К.і. Shevchuk
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
К.і. Shevchuk has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Anton Kovtun
Kyiv National University of Construction and Architecture
1 shared publication - Denis Dubinin
Kyiv National University of Construction and Architecture, Ukraine
1 shared publication - N. Vilnytska
Київський національний університет будівництва і архітектури, м. Київ
1 shared publication - Olha Bielienkova
Kyiv National University of Construction and Architecture, Ukraine
1 shared publication - Tetiana Tsyfra
Kyiv National University of Construction and Architecture
1 shared publication - Volodymyr Gavrilyuk
Київський національний університет будівництва і архітектури, м. Київ
1 shared publication
Latest Publications
- Open Access
- 27 November 2025
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 3 (56) , 296-306
Cost engineering as an innovative tool for economic stabilization and financial diagnostics of construction participants in the conditions of a changing environment of development projects of post-war reconstruction
The article substantiates the feasibility of using cost engineering as an innovative management tool for economic stabilization and financial diagnostics of construction participants in the conditions of a changing environment of the implementation of development projects of post-war reconstruction. The relevance of the study is due to the increasing level of uncertainty, risks and resource constraints in the construction sector, which requires a transition from traditional approaches to cost management to complex methodologies focused on achieving value, financial stability and adaptability of development subjects.The study summarizes scientific approaches to the interpretation of economic security, financial stability and financial diagnostics of construction enterprises, and also analyzes the evolution of cost engineering from a tool for local cost reduction to an integrated mechanism for value management at all stages of the project life cycle. Particular attention is paid to the role of financial modeling, investment analysis, budgeting, life cycle analysis and cash flow management in the cost engineering system. It is proven that the combination of functional-cost analysis with financial and risk-oriented tools allows not only to optimize the cost structure, but also to carry out financial diagnostics of construction participants, timely identify threats to their economic stability and form sound management decisions. It is substantiated that in post-war reconstruction projects, cost engineering acquires special importance as a tool for ensuring the transparency of financial flows, rational use of investment and public resources, and achieving a balance between economic efficiency, quality, and social feasibility of project solutions.The practical significance of the results obtained lies in the possibility of using the proposed approaches by public administration bodies, development companies, investors, and contracting organizations in planning and implementing construction projects in post-crisis and post-war conditions. The scientific novelty of the study lies in the justification of cost engineering as an integration tool for economic stabilization and financial diagnostics, adapted to the conditions of high turbulence in the development environment.
- 27 November 2025
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 3 (56) , 296-306
Open AccessCost engineering as an innovative tool for economic stabilization and financial diagnostics of construction participants in the conditions of a changing environment of development projects of post-war reconstruction
The article substantiates the feasibility of using cost engineering as an innovative management tool for economic stabilization and financial diagnostics of construction participants in the conditions of a changing environment of the implementation of development projects of post-war reconstruction. The relevance of the study is due to the increasing level of uncertainty, risks and resource constraints in the construction sector, which requires a transition from traditional approaches to cost management to complex methodologies focused on achieving value, financial stability and adaptability of development subjects.The study summarizes scientific approaches to the interpretation of economic security, financial stability and financial diagnostics of construction enterprises, and also analyzes the evolution of cost engineering from a tool for local cost reduction to an integrated mechanism for value management at all stages of the project life cycle. Particular attention is paid to the role of financial modeling, investment analysis, budgeting, life cycle analysis and cash flow management in the cost engineering system. It is proven that the combination of functional-cost analysis with financial and risk-oriented tools allows not only to optimize the cost structure, but also to carry out financial diagnostics of construction participants, timely identify threats to their economic stability and form sound management decisions. It is substantiated that in post-war reconstruction projects, cost engineering acquires special importance as a tool for ensuring the transparency of financial flows, rational use of investment and public resources, and achieving a balance between economic efficiency, quality, and social feasibility of project solutions.The practical significance of the results obtained lies in the possibility of using the proposed approaches by public administration bodies, development companies, investors, and contracting organizations in planning and implementing construction projects in post-crisis and post-war conditions. The scientific novelty of the study lies in the justification of cost engineering as an integration tool for economic stabilization and financial diagnostics, adapted to the conditions of high turbulence in the development environment.
- Open Access
- 11 November 2022
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 2 (50) , 123-129
Determining the estimated cost of project works using aggregated indicators of labor intensity.
The article is devoted to the determination of the estimated cost of project works using aggregated indicators of labor intensity. The instruction on determining the estimated cost of design works of construction objects provides for the application of percentage indicators of the cost of design works to the calculation base. The cost of the calculation base is determined with the help of similar objects, or by aggregated indicators of the cost of construction per unit of measurement. The use of analog objects has a number of disadvantages, namely: limited experience and qualifications of designers, an indefinite number of comparative objects that are available in the archive of the project enterprise, the total cost of the analog object includes the cost of material resources that affect on the estimated cost of the analogue object, and accordingly on the cost of the estimated project documentation. To get rid of the presence of the specified shortcomings, it is necessary to change the basis of justification for determining the cost of project works. It was found that the basis can only be regulatory labor intensity, as it is stable and uniform for all regions of Ukraine. The authors propose to change the basis of the justification for determining the cost by arriving at the determination of the labor intensity of the analogue object using the following methodology. The methodology shows the extent to which specific values of technical and economic indicators change for homogeneous groups of housing reconstruction objects and regression equations of specific values of labor intensity for certain types of works of a similar object. The methodology was developed on the basis of normative labor intensity values of more than 30 objects of housing reconstruction. It was determined that the normative labor intensity depends on the technical and economic indicators of the objects under investigation, namely: perimeter, height, superstructure volume and base area. As a result of the study, the limits of technical and economic indicators corresponding to 3 regression models of specific values of normative labor intensity were obtained. To verify the specified methodology, an example of determining the specific labor costs of a similar object depending on the specific values of the technical and economic indicators of the new object based on the regression equations of homogeneous groups is given. According to the equations of homogeneous groups and the corresponding technical and economic indicators, a search is made for the correspondence of the technical and economic indicators of the object under study. The specified method allows you to find a quantitative estimate of the cost of project works by individual types.
