HKHelena Juliana Kristina

Helena Juliana Kristina

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Helena Juliana Kristina has a total of 9 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Forecasting and Production Planning, Inventory, Capacity, and Distribution Control in Y-Strainer Production in Metal Fitting Industry

    by Natalia Velony Putri, Lina Gozali, Juliana Kristina, Vivian Lim

    PT. DSG is a manufacturing company that produces metal fitting products, with Y-Strainer as the best-selling product. The company imports raw materials with a 2 to 3 weeks lead-time period. For the product demand is fluctuating, the quantity and schedule of ordering raw materials are also uncertain. The company also experienced delays in product delivery by 50% in the past year. Therefore, they need a proposed improvement plan for forecasting and planning production, inventory, and distribution to overcome these problems. This research requires demand data from April 2018 to March 2021 and other supporting data to perform a forecasting calculation. The forecasting method for this research is SMA, DMA, WMA, SES, DES, Cyclic, Linear, Quadratic, Decomposition, and ANN forecasting methods. The next calculation is aggregate planning by shift, overtime, mixed aggregate categories and rough cut capacity planning (RCCP) using CPOF, BOLA, and RPA methods. Material Requirement Planning (MRP) using EOQ, POQ, LFL, Silver Meal, LUC, and WWA lot-sizing and safety stock calculation. The final calculation continues with Capacity Requirement Planning (CRP) and Distribution Requirement Planning (DRP). As a result, the forecasting method chosen for the Y-Strainer product is ANN, for it has the smallest error compared to other methods. Mixed aggregate planning was chosen because it has the smallest total cost. The CRP calculation shows that the capacity is greater than the needs, meaning the company can meet customers' demand from April 2021 to March 2022 with their resources. The lot-sizing technique chosen for the MRP calculation is WWA that can save 22% and distribution planning using DRP can save 52% compared to the method PT. DSG uses now. The Odoo ERP system can help the company control business operations. It is more practical and efficient with data collection being carried out automatically, in real time, and stored in the ERP database. Thus, the delivery of information among departments runs quickly and accurately, which may lead the company to minimize errors.


  • Open Access

    Supply chain management performance measurement using supply chain operation reference (SCOR) approach: Case study of IF Ltd.

    by Andrew Liauw, Helena Juliana Kristina, Wilson Kosasih

    PT. IF is a company engaged in the food manufacturing industry such as hard candy, soft candy, processed pasta, and cake. This research was conducted to focus on the pasta processing division. Nowadays, many companies are working hard in increasing competitiveness through product adjustments, starting from improving quality, reducing costs, and also speeding the response to the market, this is due to consumer demands on the supply chain. Supply chain management is very important in the competitive advantage of a company, therefore measuring supply chain performance is very fundamental for continuous improvement in the company. So far, the company has implemented the supply chain management concept, therefore this research was conducted to measure the performance of supply chain management (SCM) which has been running using the supply chain operation reference (SCOR) approach and obtained the results of supply chain performance assessment on 23 key performance indicators KPIs are divided into 4 categories, namely realiability (19%), Responsiveness (24%), Agility (8%) and Asset (10%) which totaled 61% for the overall assessment which means that the SCOR value is included in the average category. -On average, from the research conducted, recommendations for improvement can be given to PT. IF in order to improve its performance.

  • Open Access

    ANALISIS PENENTUAN RUTE DISTRIBUSI OPTIMAL DENGAN PENDEKATAN MANAJEMEN TRANSPORTASI DAN DISTRIBUSI DI CV. EXPEDISI MITRA MANDIRI

    by Anjeli Yustavia, Lithrone Laricha Salomon, Helena Juliana Kristina

    Dalam kegiatan ekonomi ada proses tambahan yang perlu dilalui. Proses ini umumnya dikenal sebagai "aktivitas distribusi". Kegiatan distribusi juga tidak terlepas dari penggunaan transportasi. CV. Expedisi Mitra Mandiri (EMM) merupakan salah satu badan usaha yang melakukan proses distribusi beras yang berdiri sejak tahun 2016. EMM melakukan proses distribusi untuk wilayah sekitar Jakarta, Bogor, Depok, Tangerang, Bekasi, dan sekitarnya. Distribusi ini biasanya menggunakan moda transportasi berupa truk (trucking) dengan kapasitas 30 ton, 20 ton, dan 10 ton. Diketahui bahwa penggunaan transportasi perusahaan adalah murni milik perusahaan itu sendiri. Dalam proses pendistribusiannya ditemukan beberapa kendala, seperti penggunaan biaya yang terlalu tinggi dan rute pengiriman yang dianggap kurang efektif. Metode yang digunakan adalah metode saving matrix dan algoritma tetangga terdekat, dengan tujuan untuk meminimalkan jarak tempuh dan biaya transportasi. Hasil yang diperoleh menunjukkan penghematan jarak distribusi perusahaan dari 5829,5 km menjadi 4985,6 km, atau efisiensi jarak adalah 14,48%. Penghematan biaya alat angkut mulai dari Rp. 24.941.535,- menjadi Rp. 19.910.688,- atau efisiensi biaya 20,17%.


  • Open Access

    PENERAPAN PRINSIP LEAN MANUFACTURING DALAM PROSES PRODUKSI DI PT. JOTUN INDONESIA

    by Aldo Salim, Helena Juliana Kristina, Carla Olyvia Doaly

    PT. Jotun Indonesia merupakan salah satu perusahaan yang bergerak di industri cat dan pelapis di Indonesia. Dalam produksi diketahui PT. Jotun Indonesia menghadapi beberapa masalah seperti adanya defect ataupun delay yang tinggi dalam proses produksi. Penelitian ini dilakukan untuk mengimplementasikan lean manufacturing, yang merupakan salah satu metode yang dapat digunakan untuk meningkatkan efisiensi dalam proses produksi di PT. Jotun Indonesia dengan mengurangi pemborosan dan meningkatkan value di sepanjang proses produksi. Berdasarkan penelitian ini, diketahui bahwa dalam current state proses produksi di PT. Jotun Indonesia membutuhkan total lead time sebanyak 422,01 menit, dengan process cycle efficiency sebesar 58,89%. Defect rate dalam current state sebanyak 5% dalam proses dissolving, 10% dalam proses let down, dan 8% dalam proses filling. Diketahui waste yang sering muncul diantaranya adalah defect, waiting, dan transport, yang masing-masing terjadi karena berbagai faktor manusia, mesin, material, metode, atau lingkungan. Usulan perbaikan yang diajukan diantaranya adalah pembuatan one point lesson mengenai pemindahan barang jadi dan pencetakan manual label, pengadaan workshop, dan penambahan fasilitas kerja. Setelah menerapkan usulan perbaikan, total lead time berubah menjadi 382,35 menit, dengan process cycle efficiency sebesar 64,26%. Defect rate proses filling mengalami perubahan dalam future state dari nilai 8% menjadi 3%. Terdapat pengurangan total lead time sebesar 39,66 menit dan peningkatan process cycle efficiency sebesar 5,38%.