Desi Winoto
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Desi Winoto has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Farrel Stefan Sienera
Industrial Engineering Petra Christian University
1 shared publication - I. Gede Agus Widyadana
Petra Christian University
1 shared publication - Tanti Octavia
Petra Christian University
1 shared publication
Latest Publications
- Open Access
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2951 (1)
Rolling forecast as an alternative tool for short term production planning: A case study of bicycle manufacturer
The accuracy of production planning is crucial that must be achieved by manufacturing companies. Production planning is sensitive to sales patterns and the availability of raw materials. Production planning must be in line with raw material planning. To ensure that the raw materials are available, production planning has to be deed in advance. In the waiting period for these raw materials, sales patterns may change so that the forecast and actual value deviations differ significantly. A dynamic mechanism of calculating the value of safety stock is carried out and carrying out the correction function of forecasting value by rolling forecast for overcoming it. Rolling forecasts allow forecasts of updated forecasting due to changes in sales patterns detected from actual sales value renewal. Using a rolling forecast as an alternative tool in forecast correction can reduce excess inventory by up to fifty-seven percent.
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2951 (1)
Open AccessRolling forecast as an alternative tool for short term production planning: A case study of bicycle manufacturer
The accuracy of production planning is crucial that must be achieved by manufacturing companies. Production planning is sensitive to sales patterns and the availability of raw materials. Production planning must be in line with raw material planning. To ensure that the raw materials are available, production planning has to be deed in advance. In the waiting period for these raw materials, sales patterns may change so that the forecast and actual value deviations differ significantly. A dynamic mechanism of calculating the value of safety stock is carried out and carrying out the correction function of forecasting value by rolling forecast for overcoming it. Rolling forecasts allow forecasts of updated forecasting due to changes in sales patterns detected from actual sales value renewal. Using a rolling forecast as an alternative tool in forecast correction can reduce excess inventory by up to fifty-seven percent.
- Open Access
- 29 November 2022
- Published by Petra Christian University in Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri
- Vol. 24 (2) , 141-150
A Simulation-based Optimization Approached to Design a Proposed Warehouse Layout on Bicycle Industry
The finished goods must be stored in a warehouse before the items are dispatched. Due to the increasing demand in 2020, there will be an increase in the quantity of items, which will cause the finished goods warehouse at PT X to reach capacity. This issue lengthens the flow through the warehouse and makes it easier for the items to sustain damage. To improve capacity, the firm is building a new finished goods warehouse, and it wants to organize the two warehouses so that the displacement time is as short as possible. This study utilized simulations to calculate the time and dedicated and class-based storage strategies to establish the layout. This study utilized simulations to determine the time and dedicated and class-based storage approaches to establish the layout. According to the findings, the dedicated storage technique has a total displacement distance of 703,952 meters and an average moving duration of 3.37 minutes per pallet. These findings are not as useful as the class-based storage technique, which has 705,961 meters and an average pallet turn time of 3.53 minutes.
- 29 November 2022
- Published by Petra Christian University in Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri
- Vol. 24 (2) , 141-150
Open AccessA Simulation-based Optimization Approached to Design a Proposed Warehouse Layout on Bicycle Industry
The finished goods must be stored in a warehouse before the items are dispatched. Due to the increasing demand in 2020, there will be an increase in the quantity of items, which will cause the finished goods warehouse at PT X to reach capacity. This issue lengthens the flow through the warehouse and makes it easier for the items to sustain damage. To improve capacity, the firm is building a new finished goods warehouse, and it wants to organize the two warehouses so that the displacement time is as short as possible. This study utilized simulations to calculate the time and dedicated and class-based storage strategies to establish the layout. This study utilized simulations to determine the time and dedicated and class-based storage approaches to establish the layout. According to the findings, the dedicated storage technique has a total displacement distance of 703,952 meters and an average moving duration of 3.37 minutes per pallet. These findings are not as useful as the class-based storage technique, which has 705,961 meters and an average pallet turn time of 3.53 minutes.