- 11 November 2022
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 2 (50) , 123-129
Open AccessDetermining the estimated cost of project works using aggregated indicators of labor intensity.
The article is devoted to the determination of the estimated cost of project works using aggregated indicators of labor intensity. The instruction on determining the estimated cost of design works of construction objects provides for the application of percentage indicators of the cost of design works to the calculation base. The cost of the calculation base is determined with the help of similar objects, or by aggregated indicators of the cost of construction per unit of measurement. The use of analog objects has a number of disadvantages, namely: limited experience and qualifications of designers, an indefinite number of comparative objects that are available in the archive of the project enterprise, the total cost of the analog object includes the cost of material resources that affect on the estimated cost of the analogue object, and accordingly on the cost of the estimated project documentation. To get rid of the presence of the specified shortcomings, it is necessary to change the basis of justification for determining the cost of project works. It was found that the basis can only be regulatory labor intensity, as it is stable and uniform for all regions of Ukraine. The authors propose to change the basis of the justification for determining the cost by arriving at the determination of the labor intensity of the analogue object using the following methodology. The methodology shows the extent to which specific values of technical and economic indicators change for homogeneous groups of housing reconstruction objects and regression equations of specific values of labor intensity for certain types of works of a similar object. The methodology was developed on the basis of normative labor intensity values of more than 30 objects of housing reconstruction. It was determined that the normative labor intensity depends on the technical and economic indicators of the objects under investigation, namely: perimeter, height, superstructure volume and base area. As a result of the study, the limits of technical and economic indicators corresponding to 3 regression models of specific values of normative labor intensity were obtained. To verify the specified methodology, an example of determining the specific labor costs of a similar object depending on the specific values of the technical and economic indicators of the new object based on the regression equations of homogeneous groups is given. According to the equations of homogeneous groups and the corresponding technical and economic indicators, a search is made for the correspondence of the technical and economic indicators of the object under study. The specified method allows you to find a quantitative estimate of the cost of project works by individual types.
- Open Access
- 11 November 2022
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 2 (50) , 153-161
Theoretical approaches to the analysis of the life cycle costs of the project for the construction and reconstruction of sports and recreational facilities in Australia
The article highlights the theoretical approaches to cost analysis of the life cycle of a construction project. Most sport and recreation facilities in Australia are built or renovated with funding from the Department of Sport and Recreation. An important part of the financing process is making sure that the community can bear the real costs of operating and maintaining the facility in the future. The Life Cycle Cost Guidelines provide facility owners, architects and engineers with the tools they need to develop life cycle cost reports to be used by the department when it reviews publicly owned or community funded facilities. The Department of Sport and Recreation is committed to achieving the most desired project outcomes that reduce capital expenditure in the sport and recreation industry Developing a life cycle costing approach when considering project parameters will provide a strong and informed basis on which to make the most effective financial, economic and operational decisions decision. Life cycle costing is a key asset management tool that considers the entire life cycle of planning, acquisition, operation, maintenance and disposal of an asset. The final decision may include a number of additional factors outside of the LCCA process, such as local policies, availability of funding, rating of repair deficiencies , the ability of the industry to perform the required construction and the experience of the agency, and the accuracy of the design. The generalization of theoretical approaches shows the possibility of applying methods of financing the construction/reconstruction of objects, taking into account the analysis of the costs of the life cycle of the project of new construction and reconstruction of sports and recreational facilities not only in Australia, but also their adaptation to Ukrainian realities in the conditions of post–war reconstruction.
- 11 November 2022
- Published by Kyiv National University of Construction and Architecture in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
- Vol. 2 (50) , 153-161
Open AccessTheoretical approaches to the analysis of the life cycle costs of the project for the construction and reconstruction of sports and recreational facilities in Australia
The article highlights the theoretical approaches to cost analysis of the life cycle of a construction project. Most sport and recreation facilities in Australia are built or renovated with funding from the Department of Sport and Recreation. An important part of the financing process is making sure that the community can bear the real costs of operating and maintaining the facility in the future. The Life Cycle Cost Guidelines provide facility owners, architects and engineers with the tools they need to develop life cycle cost reports to be used by the department when it reviews publicly owned or community funded facilities. The Department of Sport and Recreation is committed to achieving the most desired project outcomes that reduce capital expenditure in the sport and recreation industry Developing a life cycle costing approach when considering project parameters will provide a strong and informed basis on which to make the most effective financial, economic and operational decisions decision. Life cycle costing is a key asset management tool that considers the entire life cycle of planning, acquisition, operation, maintenance and disposal of an asset. The final decision may include a number of additional factors outside of the LCCA process, such as local policies, availability of funding, rating of repair deficiencies , the ability of the industry to perform the required construction and the experience of the agency, and the accuracy of the design. The generalization of theoretical approaches shows the possibility of applying methods of financing the construction/reconstruction of objects, taking into account the analysis of the costs of the life cycle of the project of new construction and reconstruction of sports and recreational facilities not only in Australia, but also their adaptation to Ukrainian realities in the conditions of post–war reconstruction.