues that need to be considered in medium- and long-term dispatching. Aiming at the fairness of medium- and long-term optimal dispatching of hydropower-dominated grids and the problem of water abandonment in the power market environment, this paper proposes a medium- and long-term optimal dispatching method for hydropower-dominated grids based on the information gap decision-making theory (IGDT). Firstly, IGDT is used to establish a two-layer model of medium- and long-term optimal dispatching that considers runoff uncertainty, in which the lower layer solves the maximum value of the maximum difference in the contract power completion rate of the power stations, and the upper layer solves the maximum fluctuation range of the interval inflow. Then, a mixed-integer linear programming (MILP)-based single-layer optimization model is obtained through a variety of linearization techniques, and the model is solved via the CPLEX solver (version 12.10.0). The medium- and long-term optimal dispatching of 10 thermal power stations and 22 hydropower stations in Yunnan Power Grid, China, is taken as an example to verify the proposed model. The results show that the maximum difference in the contracted electricity completion rate of each power station is 0.412, and the amount of abandoned hydropower is reduced by 81.33% compared to when the abandoned water penalty function is not considered. It is proved that the proposed model can effectively alleviate the problems of excessive power generation, insufficient power generation and large-scale hydropower abandonment, which are of great significance for realizing the fair dispatching of hydropower-dominated power grids and promoting clean energy consumption in the market environment.
Open AccessInformation Gap Decision-Making Theory-Based Medium- and Long-Term Optimal Dispatching of Hydropower-Dominated Power Grids in a Market Environment
In the high-proportion hydropower market, the fairness of the execution of traded electricity and clean energy consumption are two issues that need to be considered in medium- and long-term dispatching. Aiming at the fairness of medium- and long-term optimal dispatching of hydropower-dominated grids and the problem of water abandonment in the power market environment, this paper proposes a medium- and long-term optimal dispatching method for hydropower-dominated grids based on the information gap decision-making theory (IGDT). Firstly, IGDT is used to establish a two-layer model of medium- and long-term optimal dispatching that considers runoff uncertainty, in which the lower layer solves the maximum value of the maximum difference in the contract power completion rate of the power stations, and the upper layer solves the maximum fluctuation range of the interval inflow. Then, a mixed-integer linear programming (MILP)-based single-layer optimization model is obtained through a variety of linearization techniques, and the model is solved via the CPLEX solver (version 12.10.0). The medium- and long-term optimal dispatching of 10 thermal power stations and 22 hydropower stations in Yunnan Power Grid, China, is taken as an example to verify the proposed model. The results show that the maximum difference in the contracted electricity completion rate of each power station is 0.412, and the amount of abandoned hydropower is reduced by 81.33% compared to when the abandoned water penalty function is not considered. It is proved that the proposed model can effectively alleviate the problems of excessive power generation, insufficient power generation and large-scale hydropower abandonment, which are of great significance for realizing the fair dispatching of hydropower-dominated power grids and promoting clean energy consumption in the market environment.
- Open Access
Optimal Decomposition for the Monthly Contracted Electricity of Cascade Hydropower Plants Considering the Bidding Space in the Day-Ahead Spot Market
With the gradual opening of China’s electricity market, it is effective for cascade hydropower plants to simultaneously participate in both the monthly contract market and the day-ahead spot market to obtain higher power generation benefits. Hence, this paper studies the optimal decomposition model for the monthly contracted electricity of cascade hydropower plants considering the bidding space in the day-ahead spot market. The close hydraulic and electric connection between cascade hydropower plants, the implementation requirements of contracted electricity, and the uncertainty of the day-ahead market clearing price are all well considered. Several linearization techniques are proposed to address the nonlinear factors, including the objective function and the power generation function. A successive approximation (SA) approach, along with a mixed-integer linear programming (MILP) approach, is then developed to solve the proposed model. The presented model is verified by taking the decomposition of the monthly contracted electricity of cascade hydropower plants in China as an example. The results indicate that the developed model has high computational efficiency and can increase the power generation benefits compared with the conventional deterministic model. The effect of the penalty coefficient for imbalanced monthly contracted electricity is also evaluated, which provides a practical reference for market managers.
Open AccessOptimal Decomposition for the Monthly Contracted Electricity of Cascade Hydropower Plants Considering the Bidding Space in the Day-Ahead Spot Market
With the gradual opening of China’s electricity market, it is effective for cascade hydropower plants to simultaneously participate in both the monthly contract market and the day-ahead spot market to obtain higher power generation benefits. Hence, this paper studies the optimal decomposition model for the monthly contracted electricity of cascade hydropower plants considering the bidding space in the day-ahead spot market. The close hydraulic and electric connection between cascade hydropower plants, the implementation requirements of contracted electricity, and the uncertainty of the day-ahead market clearing price are all well considered. Several linearization techniques are proposed to address the nonlinear factors, including the objective function and the power generation function. A successive approximation (SA) approach, along with a mixed-integer linear programming (MILP) approach, is then developed to solve the proposed model. The presented model is verified by taking the decomposition of the monthly contracted electricity of cascade hydropower plants in China as an example. The results indicate that the developed model has high computational efficiency and can increase the power generation benefits compared with the conventional deterministic model. The effect of the penalty coefficient for imbalanced monthly contracted electricity is also evaluated, which provides a practical reference for market managers.